Permit Information
Permit NumberBLD04-00046
StatusFinaled
Name R & S CONSTRUCTORS
Site Address 137 N BENJAMIN LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(BOISE HOT ROD PERFORMANCE PARTS) This building is fully sprinklered for allowable area increase. To establish a "letter of compliance" for "Vanilla finish" future tenant & upgrade restroom for accessiblity compliance. To establish a 3,088 sq. ft. tenant space for retail sales, display and installation of sold accessories to include window tinting installation, all per approved plans. Per tenant declaration this space will not be a used as a repair garage as defined in 2000 IBC. Work includes selective demolition and new wall construction to enlarge an existing restroom to provide two fully accessible facilities. Existing doors in north wall of common tenant wall will have hardware removed and the doors secured in the closed position with paneling over the doors to look like the walls. The required exits are existing and will be maintained for code compliance as to hardware, exit signs and exit egress illumination. PC04-338/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  7/26/2004 DONE
Ron Hill has met with contractor and tenant wanting to occupy this area covered under this BLD and an additional 1600 sq. ft. all done under MIS04-00189. See file for plan and notes of approval per inspection, fire & plan review. This scope of work ( restroom upgrade) under this permit received an L/C and the MIS permit was approved in the field and received the C.O. for "Wynn's Mill End Fabric, Inc." as the tenant.
Letter of compliance  7/26/2004 DONE
Letter of Compliance issued 7-26-04.
BLD-Final7/23/20047/23/20047/23/2004PPASS
DetailsTom Arcoraci
kevin ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles, late afternoon if possible please. he has been trying to get ahold the inspector. thanks.
FIRE-Final Inspection7/21/20047/21/20047/21/2004PFAIL
DetailsTroy Cobbley
Project is actually called Wynn's Mill End Fabric. Provide verification to Bill Alexander that the sprinkler system can meet the requirements for the commodities stored. Resubmittals shall meet the requirements of IFC chapter 23. Provide approved door hardware on the second front entry/exit door. Provide sticker as discussed on the main entry/exit with keyed hardware. 7/21/2004 2:03:17 PM
BLD-Final7/21/20047/21/20047/21/2004PCANC
DetailsJim Storey
kevin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in7/9/20047/12/20047/12/2004APASS
DetailsTom Arcoraci
Kevin; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes tennant change in plan reveiw ok to cover 7/12/2004 10:25:26 AM
Case Summary (BLD)  7/7/2004  
CHANGE STATUS TO (ISS)  7/7/2004 DONE
Case Summary (BLD)  7/6/2004  
Permit Ready to Issue  6/21/2004 DONE
Telephone call  6/21/2004 DONE
permit ready and fee due
Receive PAYMENT IN FULL PRINT  6/21/2004 DONE
Inspection Record Card- Bld  6/18/2004 DONE
Print Occupancy Form  6/18/2004 DONE
Routing - PLAN CHECK6/16/2004 6/17/2004 PASS
Approved as noted on and attached plan review conditions.
PLANS/APPL TAKEN TO FRONT DESK  6/17/2004 PASS
To permit desk to issue.
Plan assigned to (DRS)6/2/2004 6/17/2004 PASS
DetailsDan Stuart
6/17/2004 13:16:46 DRS - activity updated through activity BLDA022 from case BLD04-00046.
Plan Review Completed(1st rev)  6/15/2004 PASS
No resubmittals required.
Routing - FIRE6/10/2004 6/15/2004 PASS
Routing - PLAN CHECK6/2/2004 6/10/2004 PEND
ROUTING TO FIRE DEPARTMENT FOR REVIEW.
Telephone call  6/10/2004 DONE
Plan resubmittals requested  6/10/2004 DONE
TIM PERRY IS NO LONGER THE ARCHITECT FOR THIS PROJECT AND RAINBOW PLAY SYSTEMS IS NO LONGER THE TENANT. RESUBMITTALS NOT REQUIRED. Previous tenant Rainbow systems for whom Mr. Perry was working has moved from this location to 64 N. Cole under a new permit. Plans for new tenant Boise Hot Rod Performance Parts have been prepared by Jason Tomlinson and stamped by Douglas Gibson.
