Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/24/2004 | 4/26/2005 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 9/24/2004 | 9/24/2004 | 9/24/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 9/24/04. D.Erskine
|
BLD-Final | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PASS |
Tom Arcoraci
|
|
|
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled 9/24/2004 10:28:34 AM
|
Permanent occupancy | | | 9/24/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10306 issued 9-24-04 to the Social Security Administration Offices.
|
Permanent Occupancy | | 9/23/2004 | 9/23/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | 9/23/2004 | 9/23/2004 | 9/23/2004 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL SIGNED 9/23/2004 2:58:02 PM
|
FIRE-Final Inspection | 9/10/2004 | 9/10/2004 | 9/10/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide two emergency lights in the open office area as per plans and provide correct door hardware on the main entry/exit 9/10/2004 4:39:28 PM
|
BLD-Framing/Rough-in | 8/16/2004 | 8/16/2004 | 8/16/2004 | P | PART |
Lane Manuel
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Annette Moore
offices 13 thru 16 t-bar ok 8/16/2004 2:30:20 PM
|
BLD-Framing/Rough-in | 8/5/2004 | 8/6/2004 | 8/6/2004 | A | PART |
Lane Manuel
|
|
|
tim ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. t-bar passed. contr. to leave 3 areas exposed for c/n mech, per dixie. 8/6/2004 10:16:36 AM
|
FIRE-Conference | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | DONE |
Troy Cobbley
|
|
|
A duct smoke detector is to be added to RTU8 8/4/2004 4:27:18 PM
|
BLD-Framing/Rough-in | 7/29/2004 | 7/29/2004 | 7/29/2004 | P | PART |
Tom Arcoraci
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wip ok to cover beam 7/29/2004 3:27:59 PM
|
FIRE-Final Inspection | 7/26/2004 | 7/27/2004 | 7/27/2004 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for multiple rooms in the next phase of the project. See city approved plans, sheets A2.2, A2.3 and A2.5 for the specific rooms and deficiencies. There are card readers and door magnets being installed. I contacted Nick with Synergy and Jason with AEI about IFC and IBC requirements for access controlled egress doors. These items are not shown on the approved fire alarm plans. Plans will require possible resubmittals. 7/27/2004 10:27:32 AM
|
BLD-Final | 7/26/2004 | 7/27/2004 | 7/27/2004 | A | NR |
Tom Arcoraci
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 7/22/2004 | 7/22/2004 | 7/22/2004 | P | PART |
Tom Arcoraci
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes gid ok partial 7/22/2004 2:35:42 PM
|
BLD-Framing/Rough-in | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PART |
Tom Arcoraci
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north west side ok for cover needs eng letter for beam hanger change 7/15/2004 12:40:17 PM
|
FIRE-Final Inspection | 7/2/2004 | 7/2/2004 | 7/2/2004 | P | PART |
Troy Cobbley
|
|
|
Phase II ok to occupy. Still need to test the main fire alarm system. 7/2/2004 9:58:40 AM
|
BLD-Conference | 7/2/2004 | 7/2/2004 | 7/2/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/2/2004 at 8:44:16 AM. Contact: ###-####.
|
FIRE-Final Inspection | 7/2/2004 | 7/2/2004 | 7/2/2004 | P | CANC |
Troy Cobbley
|
|
|
duplicate inspection 7/2/2004 9:56:19 AM
|
BLD-Final | 7/2/2004 | 7/2/2004 | 7/2/2004 | P | PASS |
Tom Arcoraci
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ of phase 2 7/2/2004 1:23:15 PM
|
BLD-Conference | 7/1/2004 | 7/1/2004 | 7/1/2004 | A | PASS |
Tom Arcoraci
|
|
|
contractor repairing 1 hr in old building 7/1/2004 9:46:31 AM
|
BLD-Other | 6/28/2004 | 6/28/2004 | 6/28/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/28/2004 at 6:26:33 AM. Contact: ###-####. old building not V-a only all new construction in this area inspected as V-a 6/28/2004 10:28:19 AM 6/28/2004 10:29:03 AM
|
BLD-Framing/Rough-in | 6/24/2004 | 6/25/2004 | 6/25/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/24/2004 at 1:30:21 PM. Contact: ###-####. Roof/ceiling assembly OK above restroom hard lid ceilings....Note Need to add blocks to create double top plate and firecaulk edge of rock on ceiling, - or - rock face of Non bearing interior walls above hard lid. ( Restroom to the North). 6/25/2004 12:31:20 PM 6/25/2004 12:32:58 PM 6/25/2004 12:34:26 PM
|
BLD-Conference | 6/22/2004 | 6/22/2004 | 6/22/2004 | P | DONE |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/22/2004 at 8:35:27 AM. Contact: ###-####.
