Permit Information
Permit NumberBLD03-03027
StatusFinaled
Name BENCHMARK CONSTRUCTION
Site Address 3430 N MAPLE GROVE RD
Project NameKing of Glory Lutheran Church
Customer Number 
ePlanReviewNo
Description
King of Glory Lutheran Church (Addition) -To construct a 6,028 s.f. one story, Type VB, fully fire sprinklered classroom addition and interior/exterior remodel to existing church structure per the approved plans and attachments. CUP03-00098 Fire sprinklers used for area.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 3/11/20054/26/2005 DONE
Permanent Occupancy 3/11/20053/11/2005 DONE
Details
BLD-Final3/10/20053/11/20053/11/2005APASS
DetailsJim Sly
kerry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Perm Occ. :) 3/11/2005 8:53:57 AM
Override - Parcel Holds  3/11/2005  
Permanent occupancy UNPAID FEE  3/11/2005 DONE
Perm. Occ. Cert. # 10470 issued 3-11-05 to the King of Glory Lutheran Church classroom addn.
Override - Parcel Holds1/1/19001/1/19003/10/2005  
need insp
BLD-Conference3/7/20053/8/20053/8/2005ACANC
DetailsJim Sly
Terry; Phone #: ###-#### Internet Inspection Request from: Jan Rice
Override - Parcel Holds1/1/19001/1/19003/7/2005  
this is for landscaping
Override - Parcel Holds1/1/19001/1/19003/7/2005  
per terry has paperwork ready at site
FIRE-Final Inspection2/10/20052/11/20052/11/2005APASS
DetailsTroy Cobbley
Fire life safety finaled 2/11/2005 8:43:36 AM
BLD-Final2/10/20052/11/20052/11/2005PNR
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Perm Occ. when Code Enforce sign off for Perm. 2/11/2005 4:17:24 PM
PubWorks Occupancy Approval2/9/20052/9/20052/9/2005 DONE
Drainage project complete, signed permanent occupancy 2/9/05 D.Erskine
FIRE-Final Inspection2/4/20052/4/20052/4/2005AFAIL
DetailsTroy Cobbley
Paint curgbing for fire dept access as discussed and marked on approved drawings. Repair the two existing exit signs in the assembly hall. Provide occupant load signs for both assembly areas.
Agreement of Future work11/19/20041/14/20052/4/2005 DONE
Fire Alarm Work Finaled 2/4/2005
BLD-Framing/Rough-in1/27/20051/27/20051/27/2005PPASS
DetailsJim Sly
ceiling grid-- terry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/24/20051/25/20051/25/2005APASS
DetailsJim Sly
cieling grid inspection please///terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in1/20/20051/21/20051/21/2005PNR
DetailsJim Sly
Terry-ceiling grid; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in1/7/20051/10/20051/10/2005APART
DetailsJim Sly
Terry; Phone #: ###-#### Internet Inspection Request from: Jan Rice Library and ajacent rooms. 1/10/2005 9:37:00 AM
BLD-Framing/Rough-in12/10/200412/13/200412/13/2004APART
DetailsJim Sly
Terry; Phone #: ###-#### Internet Inspection Request from: Jan Rice Soffits/ceiling framing at main hallway OK. Sprinkler inspection...OK. 12/13/2004 10:54:20 AM
Plan resubmittals received  12/2/2004  
BLD-Framing/Rough-in11/18/200411/19/200411/19/2004APART
DetailsJim Sly
ceiling grid inspection please////terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4 conditional use rooms OK for grid. 11/19/2004 11:44:29 AM
BLD-Conference10/27/200410/28/200410/28/2004APASS
DetailsJim Sly
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need Fire Guru blessing for partial Occ. on new and old areas befor finals. 10/28/2004 3:44:15 PM
FIRE-Conference10/28/200410/28/200410/28/2004PDONE
DetailsTroy Cobbley
Contractor wants to move people out of four existing offices into four new offices. Per Dave Miller Benchmark Construction needs to submit a letter to him stating what they want to do, why they can't get fire alarm and fire sprinkler systems operational at the time they do this and a time line on when work will be completed or else they will need to vacate. 10/28/2004 4:14:10 PM
BLD-Energy code compliance9/20/20049/20/20049/20/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/20/2004 at 7:05:09 AM. Contact: ###-####. Frame pass. 9/20/2004 12:15:30 PM
BLD-Framing/Rough-in9/13/20049/14/20049/14/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/13/2004 at 2:24:42 PM. Contact: ###-####. All OK except Need to check shear wall W of restrooms at energy code insp. 9/14/2004 1:53:33 PM
BLD-Framing/Rough-in9/8/20049/10/20049/10/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/8/2004 at 7:40:43 AM. Need straps at micros to wall, complete shear wall W.of restrms. OK to insulate.

