Second Notice BLD | 1/9/2008 | 1/9/2008 | 1/10/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/28/2007 | 1/9/2008 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 11/28/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/28/2007 | | DONE |
|
|
|
|
BLD-Final | 11/26/2007 | 11/26/2007 | 11/26/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/26/2007 at 10:46:13 AM. Contact: ###-####.
|
Code Occupancy Approval | 11/26/2007 | 11/26/2007 | 11/26/2007 | P | PASS |
Dena Gambrel
|
|
|
|
FIRE-Final Inspection | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 11/12/2007 | 11/13/2007 | 11/13/2007 | A | FAIL |
Troy Cobbley
|
|
|
Repair the exit sign at the main exit/entrance and provide verification that a operational permit is not required for the oil distribution system as per the approved drawings/notes.
|
BLD-Aging Inspection | 9/25/2007 | 9/25/2007 | 9/25/2007 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/24/2007 | 7/25/2007 | 7/25/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/24/2007 at 10:10:31 AM. Contact: (208) grid ok
|
BLD-Aging Inspection | 7/18/2007 | 7/18/2007 | 7/18/2007 | | CANC |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/14/2007 | 5/14/2007 | 5/14/2007 | | PASS |
Tom Arcoraci
|
|
|
very slow
|
Print Occupancy Form | | | 3/22/2007 | | DONE |
|
|
|
|
BLD-Aging Inspection | 3/12/2007 | 3/12/2007 | 3/12/2007 | | PASS |
Tom Arcoraci
|
|
|
wip
|
BLD-Aging Inspection | 1/8/2007 | 1/8/2007 | 1/8/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/8/2006 | 11/8/2006 | 11/8/2006 | | NR |
Tom Arcoraci
|
|
|
|
Plan resubmittals received | | | 10/13/2006 | | |
|
|
|
received resubmittal for fire / sent to fire
|
BLD-Aging Inspection | 9/6/2006 | 9/6/2006 | 9/6/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/7/2006 | 7/7/2006 | 7/7/2006 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/27/2006 | 3/27/2006 | 3/27/2006 | | PASS |
Tom Arcoraci
|
|
|
wip
|
BLD-Aging Inspection | 1/23/2006 | 1/23/2006 | 1/23/2006 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 11/21/2005 | 11/22/2005 | 11/22/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/21/2005 at 1:24:39 PM. Contact: ###-####. 5/8 rock at exterior side of West wall OK..... OK to cover walls at waiting and office area.
|
BLD-Aging Inspection | 11/8/2005 | 11/8/2005 | 11/8/2005 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/8/2005 | 9/8/2005 | 9/8/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Conference | 6/29/2005 | 6/29/2005 | 6/29/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/29/2005 at 9:21:27 AM. Contact: ###-####. wip ok
|
BLD-Aging Inspection | 5/26/2005 | 5/26/2005 | 5/26/2005 | | PASS |
Tom Arcoraci
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/10/2005 | | DONE |
|
|
|
plan mod changed status
|
(F) Reprint permit | | | 3/10/2005 | | |
|
|
|
|
Plan assigned to (CJW) | 2/28/2005 | 2/28/2005 | 3/8/2005 | | PASS |
|
|
|
3/8/2005 14:25:03 CJW - activity updated through activity BLDA022 from case BLD04-00084.
|
Routing - PLAN CHECK | 2/28/2005 | | 3/8/2005 | | PASS |
|
|
|
Plan modification completed. Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/8/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/8/2005 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2005 | | DONE |
|
|
|
left mess for mark sander at ###-#### is ready
|
Plan Modification Accepted | | | 2/28/2005 | | DONE |
|
|
|
Plan modification excepted for revised 2-hour wall between office & service area/service drive to non-rated. Delete ramps in office area as floor level has been lowered to be the same level through out the office. Sheets that have been revised A2.2,A4.0,A4.1,A4.2,A6.0,A9.0
|
BLD-Conference | 2/22/2005 | 2/25/2005 | 2/25/2005 | P | PASS |
Tom Arcoraci
|
|
|
mark ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
(F) Reprint permit | | | 2/25/2005 | | |
|
|
|
|
BLD-Conference | 2/18/2005 | 2/23/2005 | 2/23/2005 | P | CANC |
Tom Arcoraci
|
|
|
ext #3 please call at least a half hour prior to inspection mark sanders; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Plan Reviewer's activity | | | 2/18/2005 | | DONE |
|
|
|
Received a request for an alternate (eliminate the fire barrier between the repair garage and the offices that serve the repair garage) and forwarded it on to Jenifer Gilliland.
