(INTERMOUNTAIN HOSPITAL)(RESTROOM REMODEL) To remodel the existing restroom within an existing patient room as indicated on the approved plans for full accessibility compliance for all fixture's within the restroom. Main door to patient room to maintain minimum 18" latch side clearance on pull side per code. Work includes selective demolition under separate permit, BLD03-02657, issued 10/28/03. To construct new interior non-bearing walls to create required floor area within the restroom for maneuverability, an accessible water closet, shower stall and sink area. NOTE: This building is fully sprinklered for allowable area increase. A "Letter of Compliance" is required for this project. Approval by the fire department field inspector is required for fire/life safety features that may become affected by this permit scope. PC03-691/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - PLAN CHECK11/5/2003 11/13/2005 PEND
No resubmittals required. Routing to fire code analyst for review.
BLD-Final12/12/200312/15/200312/15/2003APASS
DetailsTom Arcoraci
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok pending fire 12/15/2003 8:46:14 AM
FIRE-Final Inspection12/12/200312/15/200312/15/2003APASS
DetailsTroy Cobbley
mike; Phone #: ###-#### Fire life safety is finaled 12/15/2003 10:35:27 AM
Letter of compliance  12/15/2003 DONE
Letter of Compliance # 24377 issued 12-15-03.
BLD-Framing/Rough-in12/1/200312/2/200312/2/2003PPASS
DetailsTom Arcoraci
mike--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/26/200311/28/200311/28/2003APART
DetailsTom Arcoraci
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore what is holding up masonary in batheroom 11/28/2003 9:49:51 AM
Permit Ready to Issue  11/14/2003 DONE
Inspection Record Card- Bld  11/14/2003 DONE
Telephone call  11/14/2003 DONE
Spoke with Mike from Vista Construction told permit ready & fees
Issue PAID IN FULL permit  11/14/2003 DONE
Routing - FIRE11/13/2003 11/13/2003 DONE
Hand carried plans to fire code analyst Sam Rogers to review the scope of work. I added cooments as part of my review per directions of Sam rogers and will issue the permit based on included comments and requirement that fire code field inspector verify compliance in the field as a condition of this permit. See items 40 & 41 of plan review conditons attached to plans.
Routing - PLAN CHECK11/13/2003 11/13/2003 PASS
Approved as noted on plans and attached conditions / commentf plan review as part of the plan requiring compliance for final approval and issuance of Letter of Compliance by Building Official.
PLANS/APPL TAKEN TO FRONT DESK  11/13/2003 PASS
To permit desk to issue.
Plan assigned to (DRS)10/29/2003 11/13/2003 PASS
DetailsDan Stuart
11/13/2003 15:56:17 DRS - activity updated through activity BLDA022 from case BLD03-02651.
Routing - PLUMBING10/30/2003 11/5/2003 PASS
per plans and 2000 upc
Routing - PUBLIC WORKS10/29/2003 10/30/2003 PASS
Plans ACCEPTED BY PLAN TECH  10/28/2003 DONE
Application received  10/27/2003  
Recd Pcfee & Taken To Pln CK  10/27/2003  
Fee Review-notes10/27/200310/27/2003