Case Summary (BLD) | | | 2/23/2016 | | DONE |
|
|
|
|
Second Notice BLD | 9/22/2008 | 9/22/2008 | 10/3/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 9/9/2008 | 9/9/2008 | 9/22/2008 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/7/2008 | 7/7/2008 | 7/8/2008 | | PART |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/26/2008 | 2/27/2008 | 2/28/2008 | A | PASS |
Forrest France
|
|
|
Correction notice items are complete, fire life safety finaled.
|
BLD-Aging Inspection | 2/1/2008 | 2/1/2008 | 2/1/2008 | | DEFR |
Dave Hannah
|
|
|
sent to fire
|
FIRE-Final Inspection | 11/30/2007 | 11/30/2007 | 12/4/2007 | P | FAIL |
Forrest France
|
|
|
Need to verify functional EM lighting.
|
FIRE-Final Inspection | 10/1/2007 | 10/2/2007 | 10/3/2007 | A | NR |
Forrest France
|
|
|
Need project related fire sprinkler permit finals.
|
BLD-Aging Inspection | 8/16/2007 | 8/16/2007 | 8/20/2007 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 | A | DONE |
Forrest France
|
|
|
wip, final pending alarm and sprinkler permit finals.
|
BLD-Aging Inspection | 11/18/2005 | 11/18/2005 | 11/18/2005 | | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | DONE |
Troy Cobbley
|
|
|
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
|
FIRE-Conference | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 2:01:32 PM. Contact: ###-####. expansion jiont fire stop at elevators ok to cover 2/22/2005 1:22:16 PM
|
BLD-Framing/Rough-in | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 9:14:16 AM. Contact: ###-####. fire damper 6th floor ok and soffit main lobby area 1st floor 2/9/2005 7:51:39 AM
|
BLD-Framing/Rough-in | 2/4/2005 | 2/4/2005 | 2/4/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 9:20:40 AM. Contact: ###-####. nain floor lobby and elev lobby ok to cover cieling also ok to cover elev front walls every floor 2/4/2005 3:55:47 PM
|
BLD-Framing/Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 4:23:02 PM. Contact: ###-####. stair tower idaho street side first layer shafthwall repair ok 2thru 6th floor ok to cover 2/2/2005 10:52:58 AM
|
BLD-Framing/Rough-in | 1/20/2005 | 1/20/2005 | 1/20/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 9:40:01 AM. Contact: ###-####. mec shaft patches ok first side 1/20/2005 3:16:12 PM
|
BLD-Conference | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 3:20:16 PM. Contact: ###-####.elevator shaft problems arct will reveiw and submit drawnings 1/18/2005 2:38:50 PM
|
BLD-Conference | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Dave Hannah
|
|
|
? about fill infront of entryway 12/3/2004 8:22:13 AM
|
BLD-Framing/Rough-in | 10/11/2004 | 10/12/2004 | 10/12/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 2:10:19 PM. Contact: ###-####. ext walla steel studs 1st, 2nd and 3rd floors ok to cover ext 10/12/2004 10:54:31 AM
|
BLD-Conference | 9/20/2004 | 9/21/2004 | 9/21/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/20/2004 at 2:24:48 PM. Contact: ###-####. 2hr fire rating at floor lines around out side of bld 9/21/2004 10:18:24 AM
|
BLD-Framing/Rough-in | 9/3/2004 | 9/3/2004 | 9/3/2004 | P | PART |
Dave Hannah
|
|
|
|
BLD-Concrete | 8/9/2004 | 8/9/2004 | 8/9/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/9/2004 at 10:56:51 AM. Contact: ###-####.
|
BLD-Foundation | 7/9/2004 | 7/9/2004 | 7/9/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/9/2004 at 10:31:07 AM. Contact: ###-####. mti on site 7/9/2004 4:03:16 PM
|
BLD-Footing | 6/30/2004 | 6/30/2004 | 6/30/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/30/2004 at 10:17:12 AM. Contact: ###-####.
|
BLD-Foundation | 6/23/2004 | 6/24/2004 | 6/24/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/23/2004 at 3:10:06 PM. Contact: ###-####.
|
BLD-Footing | 6/16/2004 | 6/16/2004 | 6/16/2004 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/16/2004 at 10:17:56 AM. Contact: ###-####.
