Case Summary (BLD) | | | 3/9/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/9/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/16/2007 | | |
|
|
|
|
Third Notice BLD | 5/20/2005 | 5/20/2005 | 12/9/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Over a year old No final values
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/15/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 7/15/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10227 issued 7-14-04 to the Reef Restaurant.
|
BLD-Final | 7/13/2004 | 7/13/2004 | 7/13/2004 | P | PASS |
Dave Hannah
|
|
|
ok for perm occ 7/13/2004 12:45:19 PM
|
Permanent Occupancy | | 7/13/2004 | 7/13/2004 | | DONE |
|
|
|
|
BLD-Final | 7/1/2004 | 7/2/2004 | 7/2/2004 | A | PART |
Dave Hannah
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ on out side area also 7/2/2004 10:51:13 AM
|
FIRE-Final Inspection | 7/1/2004 | 7/1/2004 | 7/1/2004 | P | PASS |
Rick Jackson
|
|
|
Phase 2 (terrace) is completed; fire final okay for perm occupancy 7/1/2004 4:08:08 PM
|
FIRE-Final Inspection | 6/29/2004 | 6/30/2004 | 6/30/2004 | P | NR |
Rick Jackson
|
|
|
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes The fire sprinkler work for the terrace is not ready 6/30/2004 2:29:26 PM
|
BLD-Final | 6/29/2004 | 6/30/2004 | 6/30/2004 | P | NR |
Dave Hannah
|
|
|
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Code Occupancy Approval | | | 6/29/2004 | | PASS |
|
|
|
OK SO SIGNED OFF FINAL, ONLY QUESTION WAS COLOR OF UNPAINED BRICKS, THEY ARE GOING TO CLEAN PAINT OFF AND GO NATURAL BRICKS SOON, FINAL SIGNED OFF
|
BLD-Conference | 6/14/2004 | 6/14/2004 | 6/14/2004 | P | DONE |
Dave Hannah
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Conference | 6/14/2004 | 6/14/2004 | 6/14/2004 | P | PART |
Rick Jackson
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Met with GC about sprinkler requirements for new bar 6/14/2004 3:15:58 PM
|
Temporary occupancy | | | 6/4/2004 | | DONE |
|
|
|
Temp. Occ. cert. # 5118 issued 6-4-04 to the Reef Restaurant.
|
BLD-Final | 6/3/2004 | 6/3/2004 | 6/3/2004 | P | PART |
Dave Hannah
|
|
|
###-#### kent ok for temp occ owner will open the int part and work on the outside area int still needs ada signage at rest rooms 6/3/2004 4:03:14 PM
|
FIRE-Final Inspection | 6/3/2004 | 6/3/2004 | 6/3/2004 | P | PART |
Rick Jackson
|
|
|
Phase I completed - the terrace isn't ready to occupy but the rest of the area is okay to occupy 6/3/2004 4:28:16 PM
|
BLD-Conference | 6/1/2004 | 6/2/2004 | 6/2/2004 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Conference | 6/2/2004 | 6/2/2004 | 6/2/2004 | P | DONE |
Dave Hannah
|
|
|
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Conference | 6/2/2004 | 6/2/2004 | 6/2/2004 | P | CANC |
Rick Jackson
|
|
|
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes inspection scheduled for 6/3 6/2/2004 1:26:18 PM
|
BLD-Conference | 6/1/2004 | 6/1/2004 | 6/1/2004 | P | CANC |
Dave Hannah
|
|
|
Kent; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Conference | 5/13/2004 | 5/13/2004 | 5/13/2004 | A | PART |
Rick Jackson
|
|
|
Met with Kent and left correction notice concerning the bamboo and thatch canopies. After conferring with Carl Westphall, Sam Rogers, Dave Miller and Dave Hannah the Fire Stop fire retardant is approved with the following requirements: the thatch must be immersed for treatment, a special inspector shall be obtained after presenting credentials to plan review for approval to observe the materials are treated per manufacturer's instruction and a test of treated materials will conducted with the inspectors present to verify it meets the criteria specified by Fire Stop; open flames are not permitted 5/13/2004 12:47:51 PM
|
FIRE-Conference | 5/4/2004 | 5/5/2004 | 5/5/2004 | A | PART |
Rick Jackson
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Met with Kent about the bamboo and thatch canopies that were being installed; they weren't shown on the approved plans; left correction notice to provide flame spread and smoke development and if fire treated to provide certification from manufacturer of fire treatment 5/5/2004 2:14:18 PM
|
BLD-Conference | 4/28/2004 | 4/29/2004 | 4/29/2004 | P | DONE |
Dave Hannah
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIRE-Sprinkler Rough-in | 4/15/2004 | 4/16/2004 | 4/16/2004 | A | PART |
Rick Jackson
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Combustible cavity under stage area has been filled with insulation 4/16/2004 10:48:15 AM
|
BLD-Conference | 4/15/2004 | 4/15/2004 | 4/15/2004 | P | DONE |
Dave Hannah
|
|
|
kent; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
FIRE-Conference | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/6/2004 at 10:03:09 AM. Met with electrical GC and Larry Rose; a new fire alarm panel will be installed with submitals; the kitchen extinguishing system will require monitoring by new panel 4/7/2004 3:04:26 PM
|
BLD-Framing/Rough-in | 3/16/2004 | 3/17/2004 | 3/17/2004 | A | PART |
Dave Hannah
|
|
|
KENT; Phone #: ###-#### Internet Inspection Request from: Darla Downs kitchen and food prep area ok to cover steel stud walls after elec and plb r/is 3/18/2004 8:10:14 AM
|
Routing Off Site - STRUCTURAL | 3/12/2004 | | 3/17/2004 | | PASS |
|
|
|
Design approved by the Consultant Engineer.
