Permit Information
Permit NumberBLD04-00138
StatusFinaled
Name IND SCHOOL DIST OF BOISE CITY
Site Address 6801 N GARY LN
Project Name(School) River Glen Jr.High
Customer Number 
ePlanReviewNo
Description
(River Glen Jr. High School)(Science Room remodel) * Remodel classroom to create another science lab on the second floor of an existing Jr. High School. Work includes new mechanical exhaust system , lab sinks and separate fume hood. Building is fully fire sprinklered and no separations are required for Group E lab. Other work inlcudes new double acting doors across corridor which are not permited to latch or lock. All work per approved plans and attachments. All fire sprinkler work per N.F.P.A. 13 as regulated by the Fire Dept. Fire Sprinklers used for area.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  1/4/2005 DONE
Letter of Compliance issued 1-4-05.
BLD-Final1/3/20051/3/20051/3/2005PPASS
DetailsTony Young
###-####
ok for perm occ. 1/3/2005 4:20:33 PM
BLD-Final12/21/200412/22/200412/22/2004APART
DetailsTony Young
Shawn; Phone #: ###-#### Internet Inspection Request from: Jan Rice
all ok after all fire permits are ok 12/22/2004 9:54:58 AM
BLD-Final10/19/200410/20/200410/20/2004ACANC
DetailsTony Young
Shawn;phone####-####
BLD-Final10/20/200410/20/200410/20/2004PPART
DetailsTony Young
Meet with Shawn, Call 1 hr ahead ###-####
temp. occ. ok until trades are 100% 10/20/2004 1:43:33 PM
Temporary occupancy  10/20/2004 DONE
Temp. Occ. Cert. # 5158 issued 10-20-04 to River Glen Jr. High School.
BLD-Final10/18/200410/19/200410/19/2004ACANC
DetailsTony Young
Please call at least 30 mins prior to inspection//shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need fire sign off 1st 10/19/2004 3:02:16 PM
BLD-Conference10/19/200410/19/200410/19/2004PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave millers permission until the fire sprinkler permit is finaled. Per the signed notice they will have the work completed by January 15, 2005. 10/19/2004 4:12:59 PM
FIRE-Final Inspection9/9/20049/10/20049/10/2004ACANC
DetailsTroy Cobbley
shawn for temp fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Case Summary (BLD)  8/23/2004 DONE
FIRE-Final Inspection8/2/20048/2/20048/2/2004PFAIL
DetailsRick Jackson
Shawn -- building closes at 4:00. ; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Fire/life safety okay; Extended coverage sprinkler heads are used on classrooms - spacing okay; sprinkler heads overspaced at new wall/door in corridor - over 8 ft from new wall 8/2/2004 3:35:31 PM
BLD-Framing/Rough-in6/23/20046/24/20046/24/2004APART
DetailsTony Young
rm 203 please shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
verify braces @ 4' oc on upper wall later,, ok to cover 6/24/2004 10:31:06 AM
Issue PAID IN FULL permit  4/6/2004 DONE
(F) Reprint permit  4/6/2004 DONE
Telephone call  2/27/2004 DONE
talked to scott henson that permit is ready
CHANGE STATUS TO (R)  2/18/2004 DONE
Inspection Record Card- Bld  2/18/2004 DONE
Telephone call  2/18/2004 DONE
called left voise message for scott permit ready & fee given 2-18-04 ///dld 9:30
Plan assigned to (MLO)1/29/20041/29/20042/17/2004 PASS
DetailsMike Otto
2/17/2004 16:14:08 MLO - activity updated through activity BLDA022 from case BLD04-00138.
Routing - PLUMBING2/13/2004 2/17/2004 PASS
plan resubs received on 2-12 after approval.
Routing - PLAN CHECK2/17/2004 2/17/2004 NR
Case Summary (BLD)  2/17/2004  
PLANS/APPL TAKEN TO FRONT DESK  2/17/2004 DONE
Routing - PLAN CHECK2/12/2004 2/12/2004 NR
Plan resubmittals received  2/12/2004 DONE
Received three copies of revised sheets M1.0. Routed to Mike O. kmm
Routing - FIRE2/11/2004 2/11/2004 PASS
Plans approved per resubmitted Haz Mat info received from architect.
Routing - PLUMBING2/11/2004 2/11/2004 PASS
water to dishwasher to be from 105 non-potable, lable all non-potable water per upc 603.4.12.
Routing - PLAN CHECK2/10/2004 2/10/2004 NR
Routing - FIRE2/4/2004 2/9/2004 FAIL
Haz Mat evaluation not acceptable. REsubmittal required. Review faxed to architect.
Plan resubmittals received  2/6/2004 DONE
Received three copies of hazardous materials. Routed to Mike O. kmm
Routing - PLAN CHECK1/30/2004 2/2/2004 PASS
Routing - PLUMBING1/30/2004 1/30/2004 FAIL
pipe all lab water from existing non-potable system, emergency shower water must be from potable system.
Routing - PUBLIC WORKS1/29/2004 1/29/2004 PASS
Plan routing begun/TENANTS  1/29/2004 DONE
Plans ACCEPTED BY PLAN TECH  1/29/2004 DONE
No energy compliance.
Application received  1/28/2004  
Recd Pcfee & Taken To Pln CK  1/28/2004  
Fee Review-notes1/28/20041/28/2004