BLD-Final | 3/15/2005 | 3/16/2005 | 3/16/2005 | A | PASS |
Tom Arcoraci
|
|
|
GLEN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm 3/16/2005 9:35:12 AM
|
Letter of compliance | | | 3/16/2005 | | DONE |
|
|
|
Letter of Compliance issued 3-16-05.
|
BLD-Final | 2/22/2005 | 2/23/2005 | 2/23/2005 | P | NR |
Troy James
|
|
|
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 2/10/2005 | 2/11/2005 | 2/11/2005 | P | CANC |
Tom Arcoraci
|
|
|
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Other | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | CANC |
Tom Arcoraci
|
|
|
Glen-landscaping; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
Code Occupancy Approval | 2/11/2005 | 2/11/2005 | 2/11/2005 | P | PASS |
Scott M.Brown
|
|
|
OK TO SIGN FINAL 2/11/2005 1:51:43 PM
|
Temporary occupancy | | | 12/2/2004 | | DONE |
|
|
|
Temp. Occ. Cert. #5176 issued 12-2-04 to Sage Medical Building (shell & core).
|
FIRE-Final Inspection | 11/23/2004 | 11/23/2004 | 11/23/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 11/23/2004 1:14:51 PM
|
FIRE-Final Inspection | 11/19/2004 | 11/19/2004 | 11/19/2004 | P | FAIL |
Troy Cobbley
|
|
|
Return bends on sprinkler pendants not insulated correctly. Provide approved door hardware on southeast door and double doors into exercise room. Provide exit discharge lighting on the northwest exit. Paint curbing as discussed. 11/19/2004 2:30:21 PM
|
BLD-Final | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | PART |
Tom Arcoraci
|
|
|
ok for temp cn posted 11/18/2004 1:46:47 PM
|
BLD-Final | 11/16/2004 | 11/18/2004 | 11/18/2004 | A | CANC |
Tom Arcoraci
|
|
|
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Final Inspection | 11/17/2004 | 11/18/2004 | 11/18/2004 | A | FAIL |
Troy Cobbley
|
|
|
glenn; Phone #: ###-#### General contractor was not on site. Left message on phone. There is still tenting problems in the attic. 11/18/2004 10:25:49 AM
|
BLD-Final | 11/15/2004 | 11/16/2004 | 11/16/2004 | P | NR |
Dave Hannah
|
|
|
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice still needs fire life safty sign off 11/16/2004 3:45:50 PM
|
FIRE-Final Inspection | 11/12/2004 | 11/15/2004 | 11/15/2004 | A | CANC |
Troy Cobbley
|
|
|
Contractor called and stated that the hvac contractor was not done relocating the duct smoke detectors 11/15/2004 1:47:50 PM
|
PubWorks Occupancy Approval | 11/15/2004 | 11/15/2004 | 11/15/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 11/15/04. G.Fitts
|
BLD-Final | 11/10/2004 | 11/10/2004 | 11/10/2004 | P | NR |
Tom Arcoraci
|
|
|
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Aging Inspection | 10/25/2004 | 10/25/2004 | 10/25/2004 | | NR |
Tom Arcoraci
|
|
|
wip 10/25/2004 10:17:18 AM
|
BLD-Framing/Rough-in | 8/23/2004 | 8/24/2004 | 8/24/2004 | A | NR |
Lane Manuel
|
|
|
glen; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 8/11/2004 | 8/13/2004 | 8/13/2004 | A | PASS |
Tom Arcoraci
|
|
|
glen; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to insulate 8/13/2004 11:17:03 AM
|
BLD-Framing/Rough-in | 7/27/2004 | 8/3/2004 | 8/3/2004 | A | CANC |
Tom Arcoraci
|
|
|
Glen; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 8/3/2004 | 8/3/2004 | 8/3/2004 | P | PART |
Jim Sly
|
|
|
Trusses OK....OK to insulate Ext walls.......Still need to complete frame inspection on all interior walls. 8/3/2004 4:14:58 PM
|
BLD-Framing/Rough-in | 7/27/2004 | 7/30/2004 | 7/27/2004 | A | CANC |
Tom Arcoraci
|
|
|
Glen; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Inspection cancelled from web by: Aimee Hughes
|
BLD-Framing/Rough-in | 6/7/2004 | 6/8/2004 | 6/8/2004 | P | PART |
Tom Arcoraci
|
|
|
shear wall inspection please///glenn; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to roof and side 6/8/2004 2:32:37 PM
|
BLD-Footing | 4/29/2004 | 4/30/2004 | 4/30/2004 | P | PART |
Tom Arcoraci
|
|
|
###-#### glenn other int footings ok 4/30/2004 1:47:08 PM 4/30/2004 1:47:31 PM
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 4/29/2004 | | |
|
|
|
|
BLD-Foundation | 4/19/2004 | 4/20/2004 | 4/20/2004 | A | FAIL |
Tom Arcoraci
|
|
|
glenn anderson; Phone #: ###-#### Internet Inspection Request from: Barbara Moore interior fts poured without insp 4/20/2004 10:14:57 AM 4/20/2004 10:15:35 AM
|
BLD-Footing | 4/9/2004 | 4/12/2004 | 4/12/2004 | A | PASS |
Tom Arcoraci
|
|
|
STEVE PLANS IN JOB BOX; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | PASS |
Tom Arcoraci
|
|
|
approved set of plans are in the job desk///steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
(F) Reprint permit | | | 2/24/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/23/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/20/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/20/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2004 | | DONE |
|
|
|
e-mailed Wes Steele -- permits are ready.
