Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-02470
StatusFinaled
Name HAUN GROUP INC
Site Address 11398 W ARCH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1171 sq. ft. two story single family dwelling with a 249 sq. ft. attached one car garage, a 30 sq. ft. covered entry way, a 120 sq. ft. concrete patio at side of structure and additional off-street parking per approved plans, all red-lining and attached requirement lists. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City. (1st floor 646 sq. ft.)(2nd floor 525 sq. ft.) PC #619 DJO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/4/2006  
BLD-Final2/3/20042/4/20042/4/2004APASS
DetailsJim Sly
harry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/C issued. 2/4/2004 12:21:51 PM
DOC - Permit Finaled2/4/20042/4/20042/4/2004PPASS
DetailsJim Sly
Finaled by inspector at 2/4/2004 12:22:02 PM
BLD-Final2/2/20042/3/20042/3/2004AFAIL
DetailsJim Sly
Harry --- call for key location. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes C/N temp glass stairw..... 2/3/2004 10:20:22 AM
BLD-Energy code compliance12/15/200312/16/200312/16/2003APASS
DetailsJim Sly
Harry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in12/11/200312/12/200312/12/2003APART
DetailsJim Sly
Harry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK to insulate.....Need temp glass at 3 windows (stairway). Ustick.....S Wildwood R Arch 12/12/2003 9:56:14 AM
BLD-Footing10/27/200310/27/200310/27/2003PPART
DetailsRuss Owen
###-####- jerry ok pending compaction report contractor notified. 10/26/2003 10:59:04 PM
Issue PAID IN FULL permit  10/24/2003 DONE
Plan assigned to (DJO)10/16/200310/16/200310/16/2003 PASS
DetailsDan Overy
Plan Review Report  10/16/2003 DONE
Inspection Record Card- Bld  10/16/2003 DONE
Permit Ready to Issue  10/16/2003 DONE
Telephone call  10/16/2003 DONE
Left message for Harry that permit is ready & fees
Routing - PLAN CHECK10/13/2003 10/16/2003 PASS
Plans ACCEPTED BY PLAN CHECK  10/16/2003  
PLANS/APPL TAKEN TO FRONT DESK  10/16/2003 DONE
Routing - PUBLIC WORKS10/10/2003 10/13/2003 PASS
Routing - PLANNING Land Div10/10/2003 10/10/2003 PASS
Approved as Parcel "A" by ROS 6182 recorded on 6/11/03.
Routing - PLANNING10/10/2003 10/10/2003 PASS
Application received  10/10/2003