Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-03031
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 4840 N CLOVERDALE RD
Project NameSt Lukes Internal Medicine
Customer Number23-775
ePlanReviewNo
Description
Saint Lukes Internal Medicine Building * To construct a new 11,274sq.ft. single story, wood framed, fully sprinklered, medical office building, with a 600 sq.ft covered driveway entry canopy and a 459 sq.ft covered patio area, along with related site improvements. All construction per the approved plans and attached comment list. MJP DRH03-00204 PC#783-03
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  10/21/2005 DONE
recieved fax cover letter from Brian stating final value is 109,732. Called him and left voicemail that need contract, already have final value
Second Notice BLD9/29/20059/29/20059/29/2005 DONE
First Notice has not been responded to.
First Notice 9/19/20059/29/2005 DONE
Permanent occupancy UNPAID FEE  9/19/2005 DONE
Perm. Occ. Cert. # 10733 issued 9-19-05 to Saint Luke's Internal Medicine.
BLD-Final8/23/20058/23/20058/23/2005PPASS
DetailsJim Sly
after 2 pm please///ron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK for Perm Occ.... ():
FIRE-Final Inspection8/23/20058/23/20058/23/2005PPASS
DetailsForrest France
Fire life safety finaled.
Permanent Occupancy 8/23/20058/23/2005 DONE
Details
FIRE-Final Inspection8/18/20058/19/20058/19/2005PFAIL
DetailsTroy Cobbley
Still need to verify that the sprinkler spacing in the conference room and the additional dry pendants are approved with resubmittals. When the fire sprinkler permit is finaled the life safety can be finaled since items have been checked.
PubWorks Occupancy Approval8/18/20058/18/20058/18/2005 DONE
Drainage project complete, signed permanent occupancy 8/18/05. R.Rokovitz
Code Occupancy Approval  8/5/2005 PASS
Meets compliance with DRH03-00204
BLD-Other7/21/20057/22/20057/22/2005APASS
DetailsTom Arcoraci
ron NOte: ceiling cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance6/8/20056/8/20056/8/2005PPASS
DetailsJim Sly
ron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance6/6/20056/6/20056/7/2005PPART
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Continuous insp of baffles for venting attic.
FIRE-Sprinkler Rough-in5/31/20055/31/20055/31/2005PDONE
DetailsTroy Cobbley
Inspection was for inspection of insulation in the eaves. It appears to be ok to me. Insulation measured leaves less than 6" space in the combustible concealed space.
BLD-Framing/Rough-in5/20/20055/20/20055/20/2005PPASS
DetailsJim Sly
ron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in5/13/20055/13/20055/13/2005PPART
DetailsJim Sly
ron - Note: shear wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 5/13/2005 4:31:09 PM All framing and shear OK.....Need d to check fireblocking at energy code insp 5/13/2005 5:48:06 PM
BLD-Energy code compliance5/9/20055/10/20055/10/2005ANR
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Energy code compliance5/10/20055/10/20055/10/2005PPART
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Exterior walls OK. 5/10/2005 4:01:47 PM
BLD-Framing/Rough-in5/6/20055/9/20055/9/2005ANR
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in5/9/20055/9/20055/9/2005PFAIL
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted. 5/9/2005 4:09:10 PM
BLD-Framing/Rough-in4/14/20054/15/20054/15/2005PPART
DetailsJim Sly
ron Note: shear nail inspection on frame; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Shear nailing and roof nailing OK. 4/15/2005 3:04:36 PM
BLD-Footing2/2/20052/3/20052/3/2005APART
DetailsJim Sly
###-#### - RON Strata on site. 2/3/2005 11:28:51 AM
BLD-Foundation2/2/20052/2/20052/2/2005PPART
DetailsJim Sly
###-#### ron Partial walls OK pending Strata insp, tests and approvals. 2/2/2005 2:02:55 PM
BLD-Footing2/2/20052/2/20052/2/2005PPART
DetailsJim Sly
###-#### ron S. W. corner of Bldg. and Pier pads for Portacochere. 2/2/2005 2:01:19 PM 2/2/2005 2:03:46 PM
Override - People Holds  2/2/2005  
Override - People Holds  2/2/2005  
Override - People Holds  2/2/2005  
Override - People Holds  2/2/2005  
BLD-Footing1/27/20051/27/20051/27/2005PPART
DetailsJim Sly
ron ###-#### Footing OK pending STRATA special inspection, tests, and approvals. 1/27/2005 2:32:35 PM
Override - People Holds  1/27/2005  
BLD - Request for Extension1/6/20051/7/20051/7/2005 PASS
DetailsJim Sly
Going to start work on this project approx 1/10/05 BAS
BLD-Aging Inspection8/6/20048/6/20048/6/2004 DONE
DetailsJim Sly
WIP 8/6/2004 4:24:07 PM
BLD-Aging Inspection8/6/20048/6/20048/6/2004 DONE
DetailsJim Sly
WIP 8/6/2004 4:24:07 PM
(F) Reprint permit  3/31/2004  
Issue & PRINT to be Invoiced  3/29/2004 DONE
(F) Reprint permit  3/22/2004 DONE
Routing Off Site -Energy2/5/2004 2/19/2004 PASS
Contacted Eric M. for outside energy.
