BLD-Final | 4/15/2004 | 4/16/2004 | 4/16/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/15/2004 at 10:57:35 AM. Contact: ###-####. C/C issued. 4/16/2004 11:35:00 AM
|
DOC - Permit Finaled | 4/16/2004 | 4/16/2004 | 4/16/2004 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 4/16/2004 11:35:08 AM
|
BLD-Energy code compliance | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/3/2004 at 2:58:27 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/30/2004 | 1/30/2004 | 1/30/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/30/2004 at 8:28:56 AM. Contact: ###-####. 1/30/2004 12:56:19 PM
|
BLD-Foundation | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PASS |
Jim Sly
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PART |
Jim Sly
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Issue PAID IN FULL permit | | | 12/5/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/4/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/4/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/4/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Reviewer's activity | | | 12/3/2003 | | DONE |
|
|
|
received engineering and have red-lined other items. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/2/2003 | | |
|
|
|
|
Plan Reviewer's activity | | | 12/2/2003 | | |
|
|
|
Have contacted Matrix Design about engineering for overheight walls, missing headers, incorrect wall sections, no electrical layout and footing sizes at girder concentrated load areas. Not much of a responce. Have left two messages for Joe Amyx. No call backs yet. Will issue when problems are addressed.
|
Case Summary (BLD) | | | 12/2/2003 | | |
|
|
|
|
Plan Review Report | | | 12/2/2003 | | |
|
|
|
|
Routing - PUBLIC WORKS | 11/26/2003 | | 11/28/2003 | | PASS |
|
|
|
|
Routing - PLANNING | 11/25/2003 | | 11/26/2003 | | PASS |
|
|
|
|
Application received | | | 11/25/2003 | | |
|
|
|
|
Pending Assignment by DJO | 11/25/2003 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 11/28/2003 | | | | |
|
|
|
|