Permit Information
Permit NumberBLD03-02517
StatusFinaled
Name HUTCHISON SMITH ARCHITECTS
Site Address 2450 E BRANIFF ST
Project NameHumphries Family Partnership
Customer Number 
ePlanReviewNo
Description
(RV Storage Facility)(Building B)* To construct a 15,120 sq. ft. one story, Type II-B pre-manufactured metal building for RV storage per approved plans and attachments. Other work includes all site improvements, paving and landscaping. DRH03-00096
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 7/27/20044/26/2005 DONE
Permanent Occupancy 7/1/20047/1/2004 DONE
Details
Permanent occupancy UNPAID FEE  7/1/2004 DONE
Perm. Occ. Cert. # 10214 issued 7-1-04 to Dave Humphries.
BLD-Final6/24/20046/24/20046/24/2004PPASS
DetailsJim Storey
###-#### rick
FIRE-Final Inspection6/21/20046/21/20046/21/2004PPASS
DetailsRick Jackson
BLD-Aging Inspection6/9/20046/9/20046/9/2004 PASS
DetailsJim Storey
wip 6/9/2004 8:28:13 AM
BLD-Foundation3/17/20043/18/20043/18/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/17/2004 at 3:59:54 PM. Contact: ###-####. recieved engineering for grade bust and extention of specific colm. requring epoxy rebar in turn needs special insp of this part of project. 3/18/2004 9:56:02 AM
BLD-Footing3/11/20043/12/20043/12/2004APASS
DetailsJim Storey
re-bar inspection///ryan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
(F) Reprint permit  3/10/2004  
Plan resubmittals received  3/9/2004 DONE
Received three copies of revised sheetA4.0. Routed to Marty Santoyo. kmm
Issue PAID IN FULL permit  3/9/2004 DONE
Case Summary (BLD)  3/8/2004  
PLANS/APPL TAKEN TO FRONT DESK  3/8/2004 DONE
Print Occupancy Form  3/8/2004 DONE
Permit Ready to Issue  3/8/2004 DONE
Telephone call  3/8/2004 DONE
permit ready and fee due
Plan assigned to (MLO)10/15/2003 3/8/2004 PASS
DetailsMike Otto
3/8/2004 10:18:40 MLO - activity updated through activity BLDA022 from case BLD03-02517.
Routing - PLANNING3/1/2004 3/5/2004 PASS
Approved per DRH03-96 and as noted on sheet A4.0.
Plan resubmittals received  3/1/2004 DONE
Received letter of transmittal with three A4.0 sheets. Taken to Mike O.
Routing - PLAN CHECK2/26/2004 2/26/2004 NR
Routing - Erosion and Sediment2/26/2004 2/26/2004 PASS
Routing - PLUMBING2/25/2004 2/25/2004 PASS
Mike O. says the architect says he is deleting all the plumbing from this project so this approval is based on that information i.e. there is no plumbing approved under this permit. Architect would not return a call to plumbing plan reviewer Ron Ginner to verify.
Routing - PLUMBING2/20/2004 2/20/2004 FAIL
Routing - PLAN CHECK2/20/2004 2/20/2004 NR
Routing - PLUMBING2/20/2004 2/20/2004 FAIL
Routing - FIRE2/13/2004 2/19/2004 PASS
Approved per additional resubmittal information received 2/17/04.
Plan resubmittals received  2/17/2004 DONE
Received three copies of fire hydrant clearance (81/2 x 11) and one copy of revised sheet A1.0, signed fire chief plan. Routed to Mike O. kmm
Routing - PLAN CHECK2/4/2004 2/4/2004 PASS
Routing - PLANNING Land Div2/2/2004 2/3/2004 PASS
Parcel created in Ada County prior to 1985. Legal parcel at time of annexation into Boise City.
Routing - PLAN CHECK1/28/2004 2/2/2004 PEND
only one set of metal building plans. 2/2
Plan resubmittals received  1/27/2004 DONE
Received transmittal letter with one set of calculations, design calculations, one set of C1,A1,A2,A3,A4,CS1,CS2,CS3,RF1,RF2,S1,S2,S3,E1,E2 taken to Mike O.
Routing - PUBLIC WORKS1/8/2004 1/20/2004 PASS
Plan resubmittals received  12/23/2003 DONE
Received two copies of revised sheets A1, A5 and A6 with one copy of description of changes. One copy of water flows. Routed to Mike O. kmm
Plan Review Completed(1st rev)  12/2/2003 DONE
Routing - PLAN CHECK12/2/2003 12/2/2003 NR
Routing - FIRE12/2/2003 12/2/2003 FAIL
DetailsBill Alexander
Lack water supply information for hydrant flows. Lack emergency vehicle access verification.
Routing - PLAN CHECK11/10/2003 11/14/2003 FAIL
Plans are incomplete and unacceptable for review. MLO
Routing - PLUMBING11/5/2003 11/7/2003 FAIL
see bld03-02554 for comments
Routing - PLANNING10/30/2003 11/5/2003 FAIL
Landscape plans do not indicate planting notes as required per DRH03-96.
Plan resubmittals received  10/31/2003 DONE
Received two copies of ESC narrative. Routed to Mike O.
Routing - Erosion and Sediment10/29/2003 10/30/2003 FAIL
ESC does not meet conditions of BCC 8-17 or Appendix A&C of Plan Designer Manual
Routing - PUBLIC WORKS10/20/2003 10/29/2003 FAIL
Requires Drainage Plan Geotech report.
Routing - PLANNING Land Div10/17/2003 10/20/2003 FAIL
Prior to issuance of building permit, need proof of legal land division. Called Hutchinson Smith Architects on 10/20/03.
Plans ACCEPTED BY PLAN TECH  10/17/2003 PEND
Waiting for pre-engineered plans and calcs.
Plan routing begun/NEW & ADDTN  10/17/2003 DONE
Plans ACCEPTED BY PLAN TECH  10/15/2003 DONE
Requires permit to be seperated into three permits. Waiting for pre-engineered plans for the RV ports. Contacted David Humphries.
Application received  10/15/2003  
Override - Parcel Holds  10/15/2003  
Recd Pcfee & Taken To Pln CK  10/15/2003 DONE
Override - Parcel Holds  10/15/2003  
Routing - FIRE1/21/2004 1/28/2003 FAIL
Required resubmittal info not provided. Revised review faxed to architect.
Fee Review-notes10/15/200310/15/2003