Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD03-02907
StatusFinaled
Name ST LUKES IDAHO ELKS REHAB
Site Address 201 W BOISE AVE Unit: 105
Project NamePENNSYLVANIA STATION
Customer Number 
ePlanReviewNo
Description
(ST LUKES-IDAHO ELKS REHAB SERVICES)(PENNSYLVANIA STATION-S END) To remodel a 1641 sq ft tenant space by incorporating the adjacent 1404 sq ft tenant sapce and create one 3,044 sq.ft. tenant space for use as a physical therapy tenant per approved plans. Work will include removal of existing demising wall, construction of interior partitions to create two new office areas, and a new break room area, installation of one new accessible restroom. (pc#701-03) Rmh and CUP03-00111.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/1/20044/1/2004 DONE
Permanent occupancy  4/1/2004 DONE
Perm. Occ. Cert. #10065 issued 4-1-04 to St. Luke's Idaho Elks Rehab.
FIRE-Final Inspection3/29/20043/29/20043/29/2004PPASS
DetailsRick Jackson
bill; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Final3/29/20043/29/20043/29/2004PPASS
DetailsJim Storey
bill; Phone #: ###-#### Internet Inspection Request from: Darla Downs final ok card on site. 3/29/2004 3:15:52 PM
BLD-Final3/23/20043/23/20043/23/2004PFAIL
DetailsJim Storey
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore exit hardware/ada sink/valve handles/cabnet height/bathrm base. 3/23/2004 4:30:20 PM
FIRE-Final Inspection3/23/20043/23/20043/23/2004PFAIL
DetailsRick Jackson
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Exit door hardware reviewed with architect, GC and Jim Storey 3/23/2004 4:28:44 PM
Code Occupancy Approval3/15/20043/15/20043/15/2004PPASS
DetailsWm. Michael Meloy
Compliance met. 3/15/2004 3:39:22 PM
BLD-Framing/Rough-in2/17/20042/17/20042/17/2004PFAIL
DetailsJim Storey
bill; Phone #: ###-#### Internet Inspection Request from: Annette Moore 18. Accessible Shower – Transfer- type shower compartments shall be 36 inches wide by 36 inches
deep inside finished dimension, measured at the center point of opposing sides, and shall have a
minimum 36 inches wide entry on the face of the shower compartment. The clearance in front of
the compartment shall be 48 inches long minimum measured from the control wall and 36
inches wide minimum. (Cabo/Ansi A117.1 Sec. 608.2) Please provide the 48 inches
maneuvering clearance required in front of the accessible shower unit. Note that this
dimension is measured from the wall of the shower that has the controls located on it. plm void and needs reinsp after c/n/ need plan dimetioned to show compliance with plan review note 18# 2/17/2004 3:21:37 PM ok to cover all but restaroom area. 2/17/2004 3:29:14 PM
Override - Parcel Holds1/1/19001/1/19002/17/2004  
Override - Parcel Holds  1/20/2004  
Issue & PRINT permit  1/20/2004 DONE
Override - Parcel Holds  1/16/2004  
Inspection Record Card- Bld  1/16/2004 DONE
Print Occupancy Form  1/16/2004 DONE
Override - Parcel Holds  1/16/2004  
Permit Ready to Issue  1/16/2004 DONE
Telephone call  1/16/2004 DONE
left a message with Wes Edwards. permit is ready.
Plan assigned to (R_H)12/4/2003 1/15/2004 PASS
Details
1/15/2004 14:59:05 RMH - activity updated through activity BLDA022 from case BLD03-02907.
Routing - PLAN CHECK1/13/2004 1/15/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/15/2004 DONE
Routing - PLANNING1/12/2004 1/13/2004 PASS
Site plan submitted showing required changes/improvements. Landscaping changes and concrete pad for bike rack added with red lines. Improvements required prior to Certificate of Occupancy.
Routing - PLAN CHECK1/8/2004 1/12/2004  
Plan resubmittals received  1/9/2004 DONE
Received one copy of response letter and two copies of revised sheet A1.1. Routed to Ron Hill. kmm
Routing - PLANNING1/8/2004 1/8/2004 FAIL
CUP03-00111 - Plans do not comply with Conditions of Approval for CUP03-00111 - some need items to be shown on site plan and landscape plan. KG
Routing - FIRE12/30/2003 1/7/2004 PASS
Plan resubmittals received  12/31/2003 DONE
Received a response letter with two sheets of A2.1 taken to Ron H.
Routing - PLAN CHECK12/5/2003 12/30/2003 FAIL
Faxed and mailed requirements to the architect, 12/30/03, Routed plans to the fire department same day.
Routing - PUBLIC WORKS12/4/2003 12/5/2003 PASS
Application received  12/4/2003  
Recd Pcfee & Taken To Pln CK  12/4/2003 DONE
Override - Parcel Holds  12/4/2003  
Override - Parcel Holds  12/4/2003  
Print Pending Permit.LaserJet4  12/4/2003  
Routing - PLANNING12/2/2003 12/2/2003 FAIL
Scott Spjute. CUP03-00111 hearing on January 5, 2003. Okay to route but do not issue until CUP is approved.
Permanent Occupancy 3/29/20033/29/2003 DONE
Details
Fee Review-notes12/4/200312/4/2003