Letter of compliance | | | 7/27/2004 | | DONE |
|
|
|
Letter of Compliance issued 7-1-04.
|
BLD-Final | 6/24/2004 | 6/24/2004 | 6/24/2004 | P | PASS |
Jim Storey
|
|
|
###-#### rick
|
BLD-Final | 6/22/2004 | 6/23/2004 | 6/23/2004 | P | PART |
Jim Storey
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes pending others. 6/23/2004 1:52:08 PM
|
FIRE-Final Inspection | 6/21/2004 | 6/21/2004 | 6/21/2004 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 5/26/2004 | 5/27/2004 | 5/27/2004 | A | PASS |
Jim Storey
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 4/19/2004 | 4/20/2004 | 4/20/2004 | A | PASS |
Jim Storey
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 4/19/2004 | 4/19/2004 | 4/19/2004 | P | CANC |
Jim Storey
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes rolled over. 4/19/2004 3:59:26 PM
|
BLD-Foundation | 4/1/2004 | 4/2/2004 | 4/2/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/1/2004 at 11:44:20 AM. Contact: ###-####.
|
BLD-Footing | 3/29/2004 | 3/30/2004 | 3/30/2004 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/29/2004 at 3:54:53 PM. Contact: ###-####.
|
(F) Reprint permit | | | 3/10/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/9/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/8/2004 | | 3/8/2004 | | DONE |
|
|
|
process permit
|
Case Summary (BLD) | | | 3/8/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan assigned to (MLO) | 10/17/2003 | | 3/8/2004 | | PASS |
Mike Otto
|
|
|
3/8/2004 10:19:04 MLO - activity updated through activity BLDA022 from case BLD03-02554.
|
Routing - PLANNING | 3/1/2004 | | 3/5/2004 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/20/2004 | | 2/26/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/26/2004 | | 2/26/2004 | | NR |
|
|
|
|
Routing - Erosion and Sediment | 2/26/2004 | | 2/26/2004 | | PASS |
|
|
|
ESC plan ok for site buildings. Ok with attached conditions.
|
Routing - PLUMBING | 2/20/2004 | | 2/20/2004 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 2/20/2004 | | 2/20/2004 | | NR |
|
|
|
|
Routing - FIRE | 2/13/2004 | | 2/19/2004 | | PASS |
|
|
|
Approved per additional resubmittal information received 2/17/04.
|
Routing - PLAN CHECK | 2/4/2004 | | 2/4/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 2/2/2004 | | 2/3/2004 | | PASS |
|
|
|
Approved. Parcel was legal parcel at time of annexation.
|
Routing - PLAN CHECK | 1/28/2004 | | 2/2/2004 | | PEND |
|
|
|
only one set of metal bldg plans 2/2.
|
Routing - FIRE | 1/21/2004 | | 1/28/2004 | | FAIL |
|
|
|
Required resubmittal info not provided. Revised review faxed to architect.
|
Routing - PUBLIC WORKS | 1/8/2004 | | 1/21/2004 | | PASS |
|
|
|
re-route after intial review. resubs for dump station recv'd 11/5/3
|
Plan resubmittals received | | | 12/23/2003 | | DONE |
|
|
|
Received two copies of revised sheets A1, A5 and A6 with one copy of description of changes. Copy of water flows. Routed to Mike O. kmm
|
Plan Review Completed(1st rev) | | | 12/2/2003 | | DONE |
|
|
|
|
Routing - FIRE | 12/2/2003 | | 12/2/2003 | | FAIL |
Bill Alexander
|
|
|
Lack water supply information for hydrant flows. Lack emergency vehicle access verification.
|
Routing - PLAN CHECK | 11/10/2003 | | 11/14/2003 | | FAIL |
|
|
|
Plans incomplete . Architect contacted by phone.
|
Routing - PLUMBING | 11/5/2003 | | 11/7/2003 | | FAIL |
|
|
|
please provide a plan showing plumbing in the office, water line to the r.v. dump will require an r.p. located in a heated area with drainage, slab at r.v. dump must slope to inlet, water must be posted per app.E- parts k and l, provide a c.o. on sewer every 100', sewer under building to r.v. station must be sch 40.
|
Routing - PLANNING | 10/30/2003 | | 11/5/2003 | | FAIL |
|
|
|
Landscape plans do not indicate planting notes as required per DRH03-96.
|
Plan resubmittals received | | | 11/4/2003 | | DONE |
|
|
|
Received transmittal letter with four sheets of A2 taken to Mike Otto.
|
Plan resubmittals received | | | 10/31/2003 | | DONE |
|
|
|
Received two copies of ESC narrative. Routed to Mike O. kmm
|
Routing - Erosion and Sediment | 10/29/2003 | | 10/30/2003 | | FAIL |
|
|
|
ESC does not meet conditions of BCC8-17 or Appendix A&C of Plan Desginer Manual.
|
Routing - PUBLIC WORKS | 10/20/2003 | | 10/29/2003 | | FAIL |
|
|
|
Requires drainage plan geotech report.
|
Routing - PLANNING Land Div | 10/17/2003 | | 10/20/2003 | | FAIL |
|
|
|
Prior to issuance of building permit, need proof of legal land division.
|
Plan routing begun/NEW & ADDTN | | | 10/17/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/17/2003 | | DONE |
|
|
|
Waiting for engineered plans on carport. kmm
|