Passed with comments.
Routing Off Site - STRUCTURAL2/10/2004 2/19/2004 PASS
Contacted PDQ to take resubmitted plans to outside engineering.
No further review required.
Plan assigned to (M_P)1/20/2004 2/19/2004 PASS
DetailsMike Phillips
2/19/2004 13:08:51 M_P - activity updated through activity BLDA022 from case BLD03-03031.
Routing - PLAN CHECK2/19/2004 2/19/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/19/2004 DONE
Print Pending Permit.LaserJet4  2/19/2004 DONE
Case Summary (BLD)  2/19/2004 DONE
Print Occupancy Form  2/19/2004 DONE
Inspection Record Card- Bld  2/19/2004 DONE
Permit Ready to Issue  2/19/2004 DONE
Telephone call  2/19/2004 DONE
e-mailed Curtis -- permit is ready.
Plan resubmittals received  2/18/2004 DONE
Received three copies of revised site plan and one copy of response letter to Sam Rogers. kmm
Routing - PLANNING Land Div2/18/2004 2/18/2004 PASS
Approved.
Routing - FIRE2/18/2004 2/18/2004 PASS
resubmittal of A1.0 acceptable.
Routing - FIRE2/9/2004 2/17/2004 FAIL
resubmittal did not include revised sheet A1.0 referenced in architect's letter.
Plan resubmittals received  2/10/2004 DONE
Received one copy of response letter, three copies of re-evaluate shear wall calcs. one copy of lateral force and two copies of revised sheets A2.1, A2.2, routed to Mike P. kmm
Routing - PLANNING2/5/2004 2/9/2004 PASS
Approve per DRH03-204.
Routing - PLAN CHECK1/30/2004 2/5/2004 PEND
Waiting for others to approve orior to issuing permit. Others include outside engineering and outside energy review.
Routing Off Site - STRUCTURAL2/2/2004 2/4/2004 FAIL
Contacted PDQ to take resubmitted plans of 2/2/04 to outside engingeering. kmm
3rd review failed faxed comments to architect requesting additional informaiton be submitted for further review by our outside engineering firm.
Plan resubmittals received  2/4/2004 DONE
Received response letter addressed to Sam Rogers with a letter from United Water, taken to Mike P. Also received response letter to Mike P. with details and lighting compliance & lighting application worksheet, three sets of sheets ME1.0,A2.1,A4.1,A4.2, all taken to Mike P.
Plan resubmittals received  2/2/2004 DONE
Receied one copy of response the the structural plan review. Calculations illustrating the lateral loading on the building and the lateral resistance of the shear walls. Routed to Mike P. kmm
Routing - FIRE1/22/2004 1/30/2004 FAIL
Review comments faxed to architect.
Routing Off Site -Energy12/23/2003 1/22/2004 FAIL
Contacted Eric M. for outside energy review.
Additional information required for further review.
Routing - PLAN CHECK1/12/2004 1/22/2004 FAIL
Plan review completed, sent correction report to architect requesting additional informaiton be submitted for further review prior to issuing permit.
Routing Off Site - STRUCTURAL1/13/2004 1/21/2004 FAIL
Contacted PDQ to take revised plans of 1/13/04 to outside engineering. kmm
Second review failed sent correction report to architect.
Plan resubmittals received  1/13/2004 DONE
Recieved three copies of revised sheets A0.3, A2.1, A2.2., A4.3, one copy of response letter and three copies of additional calculations and revisions to 12-08-03 Calc's.
Routing - PLUMBING1/8/2004 1/12/2004 PASS
PER PLANS AND 2000 UPC
Routing - PLANNING1/6/2004 1/8/2004 PEND
Please return to Planning at end of routing. Need a cross access and parking agreement per conditions of DRH03-00204.
Routing - Erosion and Sediment12/31/2003 1/6/2004 PASS
ESC approved with conditions attached to plans.
Plan resubmittals requested  1/5/2004  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS12/23/2003 12/31/2003 PASS
Routing - PLANNING Land Div12/24/2003 12/24/2003 FAIL
Applied for ROS Property Line Adjustment on December 24, 2003. Need to complete process prior to issuing building permit.
Routing - PLANNING Land Div12/23/2003 12/23/2003 FAIL
Need proof of legal land division.
Plans ACCEPTED BY PLAN TECH  12/23/2003 DONE
Plan routing begun/NEW & ADDTN  12/23/2003 DONE
Application received  12/22/2003  
Plan assigned to (JCM)12/23/2003 1/20/2003  
DetailsJohn Menard
Reassigned this project to Mike Phillips. JCM
Fee Review-notes12/22/200312/22/2003   
Routing Off Site - STRUCTURAL12/23/2003    
Contacted PDQ for outside engineering.