|
BLD-Final | 6/14/2004 | 6/14/2004 | 6/14/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/14/2004 at 6:04:11 AM. Contact: ###-####. ok first phase 6/14/2004 10:17:41 AM
|
FIRE-Conference | 6/10/2004 | 6/11/2004 | 6/11/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/10/2004 at 6:15:55 PM. Contact: ###-####. Scheduled for first phase this afternoon 6/11/2004 2:36:04 PM
|
FIRE-Final Inspection | 6/11/2004 | 6/11/2004 | 6/11/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/11/2004 at 10:22:38 AM. Contact: ###-####. Phase I okay to occupy 6/11/2004 2:45:57 PM
|
Code Occupancy Approval Temp | 6/8/2004 | 6/8/2004 | 6/7/2004 | A | DONE |
Scott M.Brown
|
|
|
SIGNEDE OFF TEMP CCUPANCY DUE TO UTILITY WORK, THEY CLAIM PARKING LOT AND LAND SCAPE TO BE IN PLACE IN 2-3- WEEKS, DUE TO BEING PHASE WORK I DID NOT REQUIRED BOND BECAUSE WE HAVE OTHER PERMITS/OCCUPANCY TO HOLD. 6/8/2004 9:28:23 AM
|
BLD-Other | 6/5/2004 | 6/7/2004 | 6/7/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/5/2004 at 4:35:18 PM. Contact: ###-####. grid and firestop above ok 6/7/2004 10:15:32 AM
|
FIRE-Conference | 6/4/2004 | 6/4/2004 | 6/4/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/4/2004 at 7:00:34 AM. Contact: ###-####. This is a phased project and the GC wanted to know about occupying the new addition without having the new parking lot completed - the area must have FD vehicle access surface; smoke/fire dampers are installed in new addition and there isn't a plan as to how they are activated - GC will contact architect 6/4/2004 10:57:13 AM
|
BLD-Other | 5/6/2004 | 5/7/2004 | 5/7/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/6/2004 at 8:20:16 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/5/2004 | 5/6/2004 | 5/6/2004 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 4:39:32 PM. Contact: ###-####.
|
BLD-Energy code compliance | 5/5/2004 | 5/6/2004 | 5/6/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 4:40:58 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/6/2004 | 5/6/2004 | 5/6/2004 | A | PART |
Tom Arcoraci
|
|
|
framing ok check fire chalk at walls check ceiling and corr at grid 5/6/2004 8:54:01 AM
|
BLD-Framing/Rough-in | 5/5/2004 | 5/5/2004 | 5/5/2004 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 7:26:31 AM. Contact: ###-####. called contractor can find no approval to insulate walls, and now almost complete with insulatiom, he will recall when insulation is complete and they are out of the building,and 408 will be back for job history check to verify framing , as noted ceiling insulation only by last entry. 5/5/2004 2:53:56 PM
|
BLD-Framing/Rough-in | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/29/2004 at 8:04:36 AM. Contact: ###-####. ok to insulate ceiling 4/29/2004 2:20:46 PM
|
BLD-Framing/Rough-in | 4/28/2004 | 4/28/2004 | 4/28/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/28/2004 at 6:42:11 AM. Contact: ###-####. ext shear ok 4/28/2004 9:42:48 AM
|
BLD-Framing/Rough-in | 4/28/2004 | 4/28/2004 | 4/28/2004 | P | PART |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 3/18/2004 | 3/18/2004 | 3/18/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/18/2004 at 9:19:16 AM. Contact: ###-####. wip 3/18/2004 3:34:05 PM
|
BLD-Footing | 3/16/2004 | 3/16/2004 | 3/16/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/16/2004 at 7:20:51 AM. Contact: ###-####. spec insp on site 3/16/2004 10:27:44 AM 3/16/2004 10:27:57 AM
|
Issue PAID IN FULL permit | | | 3/3/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/27/2004 | | DONE |
|
|
|
left mess that permit is ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2004 | | PASS |
|
|
|
|
Print Occupancy Form | | | 2/9/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/9/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/9/2004 | | DONE |
|
|
|
left a message for Roy Jackson -- permit is ready.