|
BLD-Framing/Rough-in | 12/13/2004 | 12/13/2004 | 12/13/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/13/2004 at 9:57:59 AM. ok to partial drywall areas where no rough ins 12/13/2004 3:31:30 PM
|
BLD-Framing/Rough-in | 11/5/2004 | 11/5/2004 | 11/5/2004 | P | PART |
Tom Arcoraci
|
|
|
roof framing inspection please////gary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok 11/5/2004 3:11:08 PM
|
BLD-Framing/Rough-in | 10/28/2004 | 10/29/2004 | 10/29/2004 | A | PART |
Tom Arcoraci
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to stand 2 hr wall 10/29/2004 10:51:38 AM
|
Plan resubmittals received | | | 10/1/2004 | | DONE |
|
|
|
|
BLD-Footing | 8/25/2004 | 8/25/2004 | 8/25/2004 | P | PASS |
Lane Manuel
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Annette Moore
7 piers ok per engin. design 8/25/2004 3:27:53 PM
|
BLD-Aging Inspection | 6/30/2004 | 6/30/2004 | 6/30/2004 | | NR |
Tom Arcoraci
|
|
|
|
Routing - FIRE | 3/31/2004 | | 3/31/2004 | | DONE |
|
|
|
plans approved per acceptable Haz Mat information resubmitted.
|
Routing - PLAN CHECK | 3/31/2004 | | 3/31/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/31/2004 | | DONE |
|
|
|
|
OVERRIDE | | | 3/31/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 3/31/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/31/2004 | | DONE |
|
|
|
permit ready and fee due
|
Issue PAID IN FULL permit | | | 3/31/2004 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/23/2004 | | 3/31/2004 | | PASS |
Carl Westfall
|
|
|
3/31/2004 08:54:19 CJW - activity updated through activity BLDA022 from case BLD04-00084.
|
Plan resubmittals received | | | 3/23/2004 | | DONE |
|
|
|
Received a three ring binder for Sam Rogers. Taken to Sam
|
Plan resubmittals received | | | 3/23/2004 | | DONE |
|
|
|
Haz Mat info resubmitted
|
Routing - FIRE | 3/11/2004 | | 3/12/2004 | | |
|
|
|
Failed second IFC plan review. required Haz Mat info has not been received. Hold for additional infor to be submitted by owner. Refer to telcon notes of 3/10.
|
Routing - PLAN CHECK | 3/12/2004 | | 3/12/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 3/5/2004 | | 3/11/2004 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 3/10/2004 | | DONE |
|
|
|
Received two copies revised sheets A2.1, A2.2, A2.3, A2.4, A4.0,A6.0, A9.0. One copy of response letter and two copies of struct. calcs. Routed to Carl W. kmm
|
Telephone call | | | 3/10/2004 | | DONE |
|
|
|
Telcon from Owner 's son, Tom Palmer, re Haz Mat report req'ts. Reportedly very limited amounts. Agreed to allow him to fax a list of products and description of use of all Haz Mat's for preliminary review and determination of whether a classification/haz mat report by a Tech Consultant is necessary.
|
Routing - FIRE | 3/3/2004 | | 3/5/2004 | | |
|
|
|
Failed first IFC review. additional info on hazardous materials required; review faxed to architect.
|
Routing - PLAN CHECK | 2/18/2004 | | 3/3/2004 | | |
|
|
|
Failed first IBC plan review. The IBC plan review was started February 27, 2004 and was finished March 3, 2004. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
|
Routing - Erosion and Sediment | 2/23/2004 | | 2/23/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Plan resubmittals received | | | 2/20/2004 | | DONE |
|
|
|
Resubmitted 2 sets of plan sheets ESC1 and the storm water pollution prevention/ESC narrative and forwarded to Carl.
|
Routing - PLANNING | 2/11/2004 | | 2/17/2004 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/9/2004 | | 2/9/2004 | | PASS |
|
|
|
TURN 90 DOWN INTO CATCH BASIN BELOW WATER LINE NO ABS.
|
Routing - PLANNING | 2/6/2004 | | 2/6/2004 | | PASS |
|
|
|
Susan Riggs CUP03-00083
Sarah Schafer DRH03-00201
Re-route to Susan Riggs on 2/12/04 per Susan R. kmm
OK per planning, routing to Sara Schafer for D.R. approval
Ok per DR. Approved per DRH03-201.
|
Plan resubmittals received | | | 2/6/2004 | | DONE |
|
|
|
Received one copy of ESC plan narrative. Routed to Carl Westfall. kmm
|
Routing - Erosion and Sediment | 1/26/2004 | | 2/5/2004 | | |
|
|
|
Failed first review. ESC04-00037. No listed RP. Contacted Plan Designer.
|
Routing - PUBLIC WORKS | 1/23/2004 | | 1/26/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/21/2004 | | DONE |
|
|
|
per Carl Westfall
|
Application received | | | 1/20/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/20/2004 | | |
|
|
|
|
Fee Review-notes | 1/20/2004 | 1/20/2004 | | | |
|
|
|
|