Permit Information
Permit NumberBLD03-02910
StatusFinaled
Name EAGLES CENTER (1ST & 2ND FLRS)
Site Address 223 N 6TH ST
Project NameEAGLES CENTER
Customer Number 
ePlanReviewNo
Description
(EAGLES CENTER - 1ST FLOOR INFILL AND PARTIAL 2ND FLOOR DEMOLITION) Fire sprinklers substitute for 1-hr fire-resistance-rated construction. To construct a 271 square foot floor infill on the 1st floor. Work on the 1st floor is to include 2x10 floor joists, OSB floor sheathing, joists hangers, interior nonbearing walls, and a staggered stud interior nonbearing wall. Also, to demolish 309 square feet of the 2nd floor. Work on the 2nd floor is to include a new steel floor beam, an interior nonbearing wall, interior windows, a new egress door in the existing masonry stair enclosure, and a wall infill in the existing masonry stair enclosure. All work shall comply with the approved drawings and the plan review report on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice Sent 8/2/20044/26/2005 DONE
DOC - Permit Finaled8/2/20048/2/20048/2/2004PPASS
DetailsDave Hannah
Finaled by inspector at 8/2/2004 11:45:12 AM
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Framing/Rough-in1/28/20041/29/20041/29/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/28/2004 at 9:05:40 AM. Contact: ###-####. ok to cover ceiling in basement 1/29/2004 11:19:14 AM
BLD-Framing/Rough-in1/28/20041/29/20041/29/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/28/2004 at 9:05:40 AM. Contact: ###-####. ok to cover ceiling in basement 1/29/2004 11:19:14 AM
PLANS/APPL TAKEN TO FRONT DESK  1/6/2004 DONE
Inspection Record Card- Bld  1/6/2004 DONE
Permit Ready to Issue  1/6/2004 DONE
Telephone call  1/6/2004 DONE
left message for Brian Conner --- permit is ready. left message for Michael Nigh ---permit is ready.
Issue PAID IN FULL permit  1/6/2004 DONE
Plan assigned to (CJW)12/8/2003 1/6/2004 PASS
DetailsCarl Westfall
1/6/2004 13:00:32 CJW - activity updated through activity BLDA022 from case BLD03-02910.
Routing - PLAN CHECK12/12/2003 1/6/2004 PASS
Drawings approved after review of resubmittal submitted December 30, 2003.
Plan resubmittals received  12/30/2003 DONE
Response letter to Michael Nigh, three additional calculations taken to Carl W.
Routing - FIRE12/11/2003 12/12/2003 PASS
Details
Plan Review Completed(1st rev)  12/12/2003 PASS
Details
Routing - PLAN CHECK12/8/2003 12/11/2003  
Failed first IBC plan review. IBC plan review was started December 9, 2003 and was finished December 11, 2003. A response from the engineer was required. See the plan review report. A copy was E-mailed to the architect.
Plans ACCEPTED BY PLAN TECH  12/5/2003 DONE
Application received  12/4/2003  
Recd Pcfee & Taken To Pln CK  12/4/2003 DONE
Fee Review-notes12/4/200312/4/2003