Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/6/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/6/2004 | 5/6/2004 | | DONE |
|
|
|
|
BLD-Final | 5/6/2004 | 5/6/2004 | 5/6/2004 | P | PASS |
Tom Arcoraci
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm 5/6/2004 2:54:55 PM
|
Permanent occupancy UNPAID FEE | | | 5/6/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10122 issued 5-6-04 to the American Institute of Health Technology
|
Temporary occupancy | | | 5/3/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5108 issued 5-3-04 to the American Institute of Health Technology.
|
Code Occupancy Approval | | | 5/3/2004 | | PASS |
|
|
|
SIGNED OFF FINAL. THE BARE GROUND IN FRONT WAS PART OF ACHD REQUIRED CURB AND THEY BONDED WITH THEM.
|
BLD-Final | 4/28/2004 | 4/30/2004 | 4/30/2004 | P | PART |
Tom Arcoraci
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok for temp occ needs letter from spec insp and eng 4/30/2004 2:25:07 PM
|
FIRE-Final Inspection | 4/28/2004 | 4/29/2004 | 4/29/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide insulation in the eve over the exterior canopy, repair the exit signs on second floor and in the computer lab 4/29/2004 9:00:22 AM
|
FIRE-Final Inspection | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 4/29/2004 3:40:18 PM
|
FIRE-Final Inspection | 4/27/2004 | 4/28/2004 | 4/28/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide approved drawings for the fire sprinkler final. Remove thumbturns from the class room doors (total of 3), Repair exit signs neare womens restroom, computer lab and the two on the second floor, Repair exit sign outside of the kitchen, provide emergency light in main corridor, basement, basement stairs and outside of the kitchen, Repair the emergency light at the womens restroom, Repair emergency light/exit sign in classroom 141. 4/28/2004 11:45:45 AM
|
Plan resubmittals received | | | 4/23/2004 | | |
|
|
|
|
BLD-Framing/Rough-in | 4/13/2004 | 4/13/2004 | 4/13/2004 | P | PART |
Russ Owen
|
|
|
grid ceiling inspection please////ED; Phone #: ###-#### Internet Inspection Request from: Barbara Moore All ok except putting in perimeter wires in class room 115 , 116, north end west side 1 room "east wall side" only. will verify at next inspection. 4/12/2004 11:35:15 PM 4/12/2004 11:36:06 PM
|
BLD-Framing/Rough-in | 3/3/2004 | 3/4/2004 | 3/4/2004 | A | PART |
Russ Owen
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok some interior walls as marked on plans. with mezz for furnaces. 3/3/2004 7:08:55 PM
|
BLD-Framing/Rough-in | 2/23/2004 | 2/24/2004 | 2/24/2004 | A | PART |
Jim Sly
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK to rock New, large glue lam beam. Beam runs N/S and located at West end of Bldg. Verified attachments to existing Purlins and beam Per Eng. 2/24/2004 11:29:03 AM
|
BLD-Concrete | 2/11/2004 | 2/11/2004 | 2/11/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/11/2004 at 8:44:18 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/9/2004 | 2/10/2004 | 2/10/2004 | A | PART |
Tom Arcoraci
|
|
|
wall insp- in the cafateria-- ed- ###-#### cafe ok for cover 2/10/2004 9:57:56 AM
|
Plan assigned to (MLO) | 1/23/2004 | | 2/6/2004 | | PASS |
Mike Otto
|
|
|
2/6/2004 09:57:16 MLO - activity updated through activity BLDA022 from case BLD03-02844.
|
Routing - PLAN CHECK | 2/6/2004 | | 2/6/2004 | | NR |
|
|
|
processed permit MLO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/6/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/6/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/6/2004 | | DONE |
|
|
|
spoke with Jeff -- permit is ready.
|
Issue PAID IN FULL permit | | | 2/6/2004 | | DONE |
|
|
|
|
Routing - FIRE | 1/30/2004 | | 2/4/2004 | | PASS |
|
|
|
Resubmital approved subject to field verification of additional extinguishers to be provided as specified in plan annotation and attached review comments.
|
Routing - Erosion and Sediment | 1/29/2004 | | 1/30/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans. Prior to the start of construction an individual certified by Boise City as Resposible Person must be designated for this project. Boise City shall be notified who the RP is or a Site Stop Work Order will be issued.
|
Routing - PLAN CHECK | 1/26/2004 | | 1/28/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/26/2004 | | DONE |
|
|
|
Received three copies of revised sheets G-1, Sd-1.1, A-1.1, A-8.1 one copy of explanation memo and two copies of erosion and sediment control plan and narrative. Routed to Mike O
|
Plan assigned to (MLO) | 11/25/2003 | | 1/22/2004 | | PASS |
Mike Otto
|
|
|
1/22/2004 09:36:30 MLO - activity updated through activity BLDA022 from case BLD04-00107.
|
Plan resubmittals received | | | 1/20/2004 | | DONE |
|
|
|
Received three copies of revised sheets S1.3, D1.1, D1.2 and one copy of cover letter. Routed to Mike Otto. kmm
|
Routing - PLAN CHECK | 1/15/2004 | | 1/16/2004 | | FAIL |
|
|
|
had meeting with architect went over corrections.
|
Plan resubmittals received | | | 1/15/2004 | | DONE |
|
|
|
Received one copy of plan review response memo, one coy of stamped structural claculations, one copy of ESC plan w/ attached documentation, one copy of access flooring shop drawings 81/2 x 11, thre copies of revised hardware spec section and three copies of revised sheets G-1, S-1.2, A-1.3, S-2.1, D-1.1, A-1.1, A-1.4, A-6.1, A-7.1, A-8.1, A-9.3. Routed to Mike O. kmm
|
Routing - PLAN CHECK | 12/19/2003 | | 12/30/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 12/30/2003 | | DONE |
|
|
|
IBC corrections
|
Plan resubmittals received | | | 12/19/2003 | | DONE |
|
|
|
3 copies of Sheets G-1,S-1.2, S-2.1, A-1.1, A-1.2, A-7.1, A-9.3, E2.1L along with memo from Jeff Likes responding to plan review, supplemental structural calculations, fire flow memo from United Water, and 1 copy of project manual with addendums 1, 2 and 3 received and forwarded to Mike Otto.
|
Routing - PLAN CHECK | 12/18/2003 | | 12/18/2003 | | NR |
|
|
|
|
Routing - FIRE | 12/12/2003 | | 12/17/2003 | | FAIL |
|
|
|
Review comments faxed to architect.
|
Routing Off Site -Energy | 11/25/2003 | | 12/15/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 12/12/2003 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 12/1/2003 | | 12/12/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 12/1/2003 | | 12/1/2003 | | PASS |
|
|
|
water line sheet p-1.2 goes from inch and half to inch and a quarter and back to inch and a half, should stay the same size
|
Routing - PLANNING | 11/28/2003 | | 12/1/2003 | | PASS |
|
|
|
Mark Pecchenino Approved per CUP99-00081 (MOD#1)
|
Routing - Erosion and Sediment | 11/26/2003 | | 11/28/2003 | | FAIL |
|
|
|
ESC waiver not approved due to extensive remodel and large amout of construction debris. Contacted plan designer.
|
Routing - PUBLIC WORKS | 11/25/2003 | | 11/26/2003 | | PASS |
|
|
|
|
Application received | | | 11/21/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/21/2003 | | |
|
|
|
|
Routing - FIRE | 12/30/2003 | | 1/7/2003 | | FAIL |
|
|
|
resubmittal not complete per original review comments.
|
Fee Review-notes | 11/21/2003 | 11/21/2003 | | | |
|
|
|
|