Permit Information
Permit NumberBLD03-02673
StatusFinaled
Name BANNOCK MEDICAL OFFICE BUILDING
Site Address 300 E BANNOCK ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(BANNOCK MEDICAL OFFICE BUILDING - CONVERSION OF HOUSE TO OFFICE) This building is NOT fire sprinklered. To convert an existing house to a medical office building (1,387 square foot basement, 1,562 square foot 1st floor, 515 square foot 2nd floor). Work is to include 2 restrooms accessible to the disabled, an exterior ramp accessible to the disabled, interior nonbearing walls, interior bearing walls, millwork, and finishes all per the approved drawings and plan review report on file. A garage on this site was demolished under permit BLD03-02719. CUP03-00070 and DRH03-00177 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/29/2014 DONE
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 3/30/20054/26/2005 DONE
Permanent Occupancy 3/30/20053/30/2005 DONE
Details
BLD-Aging Inspection3/30/20053/30/20053/30/2005 DONE
DetailsTroy James
rory will take permit occ signature to Kathy after lunch 3/30/2005 10:38:57 AM
Permanent occupancy  3/30/2005 DONE
Perm. Occ. Cert. # 10515 issued 3-30-05 to the Center for Lifetime Health.
BLD-Final9/21/20049/21/20049/21/2004PPASS
DetailsDave Hannah
rory; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm occ but second floor cant be occupied as per plans this area will be used only as attic space a permit will issued if owner needs to turn second floor into occupied space 9/21/2004 2:31:49 PM
BLD-Final9/20/20049/20/20049/20/2004PPART
DetailsDave Hannah
roy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles everything ok but for ada counter at front desk and sign on restroom 9/20/2004 3:25:28 PM
BLD-Conference9/16/20049/17/20049/17/2004APASS
DetailsDave Hannah
###-#### - roy - Note: Conference structural
Code Occupancy Approval9/17/20049/17/20049/17/2004PPASS
DetailsWm. Michael Meloy
Compliance met. 9/17/2004 2:26:43 PM
BLD-Final9/15/20049/16/20049/16/2004AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/15/2004 at 4:29:02 PM. Contact: ###-####. c/n on site 9/16/2004 10:26:04 AM
FIRE-Final Inspection9/14/20049/15/20049/15/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/14/2004 at 1:37:30 PM. Contact: ###-####. THey will have the south door hardware for structural inspector 9/15/2004 10:09:19 AM
FIRE-Final Inspection9/9/20049/9/20049/9/2004PFAIL
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore Front door to be keyed both sides; basement doors need hardware per plans 9/9/2004 3:09:20 PM
Plan resubmittals received  9/8/2004 DONE
Received Transmittal Letter, and 1 Set of P1.0 ..... Taken to Gary Z.
FIRE-Conference7/27/20047/28/20047/28/2004AFAIL
DetailsRick Jackson
rory; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Address; handrails; extinguishers; doors not installed (see hardware schedule for all doors) 7/28/2004 9:13:34 AM
BLD-Conference7/27/20047/27/20047/27/2004PDONE
DetailsTroy James
Rory; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Aging Inspection7/12/20047/12/20047/12/2004 CANC
DetailsTroy James
wip 7/13/2004 11:12:25 AM
BLD-Energy code compliance5/12/20045/12/20045/12/2004PPASS
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/10/20045/11/20045/11/2004ACANC
DetailsDave Hannah
John; Phone #: ###-#### please call first for access. thanks.Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in5/11/20045/11/20045/11/2004PPASS
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/11/20045/11/20045/11/2004PDONE
DetailsDave Hannah
John; Phone #: ###-#### please call first for access. thanks.Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in5/10/20045/10/20045/10/2004PPART
DetailsDave Hannah
Please call before inspection///john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs seal package 5/10/2004 3:38:03 PM
Override - Condition Holds1/1/19001/1/19005/10/2004  
framing inspection
Override - Condition Holds1/1/19001/1/19005/10/2004  
BLD-Conference4/8/20044/8/20044/8/2004PDONE
DetailsDave Hannah
john king; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Override - Condition Holds1/1/19001/1/19004/8/2004  
BLD-Footing2/17/20042/18/20042/18/2004APART
DetailsTroy James
eric ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Override - Condition Holds1/1/19001/1/19002/17/2004  
Override - Condition Holds1/1/19001/1/19002/17/2004  
Plan Reviewer's activity  2/17/2004 DONE
Completed the deferred submittal review. The existing bearing wall will be maintained. Note the "red lines" on the approved drawings.