|
Routing Off Site -Energy | 2/3/2004 | | 2/19/2004 | | PASS |
|
|
|
Contacted Eric M for energy review on resubmitted plans of 2/2/04. kmm
|
Plan assigned to (MLO) | 12/15/2003 | | 2/19/2004 | | PASS |
Mike Otto
|
|
|
2/19/2004 15:27:04 MLO - activity updated through activity BLDA022 from case BLD03-02970.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/11/2004 | | 2/11/2004 | | NR |
|
|
|
|
Routing - FIRE | 2/6/2004 | | 2/9/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 2/9/2004 | | 2/9/2004 | | NR |
|
|
|
|
Routing - PLANNING | 2/3/2004 | | 2/5/2004 | | PASS |
|
|
|
approved.
|
Routing - PLANNING Land Div | 2/3/2004 | | 2/3/2004 | | PASS |
|
|
|
Approved. Two parcels have been combined under Tax Parcel #R1009000615.
|
Routing - PUBLIC WORKS | 1/30/2004 | | 2/2/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/2/2004 | | DONE |
|
|
|
Received three copies of revised sheets C-1, 3 floor plan, 8 cabinet details, 11 electrical and M-1 comm check calcs & sky light info. Routed to Mike Otto. kmm
|
Routing - Erosion and Sediment | 1/29/2004 | | 1/30/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 1/21/2004 | | 1/22/2004 | | FAIL |
|
|
|
Address ok\\requires geotech test hole per Brian M.
|
Routing - PLAN CHECK | 1/22/2004 | | 1/22/2004 | | NR |
|
|
|
|
Routing - PLANNING | 1/20/2004 | | 1/21/2004 | | PASS |
|
|
|
Approved per DRH03-155.
|
Routing - PUBLIC WORKS | 1/14/2004 | | 1/15/2004 | | FAIL |
|
|
|
Requires a Geotech test hole per Brian M.
|
Routing - FIRE | 1/8/2004 | | 1/12/2004 | | FAIL |
|
|
|
additional hydrants required.
|
Routing Off Site -Energy | 12/15/2003 | | 1/8/2004 | | FAIL |
|
|
|
Contacted Erik Makela for outside energy review. kmm Corrections sent to architect
Re-faxed corrections to Tim S. at Dave Evans Const. on 1-14-2004 MLO
|
Plan resubmittals received | | | 1/8/2004 | | DONE |
|
|
|
Received revised cert of value to reflect the three TI's. kmm
|
Received Certificate of Value | | | 1/8/2004 | | DONE |
|
|
|
Received revised cert. of value to reflect three TI's. Initial cert. of value $674,592 elect. $9178 plumb. $5000 fire sprinkler $37,990 mech. and fire alarm systems n/a. kmm
|
Routing - PLAN CHECK | 12/22/2003 | | 1/8/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/29/2003 | | DONE |
|
|
|
Received three copies of revised ESC plan and narrative. Routed to Mike O. kmm
|
Routing - PLUMBING | 12/22/2003 | | 12/22/2003 | | PASS |
|
|
|
PROVIDE THERMOL EXPANTION PROTECTION, IF PREMISE PROTECTION IS TO BE INSTALLED OUTSIDE BY THE METER USE AN APPROVED VAULT, NO FIXTURE BRANCHES UPSTREAM OF THE MAIN SHUTOFF VALVE.
|
Routing - PLANNING | 12/19/2003 | | 12/22/2003 | | FAIL |
|
|
|
Does not meet conditions 1d and 1e. Will contact applicant.
|
Routing - PLANNING | 12/18/2003 | | 12/19/2003 | | PASS |
|
|
|
Susan Riggs cup97-00055 / Sarah Schafer DRH03-00155
Pending DR approval
|
Routing - PUBLIC WORKS | 12/16/2003 | | 12/18/2003 | | FAIL |
|
|
|
Requires geotech test hole.
|
Routing - Erosion and Sediment | 12/18/2003 | | 12/18/2003 | | FAIL |
|
|
|
ESC incomplete. Discussed with plan designer.
|
Routing - PLANNING Land Div | 12/12/2003 | | 12/16/2003 | | FAIL |
|
|
|
Need to combine into one parcel.
|
Pending Assignment by JCM | 12/12/2003 | | 12/15/2003 | | DONE |
John Menard
|
|
|
12/15/2003 07:54:23 JCM - activity updated through activity BLDA174 from case BLD03-02970.
|
Application received | | | 12/12/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/12/2003 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/12/2003 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/12/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/13/2004 | | 1/13/2003 | | NR |
|
|
|
|
Fee Review-notes | 12/12/2003 | 12/12/2003 | | | |
|
|
|
|