|
Telephone call | | | 2/9/2004 | | DONE |
|
|
|
Spoke with Dan Johnson and told him permit is ready & fees and that we need ACHD information also//2/9/04 10:53am BAM
|
Plan assigned to (JCM) | 12/3/2003 | | 2/9/2004 | | PASS |
John Menard
|
|
|
2/9/2004 09:40:53 JCM - activity updated through activity BLDA022 from case BLD03-02891.
|
Routing - FIRE | 2/4/2004 | | 2/6/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 12/22/2003 | | 2/4/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/22/2004 | | DONE |
|
|
|
Received two copies of revised sheets A2.7, A4.1, A4.2, A4.3, M1.0, M1.2, one copy of response letter. Routed to John M. kmm
|
Plan Reviewer's activity | | | 1/22/2004 | | PASS |
|
|
|
Reviewed and approved resubmittals with attached comment list and red lined notes. JCM
|
Plan resubmittals received | | | 1/14/2004 | | DONE |
|
|
|
Received two copies of revised sheets A0, 1of 1, 1of 3, DWG/2430-ALTA, L1.1, A1.1, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A2.6, A2.7, A3.1, A4.1, A4.2, A4.3, A5.1, A7.1, A8.1, A8.2, A9.1, M1.0, M1.1, M1.2, P1.3. Three copies of response letters. Routed to John M. kmm
|
Telephone call | | | 1/6/2004 | | DONE |
|
|
|
Habitec - Dan Johnson, indicated that reviewer made a mistake on the water flow requirements (V-A, not a V-B). Changed flows from 3,750 to 2,500 gpm required flows.
|
Routing - FIRE | 12/17/2003 | | 12/22/2003 | | FAIL |
Bill Alexander
|
|
|
Requires fire flows, hydrant spacing/locatations, access verification, fire alarm information and IBC-IFC related issues.
|
Plan Review Completed(1st rev) | | | 12/22/2003 | | DONE |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/22/2003 | | FAIL |
|
|
|
Failed Building & Fire
|
Plan resubmittals requested | | | 12/17/2003 | | |
|
|
|
Mailed the achitect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 12/9/2003 | | 12/17/2003 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/3/2003 | | 12/15/2003 | | PASS |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm Received a fax from the consulting structural engineer approving the structural plans. JCM
|
Routing - PLUMBING | 12/8/2003 | | 12/9/2003 | | PASS |
|
|
|
1. sheet P1.1 note 2-if backflow is located in building, need a licensed plumbing contractor not landscape contractor to install. 2. building requires a service backflow device and thermal expansion protection if these are not presently installed.
|
Routing - PLANNING | 12/5/2003 | | 12/8/2003 | | PASS |
|
|
|
Approved per DRH03-166.
|
Routing - Erosion and Sediment | 12/5/2003 | | 12/5/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 12/3/2003 | | 12/5/2003 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/3/2003 | | 12/3/2003 | | PASS |
|
|
|
Approved by ROS 5235.
|
Plans ACCEPTED BY PLAN TECH | | | 12/3/2003 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/3/2003 | | |
|
|
|
|
Application received | | | 12/2/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/2/2003 | | DONE |
|
|
|
|
Fee Review-notes | 12/2/2003 | 12/2/2003 | | | |
|
|
|
|
Routing Off Site -Energy | 12/3/2003 | | | | |
|
|
|
Contacted to Ron O for energy review. kmm
|
Routing - PLAN CHECK | 2/9/2004 | | | | PASS |
|
|
|
|