PubWorks Occupancy Approval | 9/7/2005 | 9/7/2005 | 9/7/2005 | | DONE |
|
|
|
Building permit expired 9/04. Brian Murphy signed off on the drainage permit 9/7/05.
|
DOC-Permit Expired | 9/1/2004 | 9/1/2004 | 9/1/2004 | | DONE |
Tony Young
|
|
|
Permit expired by limitations.
|
CHANGE STATUS TO (ISS) | | | 6/23/2004 | | DONE |
|
|
|
Per Tony Young please change this back to ISS status///6/23/04 BAM
|
DOC-Permit Expired | 6/22/2004 | 6/22/2004 | 6/22/2004 | | DONE |
Tony Young
|
|
|
Permit expired by limitations.
|
BLD-Aging Inspection | 4/20/2004 | 4/20/2004 | 4/20/2004 | | NR |
Tony Young
|
|
|
|
Case Summary (BLD) | | | 1/13/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/5/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/5/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/5/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/2/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (KMM) | 11/25/2003 | | 12/31/2003 | | PASS |
Kathy Miller
|
|
|
12/31/2003 13:27:45 KMM - activity updated through activity BLDA022 from case BLD03-02856.
|
Routing - PLAN CHECK | 12/26/2003 | | 12/31/2003 | | DONE |
|
|
|
Plans in hold box. kmm
|
Routing - FIRE | 12/31/2003 | | 12/31/2003 | | PASS |
|
|
|
Plans approved per walk-in meeting with Toothman Orton, and agreement by D. Miller, of roadway turning radius/width issue.
|
Print Pending Permit.LaserJet4 | | | 12/31/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2003 | | DONE |
|
|
|
|
Routing - FIRE | 12/23/2003 | | 12/24/2003 | | FAIL |
|
|
|
Put resubs of 12/18/03 with plans before re-routing to fire.kmm Turning radius was not properly revised on sheet 2 of 15. Resubmittal required.slr
|
Routing - Erosion and Sediment | 12/18/2003 | | 12/23/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Plan resubmittals received | | | 12/18/2003 | | DONE |
|
|
|
Received two copies of revised sheet 2 of 15 and one copy of cover letter. Will put with plans when back from ESC and re-route to fire. kmm
|
Routing - PLAN CHECK | 12/16/2003 | | 12/18/2003 | | |
|
|
|
Plans in hold box.
|
Plan resubmittals received | | | 12/18/2003 | | DONE |
|
|
|
Received two copies of revised ESC plan and narrative and one copy of cover letter. Put with plans and re-routed to ESC. kmm
|
Routing - PUBLIC WORKS | 12/16/2003 | | 12/16/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/16/2003 | | 12/16/2003 | | |
|
|
|
Plans in hold box. kmm
|
Routing - FIRE | 12/12/2003 | | 12/15/2003 | | FAIL |
|
|
|
re-route to PW when back from fire. kmm
Inadequate FD vehicle roadways and Fire Hydrant location. Review faxed to Architect. slr
|
Routing - PLUMBING | 12/11/2003 | | 12/11/2003 | | PASS |
|
|
|
sewer is to be northwest sewer dist maintained, water to be united water, dedicated fire services are fire departments.
|
Routing - Erosion and Sediment | 12/10/2003 | | 12/11/2003 | | FAIL |
|
|
|
ESC incomplete. Does not contain BMP drawing detail, does not reference NOI requirements. Contacted PD.
|
Routing - PUBLIC WORKS | 12/5/2003 | | 12/10/2003 | | FAIL |
|
|
|
per Jim Wyllie floodway construction issues.
|
Routing - PLANNING | 11/26/2003 | | 12/5/2003 | | PASS |
|
|
|
Approved for grading only per DRH02-00240 (Marty Santoyo) and CUP02-00141 (Karen Gallagher).
|
Routing - PLANNING Land Div | 11/25/2003 | | 11/26/2003 | | PASS |
|
|
|
Approved for grading only.
|
Application received | | | 11/25/2003 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/25/2003 | | DONE |
|
|
|
|