BLD-Final | 8/11/2004 | 8/11/2004 | 8/11/2004 | P | PASS |
Tony Young
|
|
|
Tony-All permits finaled except Cox on HVAC- they should get final this morning. Can you make this a late afternoon inspection just in case? ; Phone #: ###-#### Internet Inspection Request from: John Lodman
c of o issued 8/11/2004 5:02:11 PM
|
BLD-Grading Inspection | 8/11/2004 | 8/11/2004 | 8/11/2004 | | PASS |
|
|
|
Final grading and drainage approved
|
DOC - Permit Finaled | 8/11/2004 | 8/11/2004 | 8/11/2004 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 8/11/2004 5:01:59 PM
|
BLD-Conference | 7/28/2004 | 7/28/2004 | 7/28/2004 | P | PART |
Tony Young
|
|
|
Tony- want to look at any potential occupancy issues. please give me 20 minutes as I'd like to be on site. looking for occupancy in about 10 days, trying not to do the usual last minute rush. Thank you.; Phone #: ###-#### Internet Inspection Request from: John Lodman
left message,,, various issues 7/29/2004 3:10:13 PM
|
BLD-Other | 6/11/2004 | 6/11/2004 | 6/11/2004 | P | PASS |
Tony Young
|
|
|
Is exterior shear passed? I think connections were looked at under previous inspection request, but no notation found. Please advise. ; Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Energy code compliance | 6/8/2004 | 6/8/2004 | 6/8/2004 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Wall cover | 6/8/2004 | 6/8/2004 | 6/8/2004 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Conference | 5/18/2004 | 5/18/2004 | 5/18/2004 | A | PART |
Tony Young
|
|
|
Contact Tony Megran for conference at ###-####, Tony will contact John Lodman. Please schedule this AM.; Phone #: ###-#### Internet Inspection Request from: John Lodman
w/ framer and contractor,,, minor frame issues 5/18/2004 12:54:00 PM
|
BLD-Framing/Rough-in | 5/17/2004 | 5/17/2004 | 5/17/2004 | P | NR |
Tony Young
|
|
|
Inspection request is for shear and permission to install insulation. Truss drawings and permitted plans above electrical panel in garage.; Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Other | 3/31/2004 | 4/1/2004 | 4/1/2004 | A | PART |
Tony Young
|
|
|
John; phone ####-####, slab insulation
vertical exterior r-10 insulation is ok on inside of stem wall 4/1/2004 9:44:05 AM
|
BLD-Other | 3/30/2004 | 3/31/2004 | 3/31/2004 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/30/2004 at 8:19:04 PM. Contact: ###-####.
|
BLD-Foundation | 3/31/2004 | 3/31/2004 | 3/31/2004 | P | PART |
Tony Young
|
|
|
John, phone####-####,, Added a pool,, need to look at prior to gunite
rebar looks ok,,, procede when ready 3/31/2004 5:18:47 PM
|
(F) Reprint permit | | | 3/31/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/25/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/25/2004 | | DONE |
|
|
|
spoke with John Lodman -- inspection record card is ready and let him know about the additional fees.
|
BLD-Foundation | 3/15/2004 | 3/15/2004 | 3/15/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/15/2004 at 7:19:39 AM. Contact: ###-####.
|
BLD-Footing | 3/12/2004 | 3/12/2004 | 3/12/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/12/2004 at 7:56:33 AM. Contact: ###-####.
|
BLD-Footing | 3/11/2004 | 3/11/2004 | 3/11/2004 | P | CANC |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 3/10/2004 | 3/10/2004 | 3/10/2004 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/10/2004 at 7:07:48 AM. Contact: ###-####.
|
BLD-Grading Inspection | 3/10/2004 | 3/10/2004 | 3/10/2004 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
BLD-Footing | 3/9/2004 | 3/9/2004 | 3/9/2004 | P | NR |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
need soil report, and compaction report 3/9/2004 2:29:18 PM
|
Issue PAID IN FULL permit | | | 2/20/2004 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/12/2004 | | 2/3/2004 | | PASS |
Steve Munroe
|
|
|
2/3/2004 13:56:09 SAM - activity updated through activity BLDA022 from case BLD03-03069.
|
Routing - Erosion and Sediment | 1/29/2004 | | 2/3/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLAN CHECK | 2/3/2004 | | 2/3/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/3/2004 | | |
|
|
|
|
Plan Review Report | | | 2/3/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/3/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/3/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/3/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/3/2004 | | DONE |
|
|
|
Spoke with John and told him that permit is ready & fees//2/3/04 4:06pm BAM
|
Routing - Erosion and Sediment | 1/28/2004 | | 1/28/2004 | | FAIL |
|
|
|
Plan not per BCC 8-17 appendix A and C. Informed PD of areas which are needed.
|
Plan resubmittals received | | | 1/26/2004 | | DONE |
|
|
|
Received two copies of ESC plan & Narrative
|
Plan Reviewer's activity | | | 1/13/2004 | | PEND |
|
|
|
1/13/04 10:00 I met with John Lodman regarding his house. He will get me the items I need for the structural questions, plus he took my marked up set.
|
Routing - PLAN CHECK | 1/12/2004 | | 1/13/2004 | | PEND |
|
|
|
|
Pending Assignment by DJO | 12/30/2003 | | 1/12/2004 | | DONE |
Dan Overy
|
|
|
1/12/2004 10:31:22 SAM - activity updated through activity BLDA183 from case BLD03-03069.
|
Routing - Erosion and Sediment | 1/9/2004 | | 1/9/2004 | | FAIL |
|
|
|
No ESC plan attached to permit.
|
Routing - PLANNING | 1/9/2004 | | 1/9/2004 | | PASS |
|
|
|
builder will adjust width of house footprint to fit the lot.
|
Routing - PLANNING | 1/8/2004 | | 1/8/2004 | | FAIL |
|
|
|
Site is marginally too small for the home footprint proposed (needs .17' to be reduced on the house)
|
Routing - PUBLIC WORKS | 1/7/2004 | | 1/8/2004 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 12/30/2003 | | 1/7/2004 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter from Boise Public Works attached to the plan
|
Application received | | | 12/30/2003 | | |
|
|
|
|