Permit Information
Permit NumberBLD03-03025
StatusFinaled
Name COLE ASSOCIATES ARCHITECTS
Site Address 13238 W PERSIMMON LN
Project NameATLANTIS OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
Atlantis Dental Clinic (Shell Building) - To construct a new 4300 square foot, one story, wood framed shell office building for two future tenant spaces and related site improvements. All costruction per the approved plans and attached comment list. DRH03-00218/PC#784-03/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/26/2004  
FIRE-Final Inspection6/29/20046/30/20046/30/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled 6/30/2004 3:04:13 PM
BLD-Final6/29/20046/30/20046/30/2004PPASS
DetailsJim Sly
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Final OK........Bonded for Landscaping. 6/30/2004 3:12:53 PM
DOC - Permit Finaled6/30/20046/30/20046/30/2004PPASS
DetailsJim Sly
Finaled by inspector at 6/30/2004 3:13:02 PM
FIRE-Final Inspection6/25/20046/28/20046/28/2004AFAIL
DetailsTroy Cobbley
Get permit to perform the sprinkler work per the review notes, provide exiting from the corridor outside of wormens restroom 111, provide ADA approved hardware on pocket door, relocate duct smoke detectors as discussed with hvac contractor 6/28/2004 12:44:42 PM
BLD-Framing/Rough-in4/22/20044/22/20044/22/2004PFAIL
DetailsTroy James
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Provide new floor plan showing the new demising wall and to show the 1 hour wall deleted from plans. Will approve plans on site and submit to building dept. Provide 18" x 24" clear crawl space access. Need rough plumbing approval. Fill in sheathing at roof trusses over exterior walls where overbuild is located. Need to have a complete draft stop system. 4/22/2004 3:23:00 PM
BLD-Framing/Rough-in4/15/20044/16/20044/16/2004APART
DetailsJim Sly
Brian -- sheer wall; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Shear OK. 4/16/2004 12:02:47 PM
BLD-Foundation2/18/20042/19/20042/19/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/18/2004 at 5:21:57 PM. Contact: ###-####.
BLD-Footing2/17/20042/18/20042/18/2004PPASS
DetailsJim Sly
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
(F) Reprint permit  2/18/2004  
Issue PAID IN FULL permit  2/17/2004 DONE
Routing - FIRE2/6/2004 2/13/2004 PASS
resubmittal acceptable.
Routing - PLAN CHECK2/13/2004 2/13/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/13/2004 PASS
Inspection Record Card- Bld  2/13/2004 DONE
Permit Ready to Issue  2/13/2004 DONE
Telephone call  2/13/2004 DONE
spoke with Bruce Poe -- permit is ready.
Plan assigned to (JCM)1/5/2004 2/13/2004 PASS
DetailsJohn Menard
2/13/2004 15:16:22 JCM - activity updated through activity BLDA022 from case BLD03-03025.
Routing - PLAN CHECK1/30/2004 2/6/2004  
Routing - PLUMBING2/6/2004 2/6/2004 PASS
ADDITIONAL CROSS CONNECTION PROTECTION MAY BE REQUIRED, INTAKE AND EXHAUST FROM EQUIPMENT MUST BE PER NFPA 99, VERIFY PREMISE PROTECTION WITH BILL THOMPSON, UNITED WATER, R.P. MAY BE REQUIRED.
Plan resubmittals requested  2/5/2004 FAIL
E-miled the architect and requested additional resubmittals to clarify proposed construction. JCM
Plan resubmittals received  2/3/2004 DONE
Received a response letter, plumbing review comments, three sets of sheets A1.0,A2.0,A8.0,A8.1,P3.0,C1.0 taken to John M.
Routing - FIRE1/22/2004 1/29/2004 FAIL
lacking hydrant information. Review faxed to architect.
Plan Review Completed(1st rev)  1/29/2004 FAIL
Failed Building, Plumbing & Fire
Routing - PLAN CHECK1/14/2004 1/22/2004 FAIL
Plan resubmittals requested  1/21/2004  
E-mailed the architect a copy of the plan review comment list requesting revisions. Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL1/5/2004 1/15/2004 PASS
Contacted PDQ to take plans to outside engineering. kmm
Routing - PLUMBING1/8/2004 1/13/2004 FAIL
PLEASE PROVEID A PLAN SHOWING THE MED GAS AND VACUUM PIPING, USE APPROVED OXY COMPATABLE VALVES, 1/2" ID MIN. PIPE SIZE, INDIRECT WASTE RECEPTORS MAY NOT BE LOCATED IN CABINETS, PIPE VACUUM PUMP DRAIN THROUGH AN AIR WATER SEPERATOR AND TO THE FLOOR SINK, SPRINKLER HEAD IN TANK ROOM MUST BE VERIFIED WITH FIRE INSPECTOR, PLEASE PROVIDE A CIVIL PLAN SHOWING THE SIZE AND LOCATIONS OF SEWER AND WATER SERVICES.
Routing - PLANNING1/6/2004 1/8/2004 PASS
Approve per DRH03-00218 and as noted.
Routing Off Site -Energy12/31/2003 1/6/2004 PASS
Contacted Ron O. for energy review. kmm Received an e-mail from consulting energy reviewer approving plans as submitted. JCM
Routing - PUBLIC WORKS1/5/2004 1/6/2004 PASS
Re- routed to PW for the TI permit bld04-00013
Received Certificate of Value  1/5/2004 DONE
Received revised cert. of value for shell and core only. TI for Atlantis Dental was separated out of this permit. New cert. of value * project value $166,500.
Pending Assignment by JCM12/26/2003 1/5/2004 DONE
DetailsJohn Menard
1/5/2004 09:16:57 JCM - activity updated through activity BLDA166 from case BLD03-03025.
Routing - Erosion and Sediment12/31/2003 1/2/2004 PASS
ESC plan approved with attached conditions, including contractor to notify Boise City of RP prior to start of construction.
Routing - PUBLIC WORKS12/26/2003 12/31/2003 PASS
Routing - PLANNING Land Div12/26/2003 12/26/2003 PASS
Lot 5 of Block 1 of Streeper Subdivision.
Plan routing begun/NEW & ADDTN  12/26/2003 DONE
Plans ACCEPTED BY PLAN TECH  12/26/2003 PEND
Did not see envelope compliance sheets. ESC plan designer did not sign ESC sheet. Requires TI application for the Dental space. Future tenant will require TI. Contacted Eric Peterson kmm
Application received  12/22/2003