9/10/2004 3:37:17 PM 9/10/2004 3:37:42 PM
BLD-Framing/Rough-in8/30/20048/31/20048/31/2004AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/30/2004 at 1:39:09 PM. Contact: ###-####. C/N mRemove all kraft facing from existing insul....OR protect. Framing OK. 8/31/2004 10:15:07 AM
BLD-Framing/Rough-in8/26/20048/27/20048/27/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/26/2004 at 10:40:39 AM. Contact: ###-####. Framing in existing Bldg at daycare area...OK Note: Need to remove kraft paper on existing ceiling insulation. Foot and wall OK at front entry columns....N. wall. 8/27/2004 3:44:14 PM
BLD-Other8/24/20048/25/20048/25/2004PPART
DetailsJim Sly
terry - plywood inspect for new roof job; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 8/25/2004 3:03:12 PM Roof OK. 8/25/2004 3:49:58 PM
BLD-Framing/Rough-in8/16/20048/18/20048/18/2004APART
DetailsLane Manuel
TERRY SHEAR WALL; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Exter. shear nailing ok. LM 8/18/2004 11:05:22 AM
BLD-Foundation7/19/20047/20/20047/20/2004APART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/19/2004 at 1:19:28 PM. Contact: ###-####.
c/n posted on changes and fix for rebar,, ok to pour if needed 7/20/2004 11:05:25 AM
BLD-Footing7/14/20047/15/20047/15/2004APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 7/14/2004 at 3:53:15 PM. Contact: ###-####.
Issue PAID IN FULL permit  6/15/2004 DONE
Inspection Record Card- Bld  6/15/2004 DONE
Print Occupancy Form  5/28/2004 DONE
Permit Ready to Issue  5/28/2004  
Telephone call  5/28/2004 DONE
permit ready and fee due
PLANS/APPL TAKEN TO FRONT DESK  5/27/2004 DONE
Plan assigned to (MLO)12/22/2003 5/27/2004 PASS
DetailsMike Otto
5/27/2004 13:49:31 MLO - activity updated through activity BLDA022 from case BLD03-03027.
Routing - FIRE5/21/2004 5/26/2004 PASS
resubmittal acceptable.
Routing - Erosion and Sediment5/26/2004 5/26/2004 PASS
ESC approved with conditions attached to plans.
Routing - PLAN CHECK5/17/2004 5/21/2004 PASS
Routing Off Site - STRUCTURAL5/17/2004 5/20/2004 PASS
Routing Off Site -Energy12/23/2003 5/20/2004 PASS
Contacted Eric M for outside energy review. kmm corrections sent to architect
Plan resubmittals received  5/14/2004 DONE
Received Transmittal Letter , 3 Sets G-1,SD-1,S0.1,A-1,A-7,E2.1F, E2.1L,E2.1P,ES.1S, E2.1S,E3.0, Taken to Mike Otto...
Routing - FIRE1/21/2004 1/28/2004 FAIL
REview comments faxed to architect and attached to this permit.
Plan Review Completed(1st rev)  1/28/2004 FAIL
Failed Structural, Public Works, ESC, Plan Check and Fire.
Routing Off Site - STRUCTURAL12/23/2003 1/21/2004 FAIL
Contacted PDQ for outside engineering review. corrections sent to architect
Routing - PLAN CHECK1/15/2004 1/21/2004 FAIL
corrections sent to architect. MLO
Plan resubmittals requested  1/21/2004 DONE
IBC, Struc. and energy corrections
Routing - PUBLIC WORKS1/13/2004 1/15/2004 PASS
Routing - PLUMBING1/8/2004 1/9/2004 PASS
Approved per plan and as noted to provide water heater detail and thermal expansion on drawings prior to construction. Called engineer on 1/9/2004.
Plan resubmittals received  1/8/2004 DONE
Received to two L1sheets and put with plans.
Routing - PUBLIC WORKS12/23/2003 1/6/2004 FAIL
Requires drainage plan revision.
Routing - PLANNING1/6/2004 1/6/2004 PASS
Susan Riggs CUP03-00098
DRH03-00089 is not a part of this application
Routing - Erosion and Sediment1/6/2004 1/6/2004 FAIL
Individual listed as RP not certified by Boise City.
Routing - PLANNING Land Div12/23/2003 12/23/2003 PASS
Lot 1, Block 1 of King of Glory Lutheran Church Survey Subdivision.
Plans ACCEPTED BY PLAN TECH  12/23/2003 DONE
Plan routing begun/NEW & ADDTN  12/23/2003 DONE
Application received  12/22/2003  
Recd Pcfee & Taken To Pln CK  12/22/2003  
Fee Review-notes12/22/200312/22/2003