Telephone call  2/17/2004 DONE
Called Matt Rhees (architect) and told him that the deferred submittal drawings were approved and could be picked up at Kathy Miller's desk.
Plan resubmittals received  2/4/2004 DONE
Received transmittal with three sets of sheets A2.1,A2.2,A3.0, taken to Carl W.
BLD-Foundation12/29/200312/29/200312/29/2003PPASS
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Foundation12/23/200312/24/200312/24/2003ACANC
DetailsDave Hannah
###-#### jim
Override - Condition Holds  12/23/2003  
BLD-Footing12/19/200312/22/200312/22/2003APART
DetailsDave Hannah
RORY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Override - Condition Holds  12/19/2003  
Issue PAID IN FULL permit  12/19/2003 DONE
CHANGE ISSUED DATE  12/19/2003 DONE
Inspection Record Card- Bld  12/18/2003 DONE
Print Occupancy Form  12/18/2003 DONE
Permit Ready to Issue  12/18/2003  
Telephone call  12/18/2003 DONE
left mess that permit is ready
Routing - PLAN CHECK12/16/2003 12/17/2003  
Waiting for response to Planning's concerns.
Plan resubmittals received  12/17/2003 DONE
Received two copies of revised sheet A1.1. routed to Carl W. kmm
Routing - PLANNING12/17/2003 12/17/2003 PASS
Approved per DRH03-177 and as noted on sheet A1.1.
Routing - PLAN CHECK12/17/2003 12/17/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/17/2003 DONE
Plan assigned to (CJW)10/29/2003 12/17/2003 PASS
DetailsCarl Westfall
12/17/2003 11:24:14 CJW - activity updated through activity BLDA022 from case BLD03-02673.
Routing - PLAN CHECK12/15/2003 12/16/2003 PASS
Drawings approved after architect's response.
Routing - FIRE12/15/2003 12/15/2003 PASS
Routing - PLANNING12/11/2003 12/15/2003  
Failed 2nd review. The applicant has not submitted the detailed landscape plan to staff that shows the location of all vegetation and the bicycle rack. The water retention area has also moved and needs to be screen through landscape. The architect was notified.
Routing - PLAN CHECK12/8/2003 12/10/2003  
Routing - PLANNING Land Div12/10/2003 12/10/2003 PASS
Parcel was created by recorded deed in 1904.
Plan Review Completed(1st rev)  12/8/2003 DONE
Routing - FIRE12/3/2003 12/8/2003  
Failed 1st review. Need hydrant location and fire flows.
Plan resubmittals received  12/4/2003 DONE
Received transmittal letter with plan review response.
Routing - PUBLIC WORKS11/25/2003 12/3/2003 PASS
Routing - PLAN CHECK11/12/2003 11/25/2003  
Failed 1st IBC review. IBC plan review started November 21, 2003 and was finished November 25, 2003. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
Plan resubmittals received  11/17/2003 DONE
Received three copies of revised stie plan, C1.0, C2.0, A1.1, storm water calculations and O&M manuals. C2.0 sheet not signed. Routed to Carl W. kmm
Routing - PLANNING11/5/2003 11/12/2003  
Failed 1st review. Mark Pecchenino Reviewed on 11/10/2003 Approved per CUP03-00070. Sarah Schafer DRH03-00177 DR conditions not complied with. Need a detailed landscape plan.
Routing - Erosion and Sediment11/4/2003 11/5/2003 PASS
According to a note written by "Rory" (###-####), the ESC permit was paid under the demo phase. ESC approved with conditions attached to plans. ESC fee is to be charged for this project.
Routing - PUBLIC WORKS10/30/2003 11/4/2003  
Failed 1st review. Requires Drainage Plan per Brian M. kmm
Routing - PLANNING Land Div10/29/2003 10/29/2003  
Failed 1st review. Parcel contains portion of platted lot. Called Doug Tamura on 10/29/03 to get deed to see when parcel was created.
Plans ACCEPTED BY PLAN TECH  10/29/2003 PEND
May require grading and drainage which was not submitted at this time. Contacted Matt Rhees of this need. ESC plan is not signed and does not have con # of plan designer. RP is out to bid. kmm
Application received  10/28/2003  
Recd Pcfee & Taken To Pln CK  10/28/2003 DONE
Fee Review-notes10/28/200310/28/2003   
Routing - PLAN CHECK12/17/2003