Permit Information
Permit NumberBLD04-00029
StatusFinaled
Name STOEL RIVES LLP
Site Address 101 S CAPITOL BLVD Unit: 1900
Project NameUS BANK-18/19/2TH FLRS
Customer Number 
ePlanReviewNo
Description
(STOEL RIVES LLP - US BANK BLDG - 18th, 19th, & 20th FLOORS) MODIFIED DRAWINGS WERE APPROVED ON 10-19-04. A SEPARATE 2,141 SQUARE FOOT TENANT SPACE IS ALSO BEING CREATED ON THE 18TH FLOOR. A SEPARATE CERTIFICATE OF OCCUPANCY IS REQUIRED BEFORE OCCUPANCY. This building is fire sprinklered because it is a high-rise. To expand an existing tenant space located on the 19th floor (11,626 square feet) and on the 20th floor (3,740 square feet) into the 18th floor (9,486 square feet). In addition to occupying a portion of the 20th floor and all of the 19th floor, this tenant will also occupy 9,486 square feet of the 18th floor. All levels will be interconnected by interior stairways that are not part of the egress system. The restrooms located on the 18th floor and the restrooms located on the 19th floor will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, a stairway located in a new floor opening between the 18th and 19th floor, a new stairway located in an existing floor opening between the 19th and 20th floor, interior nonbearing walls, interior windows, interior doors, millwork, suspended ceilings, gypsum board ceilings, and interior finishes all per the approved drawings and plan review report on file. The fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Third Notice BLD12/6/200512/6/200512/14/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice BLD9/20/20059/20/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 8/30/20059/20/2005 DONE
Permanent occupancy  8/30/2005 DONE
Perm. Occ. Cert. # 10706 issued 8-30-05 to Stoel Rives LLP.
Permanent Occupancy 7/8/20057/8/2005 DONE
Details
Print Occupancy Form  6/6/2005 DONE
BLD-Final5/26/20055/26/20055/27/2005PPASS
DetailsDave Hannah
jeffrey///meet on 19th please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 18 19 and 20th floors ok for perm occ
FIRE-Final Inspection5/26/20055/26/20055/26/2005PPASS
DetailsForrest France
20th floor passed inspection. Fire life safety finaled.
FIRE-Final Inspection5/25/20055/26/20055/26/2005APART
DetailsForrest France
19th floor passed inspection, 20th floor needs max occupant load sign posted in board room.
FIRE-Final Inspection3/16/20053/16/20053/16/2005PCANC
DetailsTroy Cobbley
danton; Phone #: ###-#### Do not have resubmitted fire sprinkler plans as requested to final fire permits. 3/16/2005 4:53:20 PM
Plan resubmittals received  3/2/2005  
Plan resubmittals received  3/2/2005  
BLD-Framing/Rough-in1/28/20051/31/20051/31/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/28/2005 at 10:48:16 AM. Contact: ###-####. elevator lobby on 19th floor and around stairs from 19 to 20th floor ok to cover 1/31/2005 12:50:02 PM
BLD-Framing/Rough-in12/29/200412/29/200412/29/2004PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/29/2004 at 11:00:37 AM. Contact: ###-####.
BLD-Final11/24/200411/29/200411/29/2004ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/24/2004 at 1:32:12 PM. Contact: ###-####. ok to start moving into offices on 18th floor 11/29/2004 2:06:44 PM
FIRE-Final Inspection11/29/200411/29/200411/29/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/29/2004 at 9:45:52 AM. Contact: ###-####. Phased project - okay on the 18th floor only 11/29/2004 3:51:18 PM
FIRE-Final Inspection11/23/200411/24/200411/24/2004AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/23/2004 at 3:33:00 PM. Contact: ###-####. Glazing at interior stair not installed; delay on lobby doors with mag locks is set at 40 seconds; extinguishers not tagged 11/24/2004 2:20:42 PM
BLD-Final11/23/200411/24/200411/24/2004PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/23/2004 at 3:33:42 PM. Contact: ###-####.
FIRE-Final Inspection11/23/200411/23/200411/23/2004PFAIL
DetailsRick Jackson
Mag hold opens on lobby doors need 30 second delay; glazing not installed at interior stair; extinguisehr needed in lease space and all extinguishers need annual tags 11/23/2004 2:51:39 PM
BLD-Other11/16/200411/17/200411/17/2004ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/16/2004 at 9:33:43 AM. Contact: ###-####.
