BLD-Final | 4/15/2004 | 4/16/2004 | 4/16/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/15/2004 at 6:40:37 PM. Contact: ###-####.
|
DOC - Permit Finaled | 4/16/2004 | 4/16/2004 | 4/16/2004 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 4/16/2004 8:59:02 AM
|
BLD-Final | 4/14/2004 | 4/15/2004 | 4/15/2004 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/14/2004 at 6:31:05 PM. Contact: ###-####.
|
BLD-Final | 4/13/2004 | 4/14/2004 | 4/14/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/13/2004 at 5:18:56 PM. Contact: ###-####. Posted C/N with contractor. 4/14/2004 2:33:33 PM
|
BLD-Energy code compliance | 2/12/2004 | 2/13/2004 | 2/13/2004 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/12/2004 at 6:19:51 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/13/2004 | 2/13/2004 | 2/13/2004 | P | PASS |
Jim Storey
|
|
|
c/n made ok
|
BLD-Framing/Rough-in | 2/10/2004 | 2/11/2004 | 2/11/2004 | P | PART |
Jim Storey
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie stair rise over 7 3/4 from garage to 1st floor. 2/11/2004 4:29:54 PM
|
BLD-Foundation | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PASS |
Jim Storey
|
|
|
Robert; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 12/3/2003 | 12/4/2003 | 12/4/2003 | A | PART |
Russ Owen
|
|
|
Bob, would like late morning if possible. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes WIP. 12/4/2003 12:54:26 PM
|
Case Summary (BLD) | | | 12/3/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/12/2003 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 11/10/2003 | 11/10/2003 | 11/10/2003 | | PASS |
Dan Overy
|
|
|
11/10/2003 08:55:55 DJO - activity updated through activity BLDA022 from case BLD03-02490.
|
Plan assigned to (DJO) | 10/23/2003 | 10/23/2003 | 11/10/2003 | | PASS |
Dan Overy
|
|
|
11/10/2003 08:55:54 DJO - activity updated through activity BLDA022 from case BLD03-02490.
|
Plans ACCEPTED BY PLAN CHECK | | | 11/10/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 11/10/2003 | | DONE |
|
|
|
|
Plan Review Report | | | 11/10/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/10/2003 | | DONE |
|
|
|
|
CHANGE STATUS TO (R) | | | 11/10/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2003 | | DONE |
|
|
|
called walt left a voice message permit ready & fee given 11-10-03 10:14 am ///dld
|
Plans ACCEPTED BY PLAN CHECK | | | 10/23/2003 | | |
|
|
|
|
Plan Reviewer's activity | | | 10/23/2003 | | |
|
|
|
have rejected plans due to incorrect engineering, rescheck, beam sizes, options, and footing re-inforcement
|
Routing - PUBLIC WORKS | 10/15/2003 | | 10/15/2003 | | PASS |
|
|
|
|
Routing - PLANNING | 10/13/2003 | | 10/14/2003 | | PASS |
|
|
|
|
Application received | | | 10/13/2003 | | |
|
|
|
|
Routing - PLAN CHECK | 10/15/2003 | | | | |
|
|
|
|