Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD03-02909
StatusFinaled
Name NAPA AUTO PARTS
Site Address 160 N 16TH ST
Project NameNAPA AUTO PARTS-RACKING
Customer Number 
ePlanReviewNo
Description
(NAPA AUTO PARTS-RACKING) To install storage racking all per approved plans and engineering on file.Tenant Improvement under (Bld03-02763). Work will include installation of 12 ft high and 10 foot high pallet racks and shelving racks throughout tenant space as shown on floor plans and anchored to the floor and lateral bracing per engineering. This building is fully fire sprinklered any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (PC#750-03) Rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/27/2005 DONE
First Notice has not been responded to.
First Notice Sent 11/15/20044/26/2005 DONE
DOC - Permit Finaled11/15/200411/15/200411/15/2004PPASS
DetailsDave Hannah
Finaled by inspector at 11/15/2004 1:05:08 PM
BLD-Final11/15/200411/15/200411/15/2004PPASS
DetailsDave Hannah
BLD-Aging Inspection8/2/20048/2/20048/2/2004 NR
DetailsTony Young
FIRE-Final Inspection12/18/200312/19/200312/19/2003APASS
DetailsRick Jackson
###-#### Dave; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/19/2003 8:13:18 AM installed per plans; the GC said the owner is going to remove the pallet racks 12/19/2003 10:08:07 AM
Routing - PLAN CHECK12/18/2003 12/18/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/18/2003 DONE
Permit Ready to Issue  12/18/2003 DONE
Telephone call  12/18/2003 DONE
left mess that permit is ready
Issue PAID IN FULL permit  12/18/2003 DONE
Inspection Record Card- Bld  12/18/2003  
Plan assigned to (R_H)12/8/2003 12/18/2003 PASS
Details
12/18/2003 08:34:10 RMH - activity updated through activity BLDA022 from case BLD03-02909.
Routing - FIRE12/16/2003 12/17/2003 PASS
DetailsBill Alexander
Telephone call  12/17/2003 DONE
Called Steve Kembel regarding information provided and storage height limit requirements for flammable combustible liquids which are not met. Requested a letter addressing modifying the storage height and keeping under the limits allowed for the fire sprinkler system design verification deficiency.
Will hold for one more day, before returning to Building Review.
Plan Review Completed(1st rev)  12/17/2003 DONE
Case Summary (BLD)  12/16/2003 DONE
Routing - PLAN CHECK12/8/2003 12/16/2003 PEND
No corrections required by building department plan review, permit pending fire departments review. Routed to the fire department on 12/16/03
Plans ACCEPTED BY PLAN TECH  12/5/2003 DONE
Application received  12/4/2003  
Recd Pcfee & Taken To Pln CK  12/4/2003 DONE
Fee Review-notes12/4/200312/4/2003