Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD03-02718
StatusFinaled
Name K-2 CONSTRUCTION INC
Site Address 720 N ALLUMBAUGH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4,346 sq. ft. one story metal building addition to an existing building for interior loading dock and vehicle parking garage. Other work includes all site improvements, paving and landscaping per approved plans and attachments, DRH 03-00160.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 7/21/20044/26/2005 DONE
Permanent Occupancy 7/21/20047/21/2004 DONE
Details
FIRE-Final Inspection7/20/20047/21/20047/21/2004APASS
DetailsTroy Cobbley
Life safety finaled 7/21/2004 8:21:08 AM
Permanent occupancy  7/21/2004 DONE
Perm. Occ. Cert. # 10235 issued 7-21-04 to Oro Wheat.
BLD-Final7/19/20047/20/20047/20/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/19/2004 at 11:17:04 AM. Contact: ###-####. ok for perm when fire signs 7/20/2004 2:55:08 PM
FIRE-Final Inspection7/19/20047/20/20047/20/2004AFAIL
DetailsTroy Cobbley
Provide one more fire extinguisher at the west end of the building and provide building address on exterior 7/20/2004 10:43:39 AM
Code Occupancy Approval7/22/20047/20/20047/20/2004APASS
DetailsScott M.Brown
LANDSCAPE IN AS REQUIRED FINAL SIGNED OFF. 7/22/2004 9:38:03 AM
PubWorks Occupancy Approval7/20/20047/20/20047/20/2004 DONE
Drainage project complete, signed permanent occupancy 7/20/04. G.Fitts
BLD-Aging Inspection7/7/20047/7/20047/7/2004 PASS
DetailsTom Arcoraci
wip 7/7/2004 9:32:40 AM
BLD-Foundation3/18/20043/19/20043/19/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/18/2004 at 3:01:48 PM. Contact: ###-####.
BLD-Footing3/17/20043/17/20043/17/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/17/2004 at 10:48:34 AM. Contact: ###-####.
BLD-Foundation3/12/20043/12/20043/12/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/12/2004 at 9:55:15 AM. Contact: ###-####.
BLD-Footing3/12/20043/12/20043/12/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/12/2004 at 9:55:51 AM. Contact: ###-####.
BLD-Footing3/8/20043/8/20043/8/2004PPASS
DetailsTom Arcoraci
JULIO; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Issue PAID IN FULL permit  2/20/2004 DONE
Plan resubmittals received  2/19/2004 DONE
Rreceived fire flow information. Routed to Mike O. kmm
Routing - FIRE2/19/2004 2/19/2004 PASS
water info resubmitted today, is acceptable.
PLANS/APPL TAKEN TO FRONT DESK  2/19/2004 DONE
Print Occupancy Form  2/19/2004 DONE
Inspection Record Card- Bld  2/19/2004 DONE
Permit Ready to Issue  2/19/2004 DONE
Telephone call  2/19/2004 DONE
spoke with Rocky -- permit is ready.
Plan assigned to (MLO)11/4/2003 2/19/2004 PASS
DetailsMike Otto
2/19/2004 13:20:19 MLO - activity updated through activity BLDA022 from case BLD03-02718.
Routing - PUBLIC WORKS2/17/2004 2/18/2004 PASS
Case Summary (BLD)  2/18/2004  
Routing - FIRE2/18/2004 2/18/2004 FAIL
Required hydrant flow info still not received; Called architect, left message with Gary to fax info to us.
Routing - PUBLIC WORKS2/6/2004 2/13/2004 FAIL
Requires Drainage plan, Brian left message with Dave Marks
Routing - PLAN CHECK2/13/2004 2/13/2004 NR
Routing - Erosion and Sediment2/4/2004 2/6/2004 PASS
ESC approved with conditons attached to plans.
Routing - PLAN CHECK2/6/2004 2/6/2004 NR
Plan resubmittals received  2/4/2004 DONE
Received two copies of revised ESC-1 and Amendment to the Orowheat ESC control plan dated 11/7/03. Routed to Mike O. kmm
Routing - PLAN CHECK12/26/2003 12/26/2003 NR
Routing - FIRE12/19/2003 12/25/2003 FAIL
Water flow information was not attached.
Plan resubmittals received  12/19/2003 DONE
Received two copies of revised cover sheet, A1,0, A1.1, A7.1, A7.2, and three copies of new mechanical sheets M0.0, M1.0 and response letter. Routed to Mike O. kmm
Routing - PLAN CHECK12/19/2003 12/19/2003 PASS
Routing - Erosion and Sediment12/2/2003 12/5/2003 FAIL
No Plan or Waiver letter. Applicant notified by Steve Webb.
Routing - PLAN CHECK12/5/2003 12/5/2003 NR
Plan Review Completed(1st rev)  12/2/2003 DONE
Routing - PLAN CHECK12/2/2003 12/2/2003 NR
Routing - FIRE12/1/2003 12/2/2003 FAIL
Need hydrant locations and fire flows available for this (unprotected) enlarged facility. Need discernable fire department vehicular access plan.
Routing - PLAN CHECK11/24/2003 12/1/2003 FAIL
corrections sent to architect
Plan resubmittals requested  12/1/2003 DONE
IBC corrections
Routing - PLANNING11/20/2003 11/21/2003 PASS
Approved per DRH03-160.
Plan resubmittals received  11/21/2003 DONE
Received three copies of ESC and narrative. Routed to Mike Otto. kmm
Routing - Erosion and Sediment11/6/2003 11/20/2003 FAIL
No esc plan or waiver letter. Notifiey permit applicant.
Routing - PUBLIC WORKS11/4/2003 11/6/2003 FAIL
No Geotech work done.
Plans ACCEPTED BY PLAN TECH  11/4/2003 PASS
Needs ESC plan and Narrative
Routing - PLANNING Land Div11/4/2003 11/4/2003 PASS
Approved by ROS 0794.
Application received  11/3/2003  
Recd Pcfee & Taken To Pln CK  11/3/2003 DONE
Fee Review-notes11/3/200311/3/2003