Letter of compliance | | | 6/1/2005 | | DONE |
|
|
|
Letter of Compliance issued 6-1-05.
|
FIRE-Final Inspection | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | PASS |
Troy Cobbley
|
|
|
Curbing for the fire dept access has been installed as discussed. Fire life safety finaled
|
BLD-Conference | 11/16/2004 | 11/22/2004 | 11/22/2004 | A | PASS |
Tony Young
|
|
|
DARRIN PH####-####
temp occ. has been issued 11/22/2004 3:58:10 PM
|
Temporary occupancy | | | 11/22/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5173 issued 11-22-04 to the Daren Blaser Bldg.
|
BLD-Conference | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | PART |
Tony Young
|
|
|
Darrin,,, ###-####
working on it,,,, Cathy W. is also helping 11/16/2004 2:29:58 PM
|
BLD-Conference | 11/9/2004 | 11/9/2004 | 11/9/2004 | P | PART |
Tony Young
|
|
|
getting paperwork 11/15/2004 10:48:58 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | NR |
Tony Young
|
|
|
|
BLD-Final | 3/23/2004 | 3/24/2004 | 3/24/2004 | A | PART |
Tony Young
|
|
|
Darren, ph# ###-####
ok after trades,,, also see BLD03-02405 for trades 3/24/2004 9:46:01 AM
|
BLD-Final | 3/22/2004 | 3/23/2004 | 3/23/2004 | A | CANC |
Tony Young
|
|
|
###-#### darren
|
FIRE-Final Inspection | 3/22/2004 | 3/23/2004 | 3/23/2004 | A | PART |
Troy Cobbley
|
|
|
Life safety finaled 3/23/2004 8:09:08 AM
|
BLD-Final | 3/23/2004 | 3/23/2004 | 3/23/2004 | P | NR |
Tony Young
|
|
|
Darrin, phone# ###-####
conf. only 3/23/2004 3:48:38 PM
|
FIRE-Final Inspection | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide and test duct smoke detectors per IMC. Provide the correct remote leds. Paint curbing. Provide"door to remain unlocked during business hours" sticker. Provide approved door hardware on pocket doors and south facing exit door. Provide annual inspection for the fire extinguishers 3/19/2004 3:41:52 PM
|
Print Occupancy Form | | | 3/17/2004 | | DONE |
|
|
|
|
BLD-Conference | 2/13/2004 | 2/13/2004 | 2/13/2004 | P | PASS |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok to cover all, may need alt. plan on changes to int wall and energy report on ceiling change 2/17/2004 10:29:21 AM
|
BLD-Conference | 2/6/2004 | 2/6/2004 | 2/6/2004 | P | PART |
Tony Young
|
|
|
jeff ###-####
conf w/ architect, builder on changes to approved plans 2/6/2004 4:15:22 PM
|
BLD-Conference | 2/4/2004 | 2/5/2004 | 2/5/2004 | A | CANC |
Steven Webb
|
|
|
jim ###-####
|
BLD-Framing/Rough-in | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | PART |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ok to cover int. non-bearing partitions,,,, conf. on rest of framing 2/4/2004 2:04:22 PM
|
Override - People Holds | 1/1/1900 | 1/1/1900 | 2/3/2004 | | |
|
|
|
|
BLD-Framing/Rough-in | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | NR |
Tony Young
|
|
|
jeff-- ###-####
|
BLD-Framing/Rough-in | 1/15/2004 | 1/20/2004 | 1/20/2004 | A | PART |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ext. shear ok 1/20/2004 9:51:55 AM
|
BLD-Conference | 12/29/2003 | 12/30/2003 | 12/30/2003 | A | PASS |
Tony Young
|
|
|
JEFF; Phone #: ###-#### Internet Inspection Request from: Darla Downs
conf. on 12 ft walls, ok w/ new engineering 2x6,
need to verify spacing of anchor bolts in sill plate 12/30/2003 11:28:10 AM
|
Plan resubmittals received | | | 12/18/2003 | | DONE |
|
|
|
Received two copies of reviesed sheet A2-3 and two copies of reivsed calcs and one copy of cover letter. Routed to Tony Young kmm
|
BLD-Framing/Rough-in | 12/10/2003 | 12/11/2003 | 12/11/2003 | A | NR |
Tony Young
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Foundation | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PART |
Tony Young
|
|
|
early pm please
|
BLD-Footing | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | NR |
Tony Young
|
|
|
BILL ###-####
|
BLD-Footing | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PART |
Tony Young
|
|
|
bill, ph# ###-####,, 2nd half of ftgs, wip 12/9/2003 2:29:25 PM
|
BLD-Footing | 12/8/2003 | 12/8/2003 | 12/8/2003 | A | PART |
Troy James
|
|
|
|
(F) Reprint permit | | | 12/8/2003 | | |
|
|
|
|
BLD-Footing | 12/5/2003 | 12/5/2003 | 12/5/2003 | P | NR |
Tony Young
|
|
|
Bill, re-inspection
|
BLD-Footing | 12/4/2003 | 12/5/2003 | 12/5/2003 | A | FAIL |
Tony Young
|
|
|
BILL ###-####
need soil report 12/5/2003 11:12:51 AM
|
Issue PAID IN FULL permit | | | 12/5/2003 | | DONE |
|
|
|
|
BLD-Footing | 12/4/2003 | 12/4/2003 | 12/4/2003 | P | NR |
Tom Arcoraci
|
|
|
BILL ###-#### no one one site no plans 12/4/2003 4:46:32 PM
|
Routing - PLAN CHECK | 12/2/2003 | | 12/4/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/4/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/4/2003 | | |
|
|
|
CALLED BILL PERMIT READY & FEE GIVEN ALSO NEED ACHD...DLD 12-4-03 11
|
CHANGE STATUS TO (R) | | | 12/4/2003 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/24/2003 | | 12/4/2003 | | PASS |
|
|
|
Contacted PDQ to take revised plans of nov 19, to outside engineering.
