Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/24/2004 | 4/26/2005 | | DONE |
|
|
|
|
First Notice | | 6/24/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 6/24/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10198 issued 6-24-04 to the Idaho Food Bank.
|
Permanent Occupancy | | 6/21/2004 | 6/21/2004 | | DONE |
|
|
|
|
BLD-Final | 6/21/2004 | 6/21/2004 | 6/21/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/21/2004 at 8:25:38 AM. Contact: ###-####. ok for perm occ 6/21/2004 3:13:18 PM
|
BLD-Final | 6/16/2004 | 6/18/2004 | 6/18/2004 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/16/2004 at 11:07:27 AM. Contact: ###-####.
|
FIRE-Final Inspection | 6/16/2004 | 6/17/2004 | 6/17/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/16/2004 at 11:05:47 AM. Contact: ###-####.
|
BLD-Final | 6/11/2004 | 6/15/2004 | 6/15/2004 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/11/2004 at 2:47:00 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/11/2004 | 6/14/2004 | 6/14/2004 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/11/2004 at 2:45:20 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/22/2004 | 4/22/2004 | 4/22/2004 | P | PASS |
Jim Storey
|
|
|
Brandon -- ceiling grid; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok ceilling. 4/22/2004 2:00:43 PM
|
BLD-Framing/Rough-in | 4/8/2004 | 4/9/2004 | 4/9/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/8/2004 at 1:12:46 PM. Contact: ###-####. beams and post added to pick up load for removal of bearing wall ok to cover cieling grid c/n item completed and insulation added to cantilevered floor area 4/9/2004 9:18:52 AM
|
BLD-Framing/Rough-in | 4/7/2004 | 4/8/2004 | 4/8/2004 | A | FAIL |
Russ Owen
|
|
|
out of time rolled over.Scheduled by a contractor via Hello! on 4/7/2004 at 9:29:30 AM. Contact: ###-####. Gave a c/n to contractor on site, for a beam and posts added in break room , for support of bearing floor joist above. Need engineering for this, Note:I only looked at the north end lower floor, non- bearing wall office partitions. And break room,No approval for any other portion of this building or re-inspection of any portion, no other inspection requested by builder. 4/7/2004 6:34:18 PM 4/7/2004 6:35:04 PM
|
BLD-Framing/Rough-in | 4/7/2004 | 4/7/2004 | 4/7/2004 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/7/2004 at 9:29:30 AM. Contact: ###-####.
|
FIRE-Conference | 3/26/2004 | 3/29/2004 | 3/29/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 3/26/2004 at 11:50:06 AM. Contact: ###-####. Met with GC about requirements for final - sprinklers overspaced at draft stop; extinguishers overdue; gauge on riser broken; exit door hardware; knox box to main entrance; remove hose on from hose stations; clarify east exit door; repair draft stops 3/29/2004 9:23:29 AM
|
BLD-Other | 3/25/2004 | 3/26/2004 | 3/26/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/25/2004 at 3:47:41 PM. Contact: ###-####. min 6 inches support of mains/hvac support/insulate soffit and rim joist. 3/26/2004 4:31:23 PM
|
BLD-Framing/Rough-in | 3/2/2004 | 3/3/2004 | 3/3/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/2/2004 at 2:02:19 PM. Contact: ###-####. interior framing ok for cover. 3/3/2004 3:41:30 PM
|
BLD-Framing/Rough-in | 2/26/2004 | 2/26/2004 | 2/26/2004 | P | CANC |
Jim Storey
|
|
|
Brandon, ###-#### rolled per requist. 2/26/2004 11:37:04 AM
|
BLD-Framing/Rough-in | 2/26/2004 | 2/26/2004 | 2/26/2004 | P | PART |
Troy James
|
|
|
Brandon, ###-####
ok to sheetrock structural walls. Need solid risers to new stair and pony wall under stair. Need positive connection at wall plates to beam and beam to beam connection. 2/26/2004 1:08:44 PM
|
BLD-Framing/Rough-in | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/24/2004 at 9:55:04 AM. Contact: ###-####.
|
BLD-Footing | 2/2/2004 | 2/3/2004 | 2/3/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/2/2004 at 3:53:50 PM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 2/2/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/30/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/30/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/30/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/30/2004 | | DONE |
|
|
|
left a message for Brandon -- permit is ready.
|
Plan assigned to (CJW) | 10/13/2003 | | 1/29/2004 | | PASS |
Carl Westfall
|
|
|
1/29/2004 15:40:07 CJW - activity updated through activity BLDA022 from case BLD03-02476.
|
Routing - FIRE | 1/26/2004 | | 1/29/2004 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 1/29/2004 | | 1/29/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/15/2004 | | 1/26/2004 | | |
|
|
|
On hold waiting for response to Fire Department issues.
|
Plan resubmittals received | | | 1/23/2004 | | |
|
|
|
Received two copies of revised sheets A2.1, Site Plan, sheet 6 and one copy of response letter. Routed to Carl W. kmm
|
Routing - FIRE | 1/7/2004 | | 1/15/2004 | | |
Bill Alexander
|
|
|
Failed 2nd IFC plan review. Taken plans and documents to Dave Miller for comments. Reference 2nd review and letter (copy) to Larry Kalousek (CSHQA)
1/13/2004 - Word received from Dave Miller (through Sam Rogers) was to follow and require minimum code.
|
Meeting | | | 1/13/2004 | | DONE |
|
|
|
Sam Rogers & Bill Alexander called for a meeting 1/12/2003 and met with Idaho Food Banks Architect - Larry Kalousek-CSHQA.
Scope of full fire review was reiterated as a condition of occupancy to which an origignal was not produced or made available. Addressed original design and some apparent conflicts which were under questiond. Instructed Larry to basically meet with the Fire Marshal (Dave Miller) personally and plead case for approval or make required changes in a new submittal.
|
Routing - PLAN CHECK | 11/13/2003 | | 1/7/2004 | | PASS |
|
|
|
Drawings approved after the January 6, 2004 resubmittal was reviewed.
|
Plan resubmittals received | | | 1/6/2004 | | DONE |
|
|
|
Received two copies of revised sheets A2.1, M-1.0 and one copy of cover letter. Routed to Carl W. kmm
|
Plan resubmittals received | | | 1/6/2004 | | DONE |
|
|
|
Received two copies of revsied sheets A2.1, SITE PLAN, FLOOR PLAN SHEET 6 and one copy of letter to Bill Alexander. Routed to Carl W. kmm
|
Routing - FIRE | 11/6/2003 | | 11/13/2003 | | |
Bill Alexander
|
|
|
Failed first IFC plan review. Plan A2.1, Egress Problem IFC 1004.2.3. Plans A0.1, A2.1, S2.1 do not address IFC 503, 2303.6.1, 910, 508.5, C105, required for High-Piled Combustible (rack) storage use.
|
Plan Review Completed(1st rev) | | | 11/13/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/14/2003 | | 11/5/2003 | | |
|
|
|
Failed first IBC plan review. IBC plan review started November 3, 2003 and finished November 5, 2003. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
|
Routing - PUBLIC WORKS | 10/13/2003 | | 10/14/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/13/2003 | | PASS |
|
|
|
Lighting compliance needs to be signed along with the cover sheet.
|
Application received | | | 10/10/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/10/2003 | | |
|
|
|
|
Fee Review-notes | 10/10/2003 | 10/10/2003 | | | |
|
|
|
|