Agreement of Future work | 1/6/2004 | 1/6/2007 | 6/21/2017 | | DONE |
Scott Arellano
|
|
|
An upgrade agreement has been signed by Dave Miller for the panel replacement, core areas and second floor upgrade. The rest of the space will be upgraded with new TIs. The fire alarm system is a required manual system with sprinkler monitoring, HVAC shutdown, elevator recall/shutdown and notification throughout. (FIR03-00803), recieved email from Scott that this has been completed 7/21/17 ajs
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/20/2004 | 4/26/2005 | | DONE |
|
|
|
|
BLD-Final | 5/20/2004 | 5/20/2004 | 5/20/2004 | P | PASS |
Dave Hannah
|
|
|
Don, ###-#### ok for perm occ 5/20/2004 2:21:46 PM
|
Permanent Occupancy | | 5/20/2004 | 5/20/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/20/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10158 issued 5-20-04 to Title One in the Forest River VIII bldg.
|
BLD-Final | 5/17/2004 | 5/18/2004 | 5/18/2004 | A | FAIL |
Dave Hannah
|
|
|
Don, ###-#### needs grab bars in ada stall and t/p desp 7-9 inches from front of bowl 5/18/2004 8:49:41 AM
|
BLD-Final | 3/25/2004 | 3/26/2004 | 3/26/2004 | P | FAIL |
Dave Hannah
|
|
|
Don, ###-#### needs to finish ada mens restroom and ada signage at stair towers 3/26/2004 3:12:14 PM
|
FIRE-Final Inspection | 3/25/2004 | 3/25/2004 | 3/25/2004 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 2/23/2004 | 2/24/2004 | 2/24/2004 | P | PART |
Dave Hannah
|
|
|
Don, ###-#### ph 3 infill walls ok to cover after elec r/i 2/24/2004 3:23:43 PM
|
BLD-Framing/Rough-in | 2/3/2004 | 2/3/2004 | 2/3/2004 | P | PART |
Dave Hannah
|
|
|
Don, ###-#### ok to cover office in back 2/3/2004 4:15:53 PM
|
FIRE-Sprinkler Rough-in | 1/28/2004 | 1/29/2004 | 1/29/2004 | A | PART |
Rick Jackson
|
|
|
Don, ###-#### Not a sprinkler r/i inspection; This is a phased project - okay to occupy the south half - exits to be maintained 1/29/2004 9:25:20 AM
|
BLD-Conference | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | DONE |
Dave Hannah
|
|
|
phase one ok ok to move staff in to this area 1/28/2004 9:08:08 AM
|
BLD-Final | 1/27/2004 | 1/27/2004 | 1/27/2004 | P | NR |
Dave Hannah
|
|
|
Don, ###-####
|
FIRE-Conference | 12/3/2003 | 12/4/2003 | 12/4/2003 | A | PART |
Rick Jackson
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Met with Don and reviewed fire code notes. The alarm panel monitors trouble and alarm only and will require supervisory signal for the sprinkler monitoring; the panel will require a smoke detector above the panel and will need to monitor duct detectors for AHU shutdown; it is unclear if the alarm system is monitoring the 3 story elevator recall for primary and alternate floor 12/4/2003 8:33:30 AM
|
BLD-Conference | 12/3/2003 | 12/4/2003 | 12/4/2003 | A | PART |
Dave Hannah
|
|
|
###-#### don no mec permit needed super said they will only be moveing defuserers and duct detector can be innstalled under fire alem permit 12/4/2003 10:00:10 AM
|
BLD-Framing/Rough-in | 11/26/2003 | 12/1/2003 | 12/1/2003 | A | PART |
Dave Hannah
|
|
|
Don, ###-#### 12/1/2003 11:18:03 AM west half infill walls ok to cover after elec r/i 12/1/2003 12:59:54 PM
|
Issue PAID IN FULL permit | | | 11/18/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/17/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/17/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/17/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/17/2003 | | DONE |
|
|
|
Spoke with Andrew told him permit is ready & fees
|
Routing - PLAN CHECK | 11/14/2003 | | 11/14/2003 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2003 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 10/15/2003 | | 11/14/2003 | | PASS |
Jason Blais
|
|
|
11/14/2003 15:11:40 JCB - activity updated through activity BLDA022 from case BLD03-02511.
|
Routing - FIRE | 11/10/2003 | | 11/14/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/16/2003 | | 11/10/2003 | | PEND |
|
|
|
When approved by Fire Dept. a permit can be issued. Plans to route to Fire Dept.
|
Telephone call | | | 11/10/2003 | | |
|
|
|
Called architect's representative stating new accessible toilet stall elevations are required. (Fixture mounting heights.)
|
Plan resubmittals received | | | 11/10/2003 | | DONE |
|
|
|
Resubmittal sheet A-3 provided. (3 copies)
|
Plan resubmittals received | | | 11/7/2003 | | DONE |
|
|
|
Transmittal letter with three sets of sheets A-1,A-2,A-3, plans taken to Jason B.
|
Telephone call | | | 10/29/2003 | | |
|
|
|
Called architect rep. to have an issue clarified. He said he would find out and get back to me.
|
Routing - PUBLIC WORKS | 10/15/2003 | | 10/16/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/15/2003 | | DONE |
|
|
|
|
Application received | | | 10/14/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/14/2003 | | |
|
|
|
|
Fee Review-notes | 10/14/2003 | 10/14/2003 | | | |
|
|
|
|