BLD-Final | 8/3/2004 | 8/4/2004 | 8/4/2004 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/3/2004 at 4:57:08 PM. Contact: ###-####.
|
BLD-Grading Inspection | 8/4/2004 | 8/4/2004 | 8/4/2004 | | PASS |
|
|
|
Final grading and drainage approved.
|
DOC - Permit Finaled | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 8/4/2004 2:21:30 PM
|
BLD-Final | 8/2/2004 | 8/3/2004 | 8/3/2004 | P | NR |
Tony Young
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore
need to finish,, gave some paperwork for bank purposes only,,, no occupancy allowed 8/3/2004 4:26:31 PM
|
BLD-Energy code compliance | 4/7/2004 | 4/8/2004 | 4/8/2004 | A | PASS |
Tony Young
|
|
|
Doug, phone#;###-####
|
BLD-Framing/Rough-in | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/6/2004 at 5:38:24 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/7/2004 | 4/7/2004 | 4/7/2004 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 4/5/2004 | 4/6/2004 | 4/6/2004 | A | FAIL |
Tony Young
|
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n on frame, some insulation is out 4/6/2004 1:46:55 PM
|
BLD-Framing/Rough-in | 4/5/2004 | 4/6/2004 | 4/6/2004 | A | FAIL |
Tony Young
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n posted,,, no cover 4/6/2004 1:47:24 PM
|
BLD-Final | 3/31/2004 | 4/1/2004 | 4/1/2004 | P | NR |
Tony Young
|
|
|
Doug; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 4/1/2004 | 4/1/2004 | 4/1/2004 | P | FAIL |
Tony Young
|
|
|
c/n posted,, still need some paperwork ,,,, but ok to insulate 4/1/2004 1:56:07 PM
|
BLD-Framing/Rough-in | 3/30/2004 | 3/31/2004 | 3/31/2004 | A | CANC |
Tony Young
|
|
|
Doug, phone# ###-####
|
BLD-Conference | 3/31/2004 | 3/31/2004 | 3/31/2004 | P | FAIL |
Tony Young
|
|
|
Doug, phone ###-####, paperwork,, call 1st
c/n posted, on frame,, dont, insulate yet
went over paper work from engineer,,, need more to modify what is built 3/31/2004 4:53:34 PM
|
BLD-Conference | 3/29/2004 | 3/30/2004 | 3/30/2004 | A | PART |
Tony Young
|
|
|
meet builder and owner on job
on shear nailing issues 3/30/2004 2:21:51 PM
|
BLD-Framing/Rough-in | 3/26/2004 | 3/29/2004 | 3/29/2004 | A | FAIL |
Tony Young
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
no inspection made,,, just conf. w/ owner,,, need to see letter from engineer that is to be on job , but not,,, also new c/n posted requesting anothwer letter from engineer for ok as built, due to now having plans on site,,, there is changes with size changes and placement of added windows in braced wall lines 3/29/2004 4:29:29 PM
|
Case Summary (BLD) | | | 3/25/2004 | | |
|
|
|
|
BLD-Conference | 3/21/2004 | 3/22/2004 | 3/22/2004 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/21/2004 at 2:17:04 PM. Contact: ###-####.
need proper plans, etc.,, met w/ Justin/builder,,, Doug/ owner,,, framer
need shear/brace requirments 3/22/2004 11:06:29 AM
|
BLD-Framing/Rough-in | 3/18/2004 | 3/19/2004 | 3/19/2004 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/18/2004 at 5:04:05 PM. Contact: ###-####.
no inspection made,,, need plans, etc./// c/n posted 3/19/2004 5:11:17 PM
|
(F) Reprint permit | | | 2/17/2004 | | DONE |
|
|
|
|
BLD-Foundation | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | PASS |
Dave Hannah
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Foundation | 12/10/2003 | 12/15/2003 | 12/15/2003 | P | NR |
Tony Young
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Grading Inspection | 12/12/2003 | 12/12/2003 | 12/12/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 12/10/2003 | 12/11/2003 | 12/11/2003 | A | FAIL |
Troy James
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downs
need letter from engineer for soil 12/11/2003 11:42:36 AM
|
BLD-Footing | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PART |
Troy James
|
|
|
revieved phone call from soil engineer stating the soil is okay for footing. He will fax letter to City(Terry Records)
|
Issue PAID IN FULL permit | | | 12/10/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/4/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/4/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/4/2003 | | DONE |
|
|
|
left message for Justin --- permit is ready.
|
Plan assigned to (DJO) | 12/3/2003 | 12/3/2003 | 12/3/2003 | | PASS |
Dan Overy
|
|
|
|
Plan Review Report | | | 12/3/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/3/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2003 | | DONE |
|
|
|
|
Pending Assignment by DJO | 11/21/2003 | | 12/3/2003 | | DONE |
Dan Overy
|
|
|
12/3/2003 10:19:28 DJO - activity updated through activity BLDA169 from case BLD03-02838.
|
Routing - PLAN CHECK | 12/1/2003 | | 12/3/2003 | | PASS |
|
|
|
|
Routing - FIRE | 11/28/2003 | | 12/1/2003 | | PASS |
|
|
|
Appears to meet IFC Chapter 5 access requirements.
|
Plan Review Completed(1st rev) | | | 12/1/2003 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/26/2003 | | 11/26/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING | 11/25/2003 | | 11/26/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/25/2003 | | 11/25/2003 | | PASS |
|
|
|
NORTHWEST
|
Routing - PUBLIC WORKS GRADING | 11/25/2003 | | 11/25/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS GRADING | 11/21/2003 | | 11/24/2003 | | FAIL |
Rita DeYoung
|
|
|
Grading plan and architectural site plan vary greatly on location of house. Notified contractor on 11/24/03 early AM.
|
Application received | | | 11/21/2003 | | |
|
|
|
|