Permit Information
Permit NumberBLD03-02467
StatusFinaled
Name HOLLYWOOD VIDEO
Site Address 8184 W OVERLAND RD
Project NameVENTURE DEVELOPMENT
Customer Number 
ePlanReviewNo
Description
(HOLLYWOOD VIDEO)(VENTURE DEVELOPMENT GROUP BLDG) New 6,500 sq.ft. retail tenant in west end of existing building per approved plans on file. A "vanilla finish" permit for the space was done under BLD03-02215. Shell building was done under BLD03-00706. Work to include new interior walls, interior doors and windows, interior finish, new counters/fixtures, two new accessible restrooms, fire sprinkler work, new mechanical, new plumbing, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase. (PC#0627-03) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/28/20041/28/2004 DONE
Permanent occupancy  1/28/2004 DONE
Perm. Occ. Cert. # 9950 issued 1-28-04 to Hollywood Video.
Permanent Occupancy 1/27/20041/27/2004 DONE
Details
BLD-Final1/26/20041/27/20041/27/2004APASS
DetailsRuss Owen
Herb, ###-####. Ok perm oc schell and core finaled. 1/27/2004 11:14:23 AM
FIRE-Final Inspection1/8/20041/8/20041/8/2004PPASS
DetailsTroy Cobbley
Fire life safety, fire alarm and fire sprinkler finaled
(F) Reprint permit  12/19/2003 DONE
BLD-Final12/8/200312/9/200312/9/2003ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/8/2003 at 12:36:19 PM. Contact: ###-####. needs all required signatures. 12/10/2003 9:19:31 AM
FIRE-Final Inspection12/9/200312/9/200312/9/2003PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/9/2003 at 9:04:17 AM. Contact: ###-####. gates to openable from the inside without special knowledge 12/9/2003 2:33:27 PM
BLD-Final12/9/200312/9/200312/9/2003PPART
DetailsRuss Owen
Ok temp oc needs mec and special inspection final report needs to be stamped by MTI engineer. also 2 doors need threshold touch up contractor on site. 12/10/2003 9:25:47 AM
FIRE-Final Inspection12/9/200312/9/200312/9/2003PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Framing/Rough-in11/14/200311/14/200311/14/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/14/2003 at 10:20:20 AM. Contact: ###-####. Interior walls ok but exterior exit door has swing wrong on wrong will resolve before final. 11/13/2003 11:54:46 PM
Print Occupancy Form  11/10/2003 DONE
Inspection Record Card- Bld  11/10/2003 DONE
CHANGE STATUS TO (R)  11/10/2003 DONE
Telephone call  11/10/2003 DONE
called Mike permit ready & fee given 11-10-03 9:55 am ///dld
Issue PAID IN FULL permit  11/10/2003 DONE
Routing - PLAN CHECK11/5/2003 11/7/2003 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  11/7/2003 PASS
Plan assigned to (JCB)10/13/2003 11/7/2003 PASS
DetailsJason Blais
11/7/2003 15:56:09 JCB - activity updated through activity BLDA022 from case BLD03-02467.
Telephone call  11/6/2003  
Called architect representative concerning one issue. He said he would address and get back to me.
Plan resubmittals received  11/5/2003 DONE
Received response letter, Certificate of Value, Structural Calculation for partition, two sets of sheets A1,A2,FX,GI,PI,M1, taken to Jason B.
Routing - FIRE10/28/2003 11/4/2003 PASS
Plan resubmittals requested  10/28/2003  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK10/14/2003 10/28/2003 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
Routing - PUBLIC WORKS10/13/2003 10/14/2003 PASS
Plans ACCEPTED BY PLAN TECH  10/13/2003 DONE
Application received  10/9/2003  
Recd Pcfee & Taken To Pln CK  10/9/2003  
Fee Review-notes10/9/200310/9/2003