Permit Information
Permit NumberBLD03-03021
StatusFinaled
Name ROGER COX
Site Address 5425 N CLOVERDALE RD
Project NameChurch of Christ in Boise
Customer Number 
ePlanReviewNo
Description
Church of Christ in Boise - To construct a 3,690 sq. ft. one story type VB church building . Other work includes all site improvements, paving and landscaping per approved plans and attachments CUP03-00050.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  10/21/2005 DONE
Per Roger Cox on electrical final value of $28,658--Blackham Elec. only $16,267 the remaining $12,391 is becase they supplied the light fixtures 10/21/05 LEG
Telephone call  9/20/2005 DONE
called Blackham Elec. and left voicemessage to fax over copy of contract
Second Notice BLD9/14/20059/14/20059/14/2005 DONE
First Notice has not been responded to.
First Notice 7/11/20059/14/2005 DONE
BLD-Final6/30/20057/1/20057/1/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/30/2005 at 3:46:30 PM. Contact: ###-####.
OK for Perm Occ ():
Permanent occupancy  7/1/2005 DONE
Perm. Occ. Cert. # 10649 issued 7-1-05 to Church of Christ in Boise.
Code Occupancy Approval6/30/20056/30/20056/30/2005PPASS
DetailsScott M.Brown
OK FINAL SIGNED OFF
FIRE-Final Inspection6/29/20056/30/20056/30/2005PPASS
DetailsTroy Cobbley
Fire life safety finaled
PubWorks Occupancy Approval6/30/20056/30/20056/30/2005 DONE
Drainage project complete, signed permanent occupancy 6/30/05. G.Fitts
Permanent Occupancy 6/30/20056/30/2005 DONE
Details
Print Occupancy Form  6/14/2005 DONE
BLD-Energy code compliance4/26/20054/27/20054/27/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/26/2005 at 2:01:54 PM. Contact: ###-####.
BLD-Energy code compliance4/25/20054/26/20054/26/2005AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/25/2005 at 11:53:47 AM. Contact: ###-####. C/N on Misc Energy Code. 4/26/2005 10:52:16 AM
BLD-Framing/Rough-in4/21/20054/22/20054/22/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/21/2005 at 3:22:33 PM. Contact: ###-####. All framing pass. 4/22/2005 12:36:43 PM
BLD-Conference4/5/20054/6/20054/6/2005APART
DetailsJim Sly
roger; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Top layer of rock on tunnelized corridor OK. Framing for deck platform OK. 4/6/2005 10:18:55 AM
BLD-Framing/Rough-in3/15/20053/16/20053/16/2005APART
DetailsJim Sly
Roger; Phone #: ###-#### Internet Inspection Request from: Jan Rice Roof nailing and shear nailing OK. 3/16/2005 9:08:47 AM
BLD-Footing2/7/20052/7/20052/7/2005PPART
DetailsJim Sly
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Setbacks and reinforcing OK.......Need Special insp (3500psi) or Stamped letter from Engineer specifying concrete design strength 2500 or less. 2/7/2005 3:47:15 PM
(F) Reprint permit  1/25/2005  
Issue PAID IN FULL permit  1/24/2005 DONE
Ready Permit EXTENDED  1/7/2005 DONE
per letter from jenifer extend permit until january 31st 2005 letter on file with records
Telephone call  1/3/2005 DONE
tlk to secretary ###-#### that permit and fees are ready to be picked up
Inspection Record Card- Bld  12/30/2004 DONE
Print Occupancy Form  12/30/2004 DONE
Permit Ready to Issue  12/30/2004 DONE
Routing - Erosion and Sediment12/28/2004 12/29/2004 PASS
ESC plan approved with attached conditions.
Plan Reviewer's activity  12/29/2004 DONE
TIME TO PICK-UP PERMIT: A letter has been issued by Jenifer Gilliland on 12/29/2004 giving the applicant of this permit until 1/31/2005 to pay for in full and obtain the building permit for this project. If the permit is not picked-up by 1/31/2005 the permit application shall be expired.
PLANS/APPL TAKEN TO FRONT DESK  12/29/2004 DONE
Plan assigned to (MLO)12/19/2003 12/29/2004 PASS
DetailsMike Otto
12/29/2004 13:46:33 MLO - activity updated through activity BLDA022 from case BLD03-03021.
Plan resubmittals received  12/28/2004 DONE
Received five copies of revised sheet ES1-1 and five copies of plan narrative. Routed to Mike O. kmm
Telephone call  12/15/2004 DONE
Called Roger Cox about permit expiration. Last activity 10/19/04. Roger stated architect working on erosion control. Informed Roger of extension request. MLO
Routing - PLAN CHECK10/18/2004 10/19/2004 PASS
Routing - PLUMBING10/19/2004 10/19/2004 PASS
indirect waste receptors are not allowed in consealed locations, tie condensate to lav traps? additional cross connection protection may be required, baptistry, etc.
Routing - Erosion and Sediment10/19/2004 10/19/2004 FAIL
ESC plan not per standards set forth in BCC 8-17. RP not "out to bid" because contractor is identified.
