To construct a 1717 sq. ft. two story duplex per approved plans and attached condition lists. "UNIT A"- 1061 sq. ft. two story with a 454 sq. ft. attached two car garage, a 40 sq. ft. covered entry way and a 80 sq. ft. concrete patio. (1st floor 491 sq. ft.)(2nd floor 570 sq. ft.) "UNIT B"- 656 sq. ft. above a 341 sq. ft. attached one car garage. The permit holder is responsible to comply with wall bracing requirements as adopted by Boise City and approved plans. This structure is being built to meet duplex standards only and cannot be sold as individual units. PC #776 DRH #03-219 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/30/20043/30/20043/30/2004APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/30/2004 at 7:30:08 AM. Contact: ###-####.
DOC - Permit Finaled3/30/20043/30/20043/30/2004APASS
DetailsDave Hannah
Finaled by inspector at 3/30/2004 9:25:33 AM
BLD-Final3/29/20043/29/20043/29/2004PFAIL
DetailsDave Hannah
kirt; Phone #: ###-#### Internet Inspection Request from: Darla Downs needs to fire cualk plumbing in garge of aprt 2907 3/29/2004 3:40:09 PM
BLD-Energy code compliance2/19/20042/19/20042/19/2004PPASS
DetailsDave Hannah
curt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in2/18/20042/18/20042/18/2004APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 2/18/2004 at 7:21:03 AM. Contact: ###-####.
BLD-Conference2/5/20042/5/20042/5/2004PPART
DetailsDave Hannah
curt; Phone #: ###-#### Internet Inspection Request from: Annette Moore one hr wall truss ok but still needs to fur out and rock attic side 2/6/2004 8:52:14 AM
BLD-Framing/Rough-in2/2/20042/2/20042/2/2004PPART
DetailsDave Hannah
curt fire wall inspect; Phone #: ###-#### Internet Inspection Request from: Annette Moore second floor inter wall 2/2/2004 1:52:11 PM
BLD-Foundation1/15/20041/16/20041/16/2004PPASS
DetailsDave Hannah
mike ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing1/14/20041/15/20041/15/2004PPASS
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  1/8/2004 DONE
Inspection Record Card- Bld  1/2/2004 DONE
Permit Ready to Issue  1/2/2004 DONE
Telephone call  1/2/2004 DONE
left mess that permit is ready
Plan assigned to (DJO)12/23/200312/23/200312/29/2003 PASS
DetailsDan Overy
12/29/2003 15:19:07 DJO - activity updated through activity BLDA022 from case BLD03-02767.
Plan Reviewer's activity  12/29/2003 DONE
spoke with Darren Miles (Gowanwood) and have marked plans. ok to pemit.
PLANS/APPL TAKEN TO FRONT DESK  12/29/2003  
Case Summary (BLD)  12/29/2003  
Plan Review Report  12/29/2003  
Plan Reviewer's activity  12/23/2003  
need additional information before issuing permit. gowenwood people are out of town until next week. will resolve when they return.
Pending Assignment by DJO11/12/2003 12/23/2003 DONE
DetailsDan Overy
12/23/2003 14:31:03 DJO - activity updated through activity BLDA169 from case BLD03-02767.
Plans ACCEPTED BY PLAN CHECK  12/23/2003 PEND
Routing - PUBLIC WORKS12/22/2003 12/22/2003 PASS
Routing - PLANNING12/22/2003 12/22/2003 PASS
Approved per DRH03-219 and as noted on sheet S-1.0 for landscape requirements. Parking on site requirements are reduced per Section 11-4-4.3, allows for one parking space on street.
Routing - PLANNING12/15/2003 12/15/2003 PEND
Awaiting lapse of appeal period on 12/22/03. Plans are in my office for sign off.
Routing - PLANNING12/10/2003 12/10/2003 FAIL
DR: S. Schafer--need landscape plan.
Routing - PLANNING Land Div11/13/2003 11/13/2003 PASS
Approved by ROS 6155.
Routing - PLANNING11/13/2003 11/13/2003 FAIL
Spoke w/ Dave: Does require design review approval for R-3D zoning.
Application received  11/12/2003  
Routing - PLANNING Land Div11/12/2003 11/12/2003 FAIL
Need to provide recorded Notice of Buildable Parcel. ROS03-00007. Called Dave Hale on November 12, 2003.
Routing - PLAN CHECK12/22/2003