Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD03-02936
StatusFinaled
Name TRUAX COMPANY
Site Address 1271 S DIVISION ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1317 sq. ft. two story single family dwelling with a 120 sq. ft. covered entry porch and a 150 sq. ft. concrete patio at rear of structure. Work will include a 418 sq. ft. detached two car garage accessed from alley. All work will be done per approved plans, all engineering/red-lining and attached requirement lists. The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City. (1st floor 628 sq. ft.)(2nd floor 689 sq. ft.) PC #751 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/28/20045/28/20045/28/2004PPASS
DetailsJim Storey
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled5/28/20045/28/20045/28/2004PPASS
DetailsJim Storey
Finaled by inspector at 5/28/2004 2:27:08 PM
BLD-Wall cover4/30/20044/30/20044/30/2004PPASS
DetailsRuss Owen
justin; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Energy code compliance4/29/20044/29/20044/29/2004PPASS
DetailsJim Storey
Justing; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes grage eaves pending fire gyp insp. 4/29/2004 3:32:59 PM 4/29/2004 3:33:25 PM
BLD-Framing/Rough-in4/27/20044/27/20044/27/2004PPART
DetailsJim Storey
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore support mlb and trusses lateraly braced per engineering. 4/27/2004 4:02:23 PM
BLD-Footing4/20/20044/20/20044/20/2004PPASS
DetailsJim Storey
Eric; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Foundation3/1/20043/1/20043/1/2004PPASS
DetailsJim Storey
eric; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing2/27/20042/27/20042/27/2004PPASS
DetailsJim Storey
eric ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Issue PAID IN FULL permit  2/24/2004 DONE
Telephone call  1/23/2004 DONE
left mess that permit is ready
Plan assigned to (DJO)12/11/200312/11/20031/6/2004 PASS
DetailsDan Overy
1/6/2004 10:05:36 DJO - activity updated through activity BLDA022 from case BLD03-02936.
Plan Reviewer's activity  1/6/2004 DONE
have received revised plans, all engineering and correct enegy calcs. ok to issue.
PLANS/APPL TAKEN TO FRONT DESK  1/6/2004 DONE
Case Summary (BLD)  1/6/2004 DONE
Plan Review Report  1/6/2004 DONE
Inspection Record Card- Bld  1/6/2004 DONE
Permit Ready to Issue  1/6/2004 DONE
Telephone call  1/6/2004 DONE
spoke with Rob -- permit is ready.
Plans ACCEPTED BY PLAN CHECK  12/11/2003  
Plan Reviewer's activity  12/11/2003 PEND
plans are being rejected. wrong engineering, holdowns not indicated on foundation plans, rescheck incorrect, excess literature (garbage) attached to plans and garage framing, etc not included.
Pending Assignment by DJO12/8/2003 12/11/2003 DONE
DetailsDan Overy
12/11/2003 14:46:45 DJO - activity updated through activity BLDA169 from case BLD03-02936.
Routing - PUBLIC WORKS12/9/2003 12/10/2003 PASS
Routing - PLANNING12/9/2003 12/9/2003 PASS
Fireplace allowed in side--may not have eave overhang. See notes. AKT
Application received  12/8/2003  
Routing - PLANNING Land Div12/8/2003 12/8/2003 PASS
Approved. Lot 12, Block 33 of South Boise 1st.
Routing - PLAN CHECK12/10/2003