Permit Information
Permit NumberBLD03-02947
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Building #3
Customer NumberPSC6360
ePlanReviewNo
Description
Micron Building #3 & #1 - Remodel Pollution Abatement for Production Tools * To demo the Pollution Abatement area and remodel for fab area. This work to include exterior wall modifications, constructing a new raised concrete loading dock with equipment lift. The interior remodel will include clean room walls, raised floor, HEPA ceiling system and all related plumbing, mechanical and electrical to create a dry etch bay and two plenum areas. This work also includes the remodel of the mechanical area at the second floor. This work is being done on the first and second floors of Building #3 between grid lines 1&4 and A&D. This permit also includes modification work at corridor 101P and reverse door swing at door #101B at Chemical Distribution Room 102I. This permit also includes the relocation and addition of some TCS units and related piping, mechanical and electrical at the second floor of Building #1 between grid lines B&C and 3&6. All construction per the approved plans and attached comment list. PC#759-03/JCM A deferred submittal for the second exit must be approved and installed before occupancy will be approved, see plan reviewer activity 3/25/04. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  6/10/2004 DONE
Letter of Compliance issued 6-10-04.
BLD-Final6/7/20046/8/20046/8/2004PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry
FIRE-Final Inspection5/13/20045/14/20045/14/2004APASS
DetailsRick Jackson
Internet Inspection Request from: Wayne Berry
FIRE-Final Inspection5/6/20045/6/20045/6/2004ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/6/2004 at 6:52:31 AM. Contact: ###-####. Alarms not ready so this will be inspected at alarm final 5/6/2004 8:48:34 AM
BLD-Conference4/23/20044/23/20044/23/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/23/2004 at 7:29:31 AM. Contact: ###-####. strucral steel ok 4/23/2004 2:49:34 PM
BLD-Footing4/20/20044/22/20044/22/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2004 at 8:08:31 AM. Contact: ###-####. placed with special insp. 4/22/2004 8:17:34 AM
BLD-Footing4/20/20044/22/20044/22/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2004 at 8:09:35 AM. Contact: ###-####. placed with special insp. 4/22/2004 3:55:21 PM
BLD-Conference4/20/20044/21/20044/21/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2004 at 8:07:54 AM. Contact: ###-####. reviewed handrail requriments. 4/21/2004 9:19:29 AM
BLD-Footing4/20/20044/20/20044/20/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/20/2004 at 8:07:54 AM. Contact: ###-####. placed w/si 4/20/2004 2:33:08 PM
BLD-Conference4/16/20044/16/20044/16/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/16/2004 at 9:26:26 AM. Contact: ###-####.
Plan resubmittals received  4/13/2004 DONE
Received two copies of revised sheets A2.2A.2. Routed to Jim Storey. kmm
Print Occupancy Form  3/26/2004 DONE
Permit Ready to Issue  3/26/2004 DONE
Telephone call  3/26/2004 DONE
email to Paul and Darla permit ready and fee due
Issue & PRINT to be Invoiced  3/26/2004 DONE
Routing - PLAN CHECK2/12/2004 3/25/2004 PASS
Plan Reviewer's activity  3/25/2004 PASS
Plan resubmittals reviewed and approved with the undrstanding that a second exit from the exterior balcony, for electrical room #200C, will be submitted for review and approval as a deferred submittal. After approval, the second exit must be installed per the approved plans before occupancy. JCM
PLANS/APPL TAKEN TO FRONT DESK  3/25/2004 DONE
Plan assigned to (JCM)12/18/2003 3/25/2004 PASS
DetailsJohn Menard
3/25/2004 14:09:44 JCM - activity updated through activity BLDA022 from case BLD03-02947.
Plan resubmittals requested  2/18/2004  
E-mailed the architect requesting clarification on the exiting system from the second floor. JCM
Plan resubmittals received  2/11/2004 DONE
Received three copies of revised sheets A2.1A.1, A6.0.1, A7.0.2, and one copy of response letter. Routed to John M. kmm
Routing - FIRE2/11/2004 2/11/2004 PASS
Plans approved per additioanl information provided by Micron employees via teleconference 2/10/04
Routing - FIRE1/15/2004 1/21/2004 HOLD
Initial review begun. Hold for further study, review with MF and disc'n with Micron for clarification of terms, scope, and details verifying H occupancy requirements.
Plan Review Completed(1st rev)  1/21/2004 FAIL
Failed Building, Structural & Fire
Routing - PLAN CHECK12/11/2003 1/15/2004 FAIL
Plan resubmittals requested  1/15/2004  
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
Plan resubmittals requested  1/15/2004  
Faxed a copy of the consulting structural engineer's comment list requesting resubmittals. JCM
Routing Off Site - STRUCTURAL1/12/2004 1/14/2004 PASS
sending out resubmitted calcs. Received comment list from consulting structural engineer requesting additional revisions. JCM
Plan resubmittals received  1/9/2004 DONE
One copy of response letter and three copies of additional structual calcs. Routed to John M. kmm
Plan resubmittals requested  12/22/2003  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL12/10/2003 12/19/2003 FAIL
Contacted PDQ to take plans to outside engineering. kmm Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLUMBING12/11/2003 12/11/2003 PASS
Routing - PUBLIC WORKS12/10/2003 12/11/2003 PASS
Plans ACCEPTED BY PLAN TECH  12/10/2003 DONE
Plan routing begun/TENANTS  12/10/2003 DONE
Application received  12/9/2003  
Fee Review-notes12/9/200312/9/2003