|
BLD-Conference | 6/9/2004 | 6/10/2004 | 6/10/2004 | A | DONE |
Dave Hannah
|
|
|
pre job meeting at 9:00am at office on 9th st
|
BLD-Conference | 6/3/2004 | 6/4/2004 | 6/4/2004 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/3/2004 at 9:08:50 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 5/6/2004 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 1/21/2004 | | 5/3/2004 | | PASS |
John Menard
|
|
|
5/3/2004 13:35:38 JCM - activity updated through activity BLDA022 from case BLD04-00079.
|
Routing - PLANNING | 4/29/2004 | | 5/3/2004 | | PASS |
|
|
|
Approved per DRH03-230.
|
Routing - PLAN CHECK | 5/3/2004 | | 5/3/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/3/2004 | | 5/3/2004 | | PASS |
|
|
|
Lots have combined into one parcel.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/3/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/3/2004 | | |
|
|
|
|
Telephone call | | | 5/3/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 4/19/2004 | | 4/29/2004 | | |
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2004 | | 4/19/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/18/2004 | | 4/14/2004 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/26/2004 | | PASS |
|
|
|
Agreed to address the need for standby power for the required accessible means of egress elevator during the first tenant improvement. JCM
|
Routing - Erosion and Sediment | 3/12/2004 | | 3/18/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing Off Site - STRUCTURAL | 3/4/2004 | | 3/17/2004 | | PASS |
|
|
|
contacted PDQ to take revised structural sheets of 3/3/04 to outside engineering. kmm Received fax from consulting structural engineer approving resubmittals. JCM
|
Routing - PLAN CHECK | 2/19/2004 | | 3/12/2004 | | |
|
|
|
|
Plan resubmittals requested | | | 3/12/2004 | | |
|
|
|
E-mailed the architect requesting additional resubmittals. JCM
|
Plan Reviewer's activity | | | 3/12/2004 | | FAIL |
|
|
|
Reviewed resubmitted plans and attachements and there is still one item that needs to be resolved. JCM
|
Plan resubmittals received | | | 3/10/2004 | | DONE |
|
|
|
Received one copy of soils report. Routed to John M. kmm
|
Plan resubmittals received | | | 3/8/2004 | | DONE |
|
|
|
Received letter of transmittal, two copies of esc plan with two copies of narrative and one copy of sheets S1.1,S2.1,S2.2,S2.3,S3.1,S3.2,S4.1,S4.2,S4.3,S4.4,S6.1 all taken to John M.
|
Plan resubmittals received | | | 3/3/2004 | | DONE |
|
|
|
Received letter of transmittal, four page response, one copy of spec seal firestop mortar, one Product data sheet, response letter, two copies of supplementary structural Calculations, two copies of sheets A2.0,A2.1,A2.2,A2.3,A3.0,A4.0,A4.1,A5.0,A5.1,A6.1,A6.3,A8.0, E.01,E.08,S1.1,S2.1,S2.2,S2.3,S3.1,S3.2,S4.1,S4.2,S4.3,S4.4,S6.1, taken to John M.
|
Routing - FIRE | 2/11/2004 | | 2/19/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 2/19/2004 | | FAIL |
|
|
|
Failed all departments except Fire.
|
Plan resubmittals requested | | | 2/11/2004 | | |
|
|
|
E-mailed the architect a copy of the cover letter and plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 2/4/2004 | | 2/11/2004 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 2/5/2004 | | |
|
|
|
Faxed the architect a copy of the review comments from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 1/30/2004 | | 2/4/2004 | | FAIL |
|
|
|
DRH###-####0 approval not completed.
|
Routing Off Site - STRUCTURAL | 1/21/2004 | | 2/2/2004 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 1/29/2004 | | 1/30/2004 | | FAIL |
|
|
|
ESC does not meet requirements of BCC8-17 or Appendix C of Plan Designer Manual.
Notified Plan Designer.
|
Routing - PUBLIC WORKS | 1/23/2004 | | 1/29/2004 | | FAIL |
|
|
|
Requires Drainage plan per Brian Murphy. kmm
|
Routing - PLANNING Land Div | 1/21/2004 | | 1/23/2004 | | FAIL |
|
|
|
Need new recorded deed describing both parcels as one and new tax parcel number. Called Kirk Morris of Cole and Associates on January 23, 2004.
|
Plans ACCEPTED BY PLAN TECH | | | 1/21/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/21/2004 | | DONE |
|
|
|
|
Application received | | | 1/20/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/20/2004 | | |
|
|
|
|
Fee Review-notes | 1/20/2004 | 1/20/2004 | | | |
|
|
|
|