BLD-Framing/Rough-in11/16/200411/16/200411/16/2004PPART
DetailsDave Hannah
Danton; Phone #: ###-#### Internet Inspection Request from: Jan Rice 18th floor ok to cover ceiling grid ok 11/16/2004 3:01:07 PM
(F) Reprint permit  10/26/2004 DONE
CHANGE STATUS TO (ISS)  10/26/2004 DONE
Re-issued permit after plan modifiactions
Inspection Record Card- Bld  10/20/2004 DONE
Print Occupancy Form  10/20/2004 DONE
Permit Ready to Issue  10/20/2004 DONE
Telephone call  10/20/2004 DONE
Spoke with Martin and told him that permit for modification is ready & fees///10/20/04 12:00pm BAS
Plan assigned to (CJW)10/14/200410/14/200410/19/2004 PASS
10/19/2004 11:58:02 CJW - activity updated through activity BLDA022 from case BLD04-00029.
Plan Reviewer's activity  10/19/2004 PASS
Completed and approved the "Plan Modification".
PLANS/APPL TAKEN TO FRONT DESK  10/19/2004 DONE
Plan Modification Accepted  10/14/2004 DONE
" Plan Modification excepted for BLD04-00029 Walls are being added on the 18th floor to subdivide a portion of the floor for a future sublease tenant".Routed to Carl Westfall.
BLD-Framing/Rough-in10/7/200410/7/200410/7/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/7/2004 at 8:48:09 AM. Contact: ###-####.restrooms ok to cover 10/8/2004 8:03:41 AM
BLD-Framing/Rough-in10/4/200410/5/200410/5/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/4/2004 at 12:01:29 PM. Contact: ###-####. ok to cover walls on 18th floor allbut for plumbing walls 10/5/2004 12:53:23 PM
BLD-Framing/Rough-in9/30/200410/1/200410/1/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/30/2004 at 8:35:09 AM. Contact: ###-####.ok tocover one side 18th floor 10/1/2004 1:27:14 PM
BLD-Conference9/21/20049/22/20049/22/2004PDONE
DetailsDave Hannah
danton; Phone #: ###-#### Note: also to attend Rick Jackson for inspection Internet Inspection Request from: Barbara Moore rick jackson and my self walked floors with arct and went over exit signs 9/23/2004 8:00:09 AM
Issue PAID IN FULL permit  8/24/2004  
Telephone call  7/12/2004 DONE
talked to martin hahle that permit is ready/will pickup in a few weeks
Telephone call  5/28/2004 DONE
spoke with Martin at CSHQA -- job has been delayed until July 16th.
Telephone call  4/7/2004 DONE
talked to martin (architect) to verify plans are ready/g.c. will pickup permit before june 1st/mls
Override - Parcel Holds  3/22/2004  
Inspection Record Card- Bld  3/22/2004 DONE
Print Occupancy Form  3/22/2004  
Permit Ready to Issue  3/22/2004  
Telephone call  3/22/2004 DONE
left mess that permit is ready
Routing - FIRE3/17/2004 3/19/2004 PASS
REsubmittal acceptable.
Routing - PLAN CHECK3/19/2004 3/19/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/19/2004 DONE
Plan assigned to (CJW)1/12/2004 3/19/2004 PASS
DetailsCarl Westfall
3/19/2004 13:09:08 CJW - activity updated through activity BLDA022 from case BLD04-00029.
Routing - PLAN CHECK3/10/2004 3/17/2004 PASS
Plan resubmittals received  3/17/2004 DONE
Received correspondence letter, response letter, three copies of supplemental structural design calculations. Taken to Carl W.
Plan resubmittals received  3/12/2004 DONE
Received response letter, three structural calculations with three sets of sheets A0.2,A9.1A,E1.18,A1.19 taken to Carl W
Routing - FIRE3/5/2004 3/9/2004  
Failed first IFC plan review. PFE's and emergency lighting of delayed egress locked doors not shown; review comments faxed to architect.
Routing - PLAN CHECK1/13/2004 3/5/2004  
Failed first IBC plan review. IBC plan review started January 28, 2004. Review put on hold until resubmitted drawings were received. IBC plan review completed March 5, 2004. Response required from the architect. See the plan review report.
Plan resubmittals received  2/23/2004 DONE
Received review & comment letter, two structural calculations, two sets of sheets A0.1,A0.2,A1.18,A1.19,A1.20,A2.18,A2.19,A2.20,A3.1A,A3.2A,A3.2B,A3.3A,A3.3B,A3.4A,A3.4B,A4.1A,A4.1B,A5.1A,A5.1B,A5.1C,A6.18,A6.19,A6.20,A9.1A,A9.1B,A9.1C,A9.1D,A9.3A,E01,E0.2,E1.18,E1.19,E1.20, taken to Carl W.
Routing - PUBLIC WORKS1/12/2004 1/13/2004 PASS
Plans ACCEPTED BY PLAN TECH  1/9/2004 DONE
Application received  1/8/2004  
Recd Pcfee & Taken To Pln CK  1/8/2004  
Fee Review-notes1/8/20041/8/2004   
Routing - PLAN CHECK10/14/2004