(F) Reprint permit | | | 12/28/2009 | | DONE |
|
|
|
|
BLD-Final | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PASS |
Troy James
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
plexi glass installed at interior stairway guardrail because stairs are non compliant. 9/24/2004 4:00:21 PM
|
BLD-Grading Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 | | BOND |
|
|
|
grading conditionally approved contractor has submitted bond for incomplete grading///9/24/04 per Terry Records BAS
|
DOC - Permit Finaled | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 9/24/2004 3:15:28 PM
|
BLD-Final | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | FAIL |
Troy James
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smyli
Stair guards not approved as ladder type system. Need handrail upper section of stair to second level. Need handrail to stairs to basement and risers to be enclosed. Need landing at rear exiting. Verify smoke detector at basement. Need steps at basement from garage and handrail. Need sign off from Terry Records. Need handrail to front steps. 9/22/2004 10:01:12 AM
|
BLD-Energy code compliance | 8/16/2004 | 8/16/2004 | 8/16/2004 | P | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to cover basement 8/16/2004 3:11:27 PM
|
BLD-Framing/Rough-in | 7/15/2004 | 7/16/2004 | 7/16/2004 | A | PART |
Troy James
|
|
|
Michael; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Ok to sheetrock main level and second level only. Do not cover basement. Need to insulate basement walls and need to insulate stairway walls to basement. 7/16/2004 10:32:09 AM 7/16/2004 10:32:47 AM
|
BLD-Framing/Rough-in | 7/13/2004 | 7/13/2004 | 7/13/2004 | P | FAIL |
Troy James
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Need hanger at jack truss ridge and strap top plates in garage to house. Need connection to post to base at south patio. ok to insulate 7/13/2004 2:48:53 PM
|
BLD-Foundation | 3/9/2004 | 3/10/2004 | 3/10/2004 | A | PART |
Troy James
|
|
|
###-#### Mark
ok to place concrete to garage stem walls. 3/10/2004 9:41:58 AM
|
Case Summary (BLD) | | | 3/9/2004 | | |
|
|
|
|
(F) Reprint permit | | | 3/9/2004 | | DONE |
|
|
|
|
BLD-Foundation | 3/1/2004 | 3/2/2004 | 3/2/2004 | P | PASS |
Dave Hannah
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 2/25/2004 | 2/26/2004 | 2/26/2004 | P | PASS |
Dave Hannah
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Concrete | 2/13/2004 | 2/17/2004 | 2/17/2004 | A | PART |
Dave Hannah
|
|
|
MARK; Phone #: ###-#### Internet Inspection Request from: Darla Downs retainning and basement stair walls ok to pour 2/17/2004 8:58:48 AM
|
BLD-Concrete | 2/10/2004 | 2/11/2004 | 2/11/2004 | P | PART |
Dave Hannah
|
|
|
mark ; Phone #: ###-#### Internet Inspection Request from: Annette Moore retainning wall ftg and stair wellftg ok to pour 2/11/2004 2:51:53 PM
|
Routing - Erosion and Sediment | 1/26/2004 | | 1/26/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/26/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/26/2004 | | DONE |
|
|
|
spoke with Mark -- permit is ready.
|
Issue PAID IN FULL permit | | | 1/26/2004 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 1/12/2004 | | 1/23/2004 | | PASS |
Perry Paine
|
|
|
1/23/2004 13:37:38 PEP - activity updated through activity BLDA022 from case BLD04-00043.
|
Plan Review Report | | | 1/23/2004 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/23/2004 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 1/23/2004 | | DONE |
|
|
|
need responsible person per James Rogers
|
Plan Reviewer's activity | | | 1/21/2004 | | |
|
|
|
PLAN APPROVAL PENDING RESUBMITTALS FROM OWNER/DESIGNER FOR ENERGY CODE AND BASEMENT EGRESS REQUIREMENTS.
|
Routing - PUBLIC WORKS GRADING | 1/12/2004 | | 1/14/2004 | | PASS |
Rita DeYoung
|
|
|
APPROVED WITH CONDITIONS OF APPROVAL IN LETTER FROM BOISE PUBLIC WORKS ATTACHED TO THE PLANS. to terry records for review
|
Routing - Erosion and Sediment | 1/12/2004 | | 1/13/2004 | | FAIL |
|
|
|
to james rogers for review. Waiver request for Responsible Person not approved. A RP will be required for this job.
|
Application received | | | 1/12/2004 | | |
|
|
|
|