|
Plan assigned to (MLO) | 10/6/2003 | | 12/4/2003 | | PASS |
Mike Otto
|
|
|
12/4/2003 10:09:58 MLO - activity updated through activity BLDA022 from case BLD03-02407.
|
Plan resubmittals received | | | 12/2/2003 | | DONE |
|
|
|
Received four copies of revised sheets A3-1, A4-2, M1-1, E1-3. One copy of response letter. Routed to Mike O. kmm
|
Routing - FIRE | 12/1/2003 | | 12/1/2003 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLUMBING | 11/28/2003 | | 11/28/2003 | | PASS |
|
|
|
1. cold and hot water lines need to be sized per upc. 2. fixtures must be ada compiant. 3. water service must have backflow protection. 4. building needs expansion protection 5. need drinking fountain or bottled water provided 6. need extra cold water with valve at service sink in case a soap dispenser is installed in future 7. water heater may require a pan with a drain
|
Routing - PLANNING | 11/25/2003 | | 11/26/2003 | | PASS |
|
|
|
Approved per DRH03-7 and DRH03-7 Mod. #1
|
Routing - PLAN CHECK | 11/21/2003 | | 11/24/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals received | | | 11/24/2003 | | DONE |
|
|
|
Received four copies of revised sheets P1-1. Routed to Mike O. kmm
|
Plan resubmittals requested | | | 11/24/2003 | | DONE |
|
|
|
IBC corrections
|
Routing - PLANNING | 11/21/2003 | | 11/21/2003 | | FAIL |
|
|
|
Planning is ready as of 10/31 for re-route
There was a complete redesign of the parking lot layout that is not included in this set of drawings. Will notify applicant of the need to update the building set.
|
Routing - PUBLIC WORKS | 11/18/2003 | | 11/21/2003 | | PASS |
|
|
|
Public Works ready for re-review as of 11/6
|
Plan resubmittals received | | | 11/19/2003 | | DONE |
|
|
|
Received four copies of revised sheets A1-1, A1-2, A2-1, A2-2, A2-3, A2-4, A3-1, A4-1, A4-2, L1-1, M1-1, E1-1, E1-2. One copy of response letter, one copy of struct. response letter, detail D-4, response letter for Sam Rogers and one copy of DR MOD03-00007. Routed to Mike Otto. kmm
|
Plan Review Completed(1st rev) | | | 11/7/2003 | | DONE |
|
|
|
|
Routing - FIRE | 10/30/2003 | | 11/7/2003 | | FAIL |
|
|
|
This permit reviewed as "shell" only. See BLD03-02405 for the Jamaca-Me-Tan TI work.
FD access, hydrant, and fire alarm issues. Tried to fax and e-mail architect, neither worked, left voice message for him. .
|
Routing Off Site - STRUCTURAL | 10/6/2003 | | 10/30/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm corrections sent to architect
|
Plan resubmittals requested | | | 10/30/2003 | | DONE |
|
|
|
IBC non-struc and struc
|
Routing - PLAN CHECK | 10/23/2003 | | 10/30/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 10/22/2003 | | 10/23/2003 | | FAIL |
|
|
|
new buildings require stamped drawings showing drain, waste and vents, potable water in building and sewer and water to the building
|
Plan resubmittals received | | | 10/22/2003 | | DONE |
|
|
|
Received five copies of revised sheet C1.0. One copy of O&M manual and drainage report Routed to Mike O. kmm
|
Routing - PLANNING Land Div | 10/20/2003 | | 10/21/2003 | | PASS |
|
|
|
Approved, parcel created by Warranty Deed 215 998 recorded on March 13, 1957.
|
Routing - PLANNING | 10/16/2003 | | 10/16/2003 | | FAIL |
|
|
|
Conditions 1o of the DR approval states that the plans for the water feature must be submitted to staff before the building documents can be approved. No plans have been submitted. The applicant (Darren Blaser) and his architect (Thomas Whitworth) have been notified.
|
Routing - PUBLIC WORKS | 10/8/2003 | | 10/16/2003 | | FAIL |
|
|
|
Requires drainage plan additions per Brian M. kmm
|
Routing - Erosion and Sediment | 10/16/2003 | | 10/16/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING Land Div | 10/6/2003 | | 10/7/2003 | | FAIL |
|
|
|
Need to verify legal land division.
|
Plans ACCEPTED BY PLAN TECH | | | 10/6/2003 | | |
|
|
|
No plumb., mech., or elect. plans submitted. kmm
|
Plan routing begun/NEW & ADDTN | | | 10/6/2003 | | DONE |
|
|
|
|
Application received | | | 10/3/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 10/3/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/3/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 10/3/2003 | | |
|
|
|
|
Fee Review-notes | 10/3/2003 | 10/3/2003 | | | |
|
|
|
|