Telephone call | | | 10/21/2005 | | DONE |
|
|
|
Per Roger Cox on electrical final value of $28,658--Blackham Elec. only $16,267 the remaining $12,391 is becase they supplied the light fixtures 10/21/05 LEG
|
Telephone call | | | 9/20/2005 | | DONE |
|
|
|
called Blackham Elec. and left voicemessage to fax over copy of contract
|
Second Notice BLD | 9/14/2005 | 9/14/2005 | 9/14/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/11/2005 | 9/14/2005 | | DONE |
|
|
|
|
BLD-Final | 6/30/2005 | 7/1/2005 | 7/1/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/30/2005 at 3:46:30 PM. Contact: ###-####. OK for Perm Occ ():
|
Permanent occupancy | | | 7/1/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10649 issued 7-1-05 to Church of Christ in Boise.
|
Code Occupancy Approval | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PASS |
Scott M.Brown
|
|
|
OK FINAL SIGNED OFF
|
FIRE-Final Inspection | 6/29/2005 | 6/30/2005 | 6/30/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
PubWorks Occupancy Approval | 6/30/2005 | 6/30/2005 | 6/30/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 6/30/05. G.Fitts
|
Permanent Occupancy | | 6/30/2005 | 6/30/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/14/2005 | | DONE |
|
|
|
|
BLD-Energy code compliance | 4/26/2005 | 4/27/2005 | 4/27/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/26/2005 at 2:01:54 PM. Contact: ###-####.
|
BLD-Energy code compliance | 4/25/2005 | 4/26/2005 | 4/26/2005 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 11:53:47 AM. Contact: ###-####. C/N on Misc Energy Code. 4/26/2005 10:52:16 AM
|
BLD-Framing/Rough-in | 4/21/2005 | 4/22/2005 | 4/22/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 3:22:33 PM. Contact: ###-####. All framing pass. 4/22/2005 12:36:43 PM
|
BLD-Conference | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | PART |
Jim Sly
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Top layer of rock on tunnelized corridor OK. Framing for deck platform OK. 4/6/2005 10:18:55 AM
|
BLD-Framing/Rough-in | 3/15/2005 | 3/16/2005 | 3/16/2005 | A | PART |
Jim Sly
|
|
|
Roger; Phone #: ###-#### Internet Inspection Request from: Jan Rice Roof nailing and shear nailing OK. 3/16/2005 9:08:47 AM
|
BLD-Footing | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | PART |
Jim Sly
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Setbacks and reinforcing OK.......Need Special insp (3500psi) or Stamped letter from Engineer specifying concrete design strength 2500 or less. 2/7/2005 3:47:15 PM
|
(F) Reprint permit | | | 1/25/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/24/2005 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 1/7/2005 | | DONE |
|
|
|
per letter from jenifer extend permit until january 31st 2005 letter on file with records
|
Telephone call | | | 1/3/2005 | | DONE |
|
|
|
tlk to secretary ###-#### that permit and fees are ready to be picked up
|
Inspection Record Card- Bld | | | 12/30/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/30/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/30/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/28/2004 | | 12/29/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan Reviewer's activity | | | 12/29/2004 | | DONE |
|
|
|
TIME TO PICK-UP PERMIT: A letter has been issued by Jenifer Gilliland on 12/29/2004 giving the applicant of this permit until 1/31/2005 to pay for in full and obtain the building permit for this project. If the permit is not picked-up by 1/31/2005 the permit application shall be expired.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2004 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 12/19/2003 | | 12/29/2004 | | PASS |
Mike Otto
|
|
|
12/29/2004 13:46:33 MLO - activity updated through activity BLDA022 from case BLD03-03021.
|
Plan resubmittals received | | | 12/28/2004 | | DONE |
|
|
|
Received five copies of revised sheet ES1-1 and five copies of plan narrative. Routed to Mike O. kmm
|
Telephone call | | | 12/15/2004 | | DONE |
|
|
|
Called Roger Cox about permit expiration. Last activity 10/19/04. Roger stated architect working on erosion control. Informed Roger of extension request. MLO
|
Routing - PLAN CHECK | 10/18/2004 | | 10/19/2004 | | PASS |
|
|
|
|
Routing - PLUMBING | 10/19/2004 | | 10/19/2004 | | PASS |
|
|
|
indirect waste receptors are not allowed in consealed locations, tie condensate to lav traps? additional cross connection protection may be required, baptistry, etc.
|
Routing - Erosion and Sediment | 10/19/2004 | | 10/19/2004 | | FAIL |
|
|
|
ESC plan not per standards set forth in BCC 8-17. RP not "out to bid" because contractor is identified.
|
Routing - PLAN CHECK | 10/19/2004 | | 10/19/2004 | | PEND |
|
|
|
waiting for additional info
|
Plan resubmittals received | | | 10/11/2004 | | DONE |
|
|
|
Via fax Carter Somerset (ME engineer) sent a cover letter and copied portions of proposed revisions to plan sheets M1-0, M1-1, MP5-0, Ruskin manufacturer's detail, and hand drawn horizontal fire/smoke damper installation detail for sheet M4-1. Faxed information given to Mike Otto.
