Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/16/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 9/29/2005 | 9/29/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/16/2005 | 9/29/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/16/2005 | | DONE |
|
|
|
Perm. Occ. Cert. #10731 issued 9-16-05 to Modern Dental.
|
BLD-Aging Inspection | 8/22/2005 | 8/22/2005 | 8/22/2005 | | PASS |
Jim Storey
|
|
|
|
Permanent Occupancy | | 8/22/2005 | 8/22/2005 | | DONE |
|
|
|
|
Temporary occupancy | | | 6/22/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5251 issued 6-22-05 to Modern Dental.
|
BLD-Final | 6/17/2005 | 6/20/2005 | 6/20/2005 | A | PART |
Jim Storey
|
|
|
tim --call 1st before insp --pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie temp ok pending other sign offs.
|
FIRE-Final Inspection | 6/20/2005 | 6/20/2005 | 6/20/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 6/17/2005 | 6/17/2005 | 6/17/2005 | P | FAIL |
Forrest France
|
|
|
Install two emergency lights as shown in main area and reception area, label fire sprinkler backflow device and lock valves open, blank off lock at first set of vestibule doors, label fire lane curbing.
|
BLD-Final | 6/17/2005 | 6/17/2005 | 6/17/2005 | P | CANC |
Jim Storey
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Final | 6/17/2005 | 6/17/2005 | 6/17/2005 | P | CANC |
Jim Storey
|
|
|
tim --call 1st before insp --pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | FAIL |
Forrest France
|
|
|
Remote annunciators for duct smoke detection are not code approved. Remaining life safety issues still need review.
|
BLD-Energy code compliance | 4/18/2005 | 4/18/2005 | 4/18/2005 | P | PASS |
Jim Storey
|
|
|
tim ###-####
|
BLD-Framing/Rough-in | 4/15/2005 | 4/15/2005 | 4/15/2005 | P | NR |
Jim Storey
|
|
|
ceing grid inspection please///tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 3/2/2005 | 3/3/2005 | 3/3/2005 | A | PART |
Troy James
|
|
|
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need verification from plan check that gas storage room does not need to be 1 hr rated construction, also need letter from architect 3/3/2005 11:07:00 AM
|
(F) Reprint permit | | | 2/25/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 2/25/2005 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/11/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2004 | | DONE |
|
|
|
left mess for pat mckeegan that permit is ready--###-####
|
Override - Parcel Holds | | | 10/21/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/21/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/21/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/21/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 10/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/21/2004 | | DONE |
|
|
|
talked to pat mckeegan at ###-#### that permit is ready
|
Plan assigned to (M_P) | 2/3/2004 | 2/3/2004 | 10/18/2004 | | PASS |
Mike Phillips
|
|
|
10/18/2004 16:41:02 M_P - activity updated through activity BLDA022 from case BLD04-00159.
|
Routing - PLAN CHECK | 10/14/2004 | | 10/18/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/18/2004 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/18/2004 | | DONE |
|
|
|
|
Routing - FIRE | 10/12/2004 | | 10/14/2004 | | PASS |
|
|
|
resubmittal accepted with annotations; review faxed to architect for information purposes.
|
Routing - PLAN CHECK | 10/8/2004 | | 10/12/2004 | | |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 10/11/2004 | | DONE |
|
|
|
Received one copy of sheets A1.0,A1.1 taken to Mike P.
|
Routing - PLAN CHECK | 10/4/2004 | | 10/8/2004 | | FAIL |
|
|
|
Called and talked to architect, requested submittal of second set of plans prior to routing to fire and doing my review.
|
Plan resubmittals received | | | 10/8/2004 | | DONE |
|
|
|
Received response letter with one sets of sheets A1.0, A1.1 taken to Mike P.
|
Routing - PLAN CHECK | 9/9/2004 | | 10/4/2004 | | FAIL |
|
|
|
Called architect requested additional information for one-hour gas room. Need fire assembly information and shaft details. Duct wrap will not be approved for a one-hour shaft other than with a grease duct.
|
Plan resubmittals received | | | 10/1/2004 | | DONE |
|
|
|
Received Transmittal Letter, 1 HVAC booklets & 2 copys of A1.0,A1.1,A3.0 Taken to Mike Phillips....
|
Routing - FIRE | 9/3/2004 | | 9/9/2004 | | FAIL |
|
|
|
Plans not revised to show rated shaft and door for med gas room; no quantities of med gas verified. Called architect, he will resubmit this.
|
Routing - PLAN CHECK | 8/30/2004 | | 9/3/2004 | | |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 9/3/2004 | | DONE |
|
|
|
Received 2 Sets of A1.0, 1 Set of A1.1,A2.0,A3.0, 2 Sets of A4.0, P1.0, 1 Set of P1.1,P3.1,M0.0,H1.1,H2.1,H3.1, EN,E1.0,E3.0,E4.0 Taken to Mike Phillips....
|
Routing - PLAN CHECK | 4/26/2004 | | 8/30/2004 | | FAIL |
|
|
|
Called and left message, need two set of plan only one was submitted.
|
Plan resubmittals received | | | 8/29/2004 | | DONE |
|
|
|
Received response letter, product details sheet, response letter from engineer, fire review response, one set of sheets A4.0,A2.0,A4.0,A1.0,A1.1,EN,E1.0,E4.0,H1.1,H2.1,H3.1,P1.0,P1.1,P1.0,P3.1 taken to Mike P.
|
Routing - PLAN CHECK | 3/11/2004 | | 4/26/2004 | | |
|
|
|
|
Routing - PUBLIC WORKS | 4/26/2004 | | 4/26/2004 | | PASS |
|
|
|
|
Routing - FIRE | 3/8/2004 | | 3/11/2004 | | FAIL |
|
|
|
med gas fire separation and sprinklers required and quantity verification. Review comments faxed to architect.
|
Routing - PLAN CHECK | 2/19/2004 | | 3/8/2004 | | FAIL |
|
|
|
PLan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PLAN CHECK | 2/9/2004 | | 2/18/2004 | | |
|
|
|
Routing tp plumbing for follow up review.
|
Routing - PLUMBING | 2/18/2004 | | 2/18/2004 | | PASS |
|
|
|
per plans and 2000 upc and resubmittals dated 2/13/04
|
Plan resubmittals received | | | 2/13/2004 | | DONE |
|
|
|
Received two sets of sheets P1.0,P1.1 taken to Mike P.
|
Routing - PLUMBING | 2/6/2004 | | 2/9/2004 | | FAIL |
|
|
|
MIN. PIPE SIZE FOR MED GAS PIPING IS 1/2" ID, EACH OPERATORY WILL REQUIRE ITS OWN R.P. ON THE WATER SUPPLY MOUNTED OVER A FLOOR SINK. MOUNT MIXING VALVE R.P. OVER A DRAIN THAT WILL ACCEPT FULL DISCHARGE. VERIFY LOCATION OF TANK CLOSET WITH FIRE DEPT. SHOW LOCATIONS OF R.P.s FOR OPERATORIES. EAST COLD WATER BRANCH IS UNDERSIZED.
|
Routing - PUBLIC WORKS | 2/4/2004 | | 2/6/2004 | | FAIL |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/3/2004 | | PASS |
|
|
|
|
Application received | | | 1/30/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/30/2004 | | |
|
|
|
|
Fee Review-notes | 1/30/2004 | 1/30/2004 | | | |
|
|
|
|