|
Print Occupancy Form | | | 3/12/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/12/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/12/2004 | | DONE |
|
|
|
permit ready and fee due
|
Issue PAID IN FULL permit | | | 3/12/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/12/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/2/2004 | | 3/12/2004 | | PASS |
|
|
|
(3-5-04) Reviewed resubmitted drawings and sent the engineering packet to the consultant engineer. Waiting for the results of the consultant engineer's resubmittal review. All other items were resolve. (3-9-04) Consultant engineer completed 2nd review. Some items still need resolution. (3-12-04) The 3rd structural resubmittal was a "deferred review" and approval was delayed until reviewed and approved by the consultant engineer. Otherwise the drawings were approved. (3-17-04) Design approved by the Consultant Engineer.
|
Plan assigned to (CJW) | 1/13/2004 | | 3/11/2004 | | PASS |
Carl Westfall
|
|
|
3/11/2004 18:36:31 CJW - activity updated through activity BLDA022 from case BLD04-00038.
|
Plan resubmittals received | | | 3/11/2004 | | DONE |
|
|
|
Received letter of transmittal with response letter, two copies of supplemental structural calculations. taken to Carl W.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2004 | | PASS |
|
|
|
The resolution of the unresolved structural issues were deffered to a later date.
|
Routing Off Site - STRUCTURAL | 3/5/2004 | | 3/9/2004 | | FAIL |
|
|
|
Sent resubmittals to outside engineering via PDQ.
|
Routing - PLUMBING | 2/27/2004 | | 3/2/2004 | | PASS |
|
|
|
additional cross connection protection may be required, if an automatic soap dispensor is installed at the mop sink, provide a water supply for it. per plans and 2000 upc.
|
Plan resubmittals received | | | 2/27/2004 | | DONE |
|
|
|
Received a letter of transmittal, two page letter from Glancey Rockwell,revised certificate of value, two page letter regarding structural responses,two copies of supplimental structural calculations. three sets of A-0.1,A-1.1,A-1.2,A-1.3,A-1.4,A-2.1,A-2.2,A-4.1,A-6.1,A-6.2,A-6.3,S1.0,S2.0,S2.1,S3.0,S3.1, taken to Carl W.
|
Routing - PUBLIC WORKS | 2/26/2004 | | 2/27/2004 | | PASS |
|
|
|
|
Routing - FIRE | 2/19/2004 | | 2/25/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/20/2004 | | 2/19/2004 | | |
|
|
|
Failed first IBC plan review. IBC plan review started February 7, 2004 and was finished February 19, 2004. A response from the architect and engineer was required. See the plan review report. A copy was E-mailed to the architect's representative.
|
Routing Off Site - STRUCTURAL | 1/30/2004 | | 2/10/2004 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. KMM
Failed first review by structural consultant. CJW
|
Plan resubmittals received | | | 1/22/2004 | | DONE |
|
|
|
Received letter of transmittal, three copies of multiple fixture sizing suggestions,three sets of sheets P-2.1 taken to Carl W.
|
Routing - PUBLIC WORKS | 1/14/2004 | | 1/15/2004 | | |
|
|
|
Failed first review.
Old grease trap must upgrade to electro/med
D/W area pre rinse sink must route to grease abatement equipment.
Satay Bar - major cook area adjacent sinks must route to grease line.
|
Routing - PLANNING | 1/15/2004 | | 1/15/2004 | | DONE |
|
|
|
Jeff Neberman DRH03-00224
|
Routing - Erosion and Sediment | 1/14/2004 | | 1/14/2004 | | PASS |
|
|
|
Received ESC plan and RP. kmm\\passed for Demo bld03-00048
|
Routing - PUBLIC WORKS | 1/13/2004 | | 1/14/2004 | | DONE |
|
|
|
Took plans from PW to route to ESC for demo. kmm
|
Application received | | | 1/12/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/12/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/12/2004 | | DONE |
|
|
|
|
Routing - PLUMBING | 1/20/2004 | | 1/20/2003 | | DONE |
|
|
|
no review, pw is requireing that the drainage plans be redrawn, review after pw is happy with design.
|
Fee Review-notes | 1/12/2004 | 1/12/2004 | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/12/2004 | | | | |
|
|
|
Send supplimental engineering to Stapley for review. 3-12-04 Called PDQ for pickup.rad
|