Case Summary (BLD) | | | 1/27/2009 | | |
|
|
|
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/26/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/26/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10334 issued 10/26/04 to Ten (restaurant).
|
Permanent Occupancy | | 9/24/2004 | 9/24/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
BLD-Final | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PART |
Dave Hannah
|
|
|
ok for temp occ but needs plumbing to go prem is ok for prem after that 9/27/2004 9:30:59 AM
|
Temporary occupancy | | | 9/24/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5148 issued 9-24-04 to Ten.
|
FIRE-Final Inspection | 9/16/2004 | 9/17/2004 | 9/17/2004 | A | FAIL |
Rick Jackson
|
|
|
###-#### rob Extinguishing system requires certification 9/17/2004 9:48:53 AM
|
Override - Parcel Holds | | | 9/16/2004 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/10/2004 | | DONE |
|
|
|
PLAN MOD PERMIT PREVIOUSLY ISSUED
|
(F) Reprint permit | | | 9/10/2004 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/2/2004 | 9/2/2004 | 9/9/2004 | | PASS |
|
|
|
9/9/2004 08:48:49 CJW - activity updated through activity BLDA022 from case BLD03-02721.
|
Routing - PLAN CHECK | 8/30/2004 | | 9/9/2004 | | DONE |
|
|
|
Plan modification completed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/9/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/9/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/9/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/9/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 9/9/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/9/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan Modification Accepted | | | 9/2/2004 | | DONE |
|
|
|
Plan modification excepted for bld03-02721 for the redesign of PI PIZZERIA on sheets A0.01,A2.01,A2.00,A4.11 Taken to Carl Westfall..
|
BLD-Final | 8/19/2004 | 8/24/2004 | 8/24/2004 | A | CANC |
Dave Hannah
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Conference | 8/23/2004 | 8/24/2004 | 8/24/2004 | A | DONE |
Dave Hannah
|
|
|
###-#### rob will submit new plans as plan mod 8/24/2004 10:24:13 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
nolonger open 8/2/2004 11:38:30 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 5/14/2004 | 5/17/2004 | 5/17/2004 | A | FAIL |
Rick Jackson
|
|
|
Craig; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need approved plans; fire sprinkler protection required under stage; hood extinguishing system overdue inspection; remove curtain over rear exit 5/17/2004 9:21:13 AM
|
BLD-Final | 5/14/2004 | 5/17/2004 | 5/17/2004 | A | FAIL |
Dave Hannah
|
|
|
Craig; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs fire life saftey and city approved plans on site 5/17/2004 11:14:43 AM
|
BLD-Aging Inspection | 5/6/2004 | 5/6/2004 | 5/6/2004 | | DONE |
Dave Hannah
|
|
|
talk to manager he will schedule inspections 5/12/2004 7:25:41 AM
|
Issue PAID IN FULL permit | | | 1/27/2004 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/6/2003 | | 1/21/2004 | | PASS |
Carl Westfall
|
|
|
1/21/2004 10:56:22 CJW - activity updated through activity BLDA022 from case BLD03-02721.
|
Routing - PLAN CHECK | 12/2/2003 | | 1/21/2004 | | PASS |
|
|
|
Drawings approved, with clarifications, after the resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/2004 | | DONE |
|
|
|
|
CHANGE STATUS TO (R) | | | 1/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/21/2004 | | DONE |
|
|
|
CALLED LEFT MESSAGE WITH STACY PERMIT READY & FEE GIVEN 1-21-04 1:38 ///DLD ALSO CRAEG BURDEN
|
Override - Parcel Holds | | | 1/21/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/21/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/21/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/15/2004 | | DONE |
|
|
|
Received one copy of coment response letter.
One copy of code alternate approval letter.
One copy of structural review letter.
Two copies of sheet a2.11 & a4.11.
Routed to Carl Westfall.
|
Plan resubmittals received | | | 12/31/2003 | | DONE |
|
|
|
Letter addressed to Tim was taken to Jenifer G.
|
Plan resubmittals received | | | 12/31/2003 | | DONE |
|
|
|
Received two copies of reviesed sheets a2.01, a2.11, a4.11. One3 copy of letter of explanation responding to Plan review comments and one copy of letter to Tim Hogland. Routed to Carl W. kmm
|
Plan resubmittals received | | | 12/3/2003 | | DONE |
|
|
|
Recevied one copy of small docs. from Synergy. Routed to Carl W. kmm
|
Routing - FIRE | 12/1/2003 | | 12/2/2003 | | DONE |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/2/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/10/2003 | | 12/1/2003 | | |
|
|
|
Failed first IBC plan review. The IBC plan review was started November 26, 2003 and was finished December 1, 2003. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
|
Routing - PLUMBING | 11/7/2003 | | 11/10/2003 | | PASS |
|
|
|
misc fixture relocations, cdhd wants a hand sink indirected into existing waste at wash area.
|
Routing - PUBLIC WORKS | 11/6/2003 | | 11/7/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/5/2003 | | DONE |
|
|
|
Per Carl W.
|
Application received | | | 11/4/2003 | | |
|
|
|
|