Permit Information
Permit NumberBLD04-00160
StatusFinaled
Name STEED CONSTRUCTION
Site Address 2031 E HOSPITALITY CT Unit: 150
Project NameMODERN DENTAL BLDG
Customer Number 
ePlanReviewNo
Description
(RICKS CHIROPRACTIC)(MODERN DENTAL BLDG-STE 150) To finish 1,843 sq.ft. tenant space in a new shell building for a chiropracters office. All construction per the approved plans and attached comment list. Work included in this permit is for two accessible restrooms, associated plumbing, mechanical and electrical which all require separate permits. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/7/200512/7/200512/16/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice 9/16/200512/7/2005 DONE
First Notice 7/12/20059/14/2005 DONE
Permanent Occupancy 8/17/20058/17/2005 DONE
Details
FIRE-Final Inspection6/17/20056/17/20056/17/2005PPASS
DetailsForrest France
Fire life safety finaled.
Permanent occupancy  6/17/2005 DONE
Perm. Occ. Cert. # 10641 issued 6-22-05 to Rick's Chiropractic.
BLD-Final5/17/20055/18/20055/18/2005APART
DetailsJim Storey
tim -pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylietemp ok pending ada on pocket door /restaroom signage/ele perm
FIRE-Final Inspection5/17/20055/18/20055/18/2005APART
DetailsForrest France
Temporary occupancy given with Sam Rogers permission. Final pending installation of approved door hardware on pocket door at file room. Pocket door has been disabled for use until approved hardware is installed.
Temporary occupancy  5/18/2005 DONE
Temp. Occ. Cert. # 5242 issued 5-18-05 to Rick's Chiropractic.
FIRE-Final Inspection5/13/20055/13/20055/13/2005PFAIL
DetailsForrest France
Smoke detectors did not shut down HVAC units upon activation. Post street address. Provide exit disharge light and test. Install fire extiguisher. Provide approved door hardware on pocket door at file room.
BLD-Energy code compliance4/18/20054/18/20054/18/2005PPASS
DetailsJim Storey
tim ###-####
BLD-Framing/Rough-in4/15/20054/15/20054/15/2005PNR
DetailsJim Storey
ceing grid inspection please///tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in3/2/20053/3/20053/3/2005APASS
DetailsTroy James
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
(F) Reprint permit  2/25/2005 DONE
Case Summary (BLD)  2/25/2005 DONE
Inspection Record Card- Bld  1/11/2005 DONE
Print Occupancy Form  1/11/2005 DONE
(F) Reprint permit  1/10/2005 DONE
BLD-Aging Inspection12/20/200412/20/200412/20/2004 PASS
DetailsJim Storey
wip 12/20/2004 8:22:07 AM
Override - Parcel Holds  9/20/2004  
Issue PAID IN FULL permit  9/20/2004 DONE
Print Occupancy Form  9/17/2004 DONE
Override - Parcel Holds  9/17/2004  
Inspection Record Card- Bld  9/17/2004 DONE
Override - Parcel Holds  9/17/2004  
Permit Ready to Issue  9/17/2004 DONE
Telephone call  9/17/2004 DONE
spoke with Steed Construction -- permit is ready.
Plan assigned to (M_P)2/3/20042/3/20049/16/2004 PASS
DetailsMike Phillips
9/16/2004 11:00:37 M_P - activity updated through activity BLDA022 from case BLD04-00160.
Routing - PLAN CHECK9/14/2004 9/16/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/16/2004 DONE
Override - Parcel Holds  9/16/2004  
Print Pending Permit.LaserJet4  9/16/2004 DONE
Case Summary (BLD)  9/16/2004 DONE
Routing - PLAN CHECK8/30/2004 9/14/2004 PEND
Waiting for the shell building plans to be approved, prior to issuing permit.
Routing - PLAN CHECK4/26/2004 8/30/2004 FAIL
Called and left message, two sets of plans are required to be submitted, only one was submitted.
Plan resubmittals received  8/29/2004 DONE
Receivedresponse letter with one sets of sheets A1.0,A3.0,M0.0,E3.0, taken to Mike P.
Routing - PLAN CHECK3/12/2004 4/26/2004  
Routing - PUBLIC WORKS4/26/2004 4/26/2004 PASS
Routing - FIRE3/11/2004 3/12/2004 PASS
Routing - PLAN CHECK2/9/2004 3/11/2004 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLUMBING2/6/2004 2/9/2004 PASS
PIPE R.P. DRAIN TO FLOOR SINK. MIN 2", ADDITIONAL CROSS CONNECTION PROTECTION MAY BE REQUIRED.
Routing - PUBLIC WORKS2/4/2004 2/6/2004 FAIL
Site plan doesn't match ROS6121 or easements. AEM
Plans ACCEPTED BY PLAN TECH  2/3/2004 PASS
Application received  1/30/2004  
Recd Pcfee & Taken To Pln CK  1/30/2004  
Fee Review-notes1/30/20041/30/2004