Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00156
StatusFinaled
Name JOSEPH GUENTHER
Site Address 2505 W IDAHO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"4/20/07 THIS PROJECT IS MODIFIED TO REFLECT THE INSTALLATION OF NEW WINDOWS AND A NEW FRONT PORCH COVER AND DECK. VALUE ADDED $5000 ADDED VALUE. 4/25/07 PEP' "(11/02/2004) To complete 160 sq. ft. 2nd phase of remodel/addition which will include completion of bedroom/bath area. ESC ok to transfer to 2nd phase. Energy review pending. DJO "This project is for the 160s.f. remodel as the first phase af a remodel/ addition project is at this time not conditioned or open to the existing single family dwelling and the energy code does not apply at this time. R317.1.1 is required. Separate electrical permit is required. ESC permit is required and may be transferred to the 2nd phase if 1st is not finalled at the time of the 2nd phase start. R3D ok per le. All per the approved plans as marked and attached plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/12/201112/12/201112/12/2011PPASS
DetailsDave Hannah
Joe Phone #: ###-####
DOC - Permit Finaled12/12/201112/12/201112/12/2011PPASS
DetailsDave Hannah
BLD-Final12/7/201112/8/201112/8/2011AFAIL
DetailsDave Hannah
joe - please call 1/2 hr prior Phone #: ###-#### needs smoke detectors in bedrooms
BLD-Aging Inspection11/24/201111/24/201111/28/2011 PEND
DetailsDave Hannah
Telephone call  11/23/2011 DONE
DetailsTisha Gallop
received phone call from Joseph want to reopen permits; per Bob A. charge 2 hr admin fee on building permit then can reopen bld, ele, plm permit to get final inspections.
Reopen Permit (ISS)  11/23/2011 DONE
DetailsTisha Gallop
per bob A ok to reopen permit, if homeowner pays 2 hr admin fee on building permit
(F) Reprint permit  11/23/2011 DONE
DetailsTisha Gallop
BLD-Conference6/8/20076/8/20076/11/2007PPART
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang front pourch framing ok per parrys plans
(F) Reprint permit  4/26/2007  
Routing Walk-In (Zoning)4/25/20074/25/20074/25/2007APASS
Routing Walk-In (BLD)4/25/20074/25/20074/25/2007ADONE
4/25/2007 11:57:22 PEP - activity updated through activity BLDA022 from case BLD04-00156.
Case Summary (BLD)  4/25/2007  
Inspection Record Card- Bld  4/25/2007  
PLANS/APPL TAKEN TO FRONT DESK  4/25/2007 DONE
(F) Reprint permit  4/25/2007 DONE
CHANGE STATUS TO (ISS)  4/25/2007 DONE
Revised permit to include front porch
BLD-Other1/4/20071/4/20071/5/2007PPART
DetailsDave Hannah
Joseph, please call 1st for access; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to cover bathroom area after all other trades sign off
BLD-Other1/3/20071/4/20071/4/2007ADEFR
DetailsDave Hannah
Joseph, please call 1st for access; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in6/5/20066/6/20066/7/2006PNR
DetailsDave Hannah
jo - call 1/4 hr before insp for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley will reschedule after he gets elec r/i
BLD-Framing/Rough-in10/11/200510/12/200510/12/2005APART
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore back bathroom needs to finish framing and get plumbing permit
Plan assigned to (DJO)11/2/200411/2/200411/2/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/2/2004 DONE
Case Summary (BLD)  11/2/2004 DONE
Inspection Record Card- Bld  11/2/2004 DONE
Receive PAYMENT IN FULL PRINT  11/2/2004  
CHANGE STATUS TO (ISS)  11/2/2004 DONE
dan overy added some changes to this permit had been issued before-now i am changing the status
(F) Reprint permit  11/2/2004 DONE
Case Summary (BLD)  11/2/2004 DONE
Plans ACCEPTED BY PLAN CHECK  11/2/2004 DONE
BLD-Framing/Rough-in9/15/20049/16/20049/16/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/15/2004 at 1:52:15 PM. Contact: ###-####.reviewed wall framing ok to keep going 9/16/2004 8:52:34 AM
BLD-Framing/Rough-in9/9/20049/9/20049/9/2004PPART
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 9/9/2004 3:39:18 PM this was no a frame went over project with joe to help him with framing questions 9/9/2004 3:42:04 PM
BLD-Conference9/3/20049/3/20049/3/2004PDONE
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Foundation4/26/20044/26/20044/26/2004PPART
DetailsDave Hannah
joe- ###-#### entry area 4/26/2004 1:48:45 PM
BLD-Footing3/25/20043/26/20043/26/2004APART
DetailsDave Hannah
je please call for access; Phone #: ###-#### Internet Inspection Request from: Annette Moore back entery area ok to pour ftg 3/26/2004 10:42:14 AM
BLD-Footing3/3/20043/4/20043/4/2004AFAIL
DetailsTroy James
re-insp -CALL 1ST BEFORE INSP FOR ACCESS WORK- JOE ###-####
Need to excavate footing around the perimeter of addition. 3/4/2004 9:26:17 AM
BLD-Footing3/1/20043/2/20043/2/2004AFAIL
DetailsDave Hannah
Jo --- please call first for access. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ph # out of service and no plans on site 3/2/2004 9:49:10 AM
Application received  1/30/2004  
Plan assigned to (PEP)1/30/2004 1/30/2004 PASS
DetailsPerry Paine
1/30/2004 16:16:59 PEP - activity updated through activity BLDA022 from case BLD04-00156.
Plan Review Report  1/30/2004  
Print Pending Permit.LaserJet4  1/30/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/30/2004 DONE
Inspection Record Card- Bld  1/30/2004 DONE
Issue PAID IN FULL permit  1/30/2004 DONE