Telephone call  6/9/2004 DONE
Call to Jason Tomlinson, architect to discuss the proposed occupancy use for this tenant space. Left voice message on phone to call me back.
Telephone call  6/9/2004 DONE
Jason called me back. I ask him concerning the designated occupancy use groups and the tenant. He had understood there was an existing tenant, Rainbow Play Systems, in the space and the restroom upgrade would get them into code compliance for a C.O. I told Jason that the application provided with the plan submittal indicated a new tenant called Crank & Chrome and that the Rainbow Play systems had vacated the space and moved to 64 N. Cole in March of this year. There shouldn't be a tenant in the space.
I had talked with Jim Phillips & Phil Shari of Crank & Chrome, currently at 722 N. Orchard, concerning this tenant site and occupancy use. I had been told that the proposed tenant would like to perform major repair service ( engine rebuild, parts replacement, installation of racing & performance Parts) / application of window tinting / & Sales/Display. Jason called John Walsh for a conference call concerning the project. This permit will be for the restroom upgrade only, NO TENANT or OCCUPANCY UNDER THIS PERMIT. Separate plans will be provided for the proposed tenant based on final considerations by all parties involved.
Telephone call  6/9/2004 DONE
PHONE CONVERSATION WITH JIM PHILLIPS CONCERNING WORK TO BE DONE AT SITE BASED ON A DISCUSSION HE HAD WITH BUILDING OWNER, JOHN WALSH. THIS FACILITY WILL DISPLAY ACCESSORY PART FOR VEHICLES AND SELL THE SAME, i.e. WINDOW TINTING, INSTALLATION OF RUNNING BOARDS, THINGS YOU CAN BOLT ON AS HE DESCRIBED IT. ALL REPAIR WORK AS DEFINED BY IBC & IFC WILL BE PERFORMED AT EXISTING REPAIR GARAGE OPERATED BY HIS HOUSE. HE IS SENDING ME A LETTER TO THIS EFFECT.
Print Occupancy Form  6/2/2004 CANC
Permit Ready to Issue  6/2/2004 CANC
Telephone call  6/2/2004 DONE
permit ready and fee due
Issue PAID IN FULL permit  6/2/2004 DONE
CHANGE STATUS TO (PND)  6/2/2004 DONE
Dan and I voided permit bld04-01140, because the wrong permit was issued, the Rainbow playsystems relocation to 64 n cole. The plan review fees was only collected ont the new permit (1140) so I moved the information from bld04-00046 to bld04-01140 and voided 1140, value will be more on 00046 for the new review and will be treated as a new permit.
Plan resubmittals received  6/2/2004 DONE
COMPLETE PLAN RESUBMITTED WITH NEW ARCHITECT AND NEW TENANT. This will be same and first time review. Sheet A1 received and forwarded to Dan Stuart.
Application received  5/25/2004  
Recd Pcfee & Taken To Pln CK  5/25/2004  
Routing - FIRE1/22/2004 1/28/2004 DONE
Under this permit number, plans had been previously submitted by Rainbow Play System for this tenant space as an existing illegal tenant. Corrections were required from the building dept. plan review. Resubmittals from the original architect, Mr. Perry of BRS, were never provided. Rainbow Play Systems moved to 64 N. Cole Road and a new proposed tenant has submitted plans for occupancy. These plans were presented 5/25/04 and are being recirculated for plan review by all original reviewing agencies.
Routing - PLAN CHECK6/10/2004 1/22/2004  
Routing - PUBLIC WORKS1/15/2004 1/21/2004 PASS
Plans ACCEPTED BY PLAN TECH  1/13/2004 PASS
per Dan S.
Fee Review-notes5/25/20045/25/2004