|
Routing - PUBLIC WORKS | 10/7/2004 | | 10/8/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/8/2004 | | 10/8/2004 | | FAIL |
|
|
|
put in call to mechanical engineer in Florida to resolve missing smoke dampers in corridor.
|
Routing - FIRE | 10/4/2004 | | 10/7/2004 | | PASS |
|
|
|
Revised comments to reflect revised plans.
|
Routing - PLAN CHECK | 10/1/2004 | | 10/4/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals received | | | 9/29/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Sets of A1-1,A2-1,A2-2,S1-1 Taken to Mike Otto....
|
Plan resubmittals received | | | 9/16/2004 | | DONE |
|
|
|
Received 3 Sets of G 1-1,C 1-2,A 1-1,A 1-2,A 2-1, A 2-2,P1-1,P1-2,M1-0,M1-1,MP5-0 Taken to Mike Otto.....
|
Telephone call | | | 9/16/2004 | | DONE |
|
|
|
call from R. Cox stating that plans resubmitted on 9/16/2004 will have changes to structual design, exterior windows to change. Resubs not ready for review. MLO 9/16/2004
|
Routing - FIRE | 7/27/2004 | | 7/29/2004 | | FAIL |
|
|
|
Resubmittal did not show hydrant location; added sprinklers but riser location is inconsistent on plans; need control valve option specified; need AS water design info. Revised review discussed with and faxed to architect.
|
Routing - PLANNING | 7/21/2004 | | 7/27/2004 | | PASS |
|
|
|
Mark Pecchenino Approved per CUP03-00050 Mod 1. Do not issue building permit until Erosion Control Permit has been issued.
|
Routing - PLAN CHECK | 7/14/2004 | | 7/20/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 7/20/2004 | | DONE |
|
|
|
IBC corrections
|
Routing - PUBLIC WORKS | 7/12/2004 | | 7/14/2004 | | FAIL |
|
|
|
GEOTECH REPORT: CONTACT BRIAN MURPHY AT ###-####
|
Plan resubmittals received | | | 7/14/2004 | | DONE |
|
|
|
Received Transmittal Letter,& 3 Sets of S 1-1, S 1-2 Taken to Mike Otto
|
Plan resubmittals received | | | 7/9/2004 | | DONE |
|
|
|
Received 2 Sets of G 1-1, C1.0, C 1-0, C1-1, L1-1, A1-1, A1-2, A1-3, A2-1, A2-2, P1-1, P1-2, M1-1, M3-1, E2.0, E2.1F,E2.1L, E2.1P, E2.1S Taken to Mike Otto
|
Plan resubmittals received | | | 7/8/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Zone load calcs ( booklets ) 2 Sets of G 1-1, C1.0, C1-0, C1-1, L1-1, A 1-1, A 1-2, A 1-3, A 2-1, A 2-2, P1-1, P1-2, M1-1, M3-1, E2.0, E2.1F, E2.1L, E2.1P, E2.1S ... Taken to Mike Otto
|
Routing - PUBLIC WORKS | 6/16/2004 | | 6/18/2004 | | FAIL |
|
|
|
Left message ( Requires Drainage Plan ): geotech report required
|
Routing - PLAN CHECK | 6/18/2004 | | 6/18/2004 | | |
|
|
|
hold
|
Routing - PLAN CHECK | 1/22/2004 | | 1/22/2004 | | NR |
|
|
|
|
Routing - FIRE | 1/16/2004 | | 1/21/2004 | | FAIL |
|
|
|
FD access, fire flow and fire hydrant issues. Review faxed to architect.
|
Routing Off Site -Energy | 12/19/2003 | | 1/16/2004 | | FAIL |
|
|
|
Contacted Ron O for energy review. kmm Corrections sent to architect
|
Plan resubmittals requested | | | 1/16/2004 | | DONE |
|
|
|
IBC and energy corrections
|
Routing - PLAN CHECK | 1/6/2004 | | 1/16/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLANNING | 1/2/2004 | | 1/5/2004 | | PEND |
|
|
|
Mark Pecchenino Approved per CUP03-00050. Pending approval of Erosion Control Permit
|
Routing - PLUMBING | 1/5/2004 | | 1/5/2004 | | PASS |
|
|
|
PLEASE PROVIDE A SITE PLAN SHOWING THE SIZE AND LOCATION OF THE SEWER AND WATER SERVICE PIPING.
|
Routing - Erosion and Sediment | 12/31/2003 | | 1/2/2004 | | FAIL |
|
|
|
ESC plan does not meet requirments of BCC 8-17, App. A and C.
|
Routing - PUBLIC WORKS | 12/22/2003 | | 12/31/2003 | | FAIL |
|
|
|
Requires drainage plan and geotec report. Per Brian M. kmm
|
Routing - PLANNING Land Div | 12/19/2003 | | 12/22/2003 | | PASS |
|
|
|
Parcel was legal parcel in County prior to annexation in 1993.
|
Plans ACCEPTED BY PLAN TECH | | | 12/19/2003 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/19/2003 | | DONE |
|
|
|
|
Application received | | | 12/19/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/19/2003 | | |
|
|
|
|
Fee Review-notes | 12/19/2003 | 12/19/2003 | | | |
|
|
|
|
Routing - Erosion and Sediment | 12/29/2004 | | | | |
|
|
|
|