Routing - PLAN CHECK10/19/2004 10/19/2004 PEND
waiting for additional info
Plan resubmittals received  10/11/2004 DONE
Via fax Carter Somerset (ME engineer) sent a cover letter and copied portions of proposed revisions to plan sheets M1-0, M1-1, MP5-0, Ruskin manufacturer's detail, and hand drawn horizontal fire/smoke damper installation detail for sheet M4-1. Faxed information given to Mike Otto.
Routing - PUBLIC WORKS10/7/2004 10/8/2004 PASS
Routing - PLAN CHECK10/8/2004 10/8/2004 FAIL
put in call to mechanical engineer in Florida to resolve missing smoke dampers in corridor.
Routing - FIRE10/4/2004 10/7/2004 PASS
Revised comments to reflect revised plans.
Routing - PLAN CHECK10/1/2004 10/4/2004 FAIL
corrections sent to architect
Plan resubmittals received  9/29/2004 DONE
Received Transmittal Letter, & 3 Sets of A1-1,A2-1,A2-2,S1-1 Taken to Mike Otto....
Plan resubmittals received  9/16/2004 DONE
Received 3 Sets of G 1-1,C 1-2,A 1-1,A 1-2,A 2-1, A 2-2,P1-1,P1-2,M1-0,M1-1,MP5-0 Taken to Mike Otto.....
Telephone call  9/16/2004 DONE
call from R. Cox stating that plans resubmitted on 9/16/2004 will have changes to structual design, exterior windows to change. Resubs not ready for review. MLO 9/16/2004
Routing - FIRE7/27/2004 7/29/2004 FAIL
Resubmittal did not show hydrant location; added sprinklers but riser location is inconsistent on plans; need control valve option specified; need AS water design info. Revised review discussed with and faxed to architect.
Routing - PLANNING7/21/2004 7/27/2004 PASS
Mark Pecchenino Approved per CUP03-00050 Mod 1. Do not issue building permit until Erosion Control Permit has been issued.
Routing - PLAN CHECK7/14/2004 7/20/2004 FAIL
corrections sent to architect
Plan resubmittals requested  7/20/2004 DONE
IBC corrections
Routing - PUBLIC WORKS7/12/2004 7/14/2004 FAIL
GEOTECH REPORT: CONTACT BRIAN MURPHY AT ###-####
Plan resubmittals received  7/14/2004 DONE
Received Transmittal Letter,& 3 Sets of S 1-1, S 1-2 Taken to Mike Otto
Plan resubmittals received  7/9/2004 DONE
Received 2 Sets of G 1-1, C1.0, C 1-0, C1-1, L1-1, A1-1, A1-2, A1-3, A2-1, A2-2, P1-1, P1-2, M1-1, M3-1, E2.0, E2.1F,E2.1L, E2.1P, E2.1S Taken to Mike Otto
Plan resubmittals received  7/8/2004 DONE
Received Transmittal Letter, 2 Zone load calcs ( booklets ) 2 Sets of G 1-1, C1.0, C1-0, C1-1, L1-1, A 1-1, A 1-2, A 1-3, A 2-1, A 2-2, P1-1, P1-2, M1-1, M3-1, E2.0, E2.1F, E2.1L, E2.1P, E2.1S ... Taken to Mike Otto
Routing - PUBLIC WORKS6/16/2004 6/18/2004 FAIL
Left message ( Requires Drainage Plan ): geotech report required
Routing - PLAN CHECK6/18/2004 6/18/2004  
hold
Routing - PLAN CHECK1/22/2004 1/22/2004 NR
Routing - FIRE1/16/2004 1/21/2004 FAIL
FD access, fire flow and fire hydrant issues. Review faxed to architect.
Routing Off Site -Energy12/19/2003 1/16/2004 FAIL
Contacted Ron O for energy review. kmm Corrections sent to architect
Plan resubmittals requested  1/16/2004 DONE
IBC and energy corrections
Routing - PLAN CHECK1/6/2004 1/16/2004 FAIL
corrections sent to architect
Routing - PLANNING1/2/2004 1/5/2004 PEND
Mark Pecchenino Approved per CUP03-00050. Pending approval of Erosion Control Permit
Routing - PLUMBING1/5/2004 1/5/2004 PASS
PLEASE PROVIDE A SITE PLAN SHOWING THE SIZE AND LOCATION OF THE SEWER AND WATER SERVICE PIPING.
Routing - Erosion and Sediment12/31/2003 1/2/2004 FAIL
ESC plan does not meet requirments of BCC 8-17, App. A and C.
Routing - PUBLIC WORKS12/22/2003 12/31/2003 FAIL
Requires drainage plan and geotec report. Per Brian M. kmm
Routing - PLANNING Land Div12/19/2003 12/22/2003 PASS
Parcel was legal parcel in County prior to annexation in 1993.
Plans ACCEPTED BY PLAN TECH  12/19/2003 DONE
Plan routing begun/NEW & ADDTN  12/19/2003 DONE
Application received  12/19/2003  
Recd Pcfee & Taken To Pln CK  12/19/2003  
Fee Review-notes12/19/200312/19/2003   
Routing - Erosion and Sediment12/29/2004