BLD-Final | 8/25/2004 | 8/26/2004 | 8/26/2004 | A | PASS |
Tony Young
|
|
|
Brad; phone# ###-####
call 1st,,, rolled over to next day 8/25/2004 5:04:45 P
c of o issued 8/26/2004 10:20:32 AM
|
DOC - Permit Finaled | 8/26/2004 | 8/26/2004 | 8/26/2004 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 8/26/2004 10:19:57 AM
|
BLD-Conference | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | NR |
Tony Young
|
|
|
brad; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 8/25/2004 | 8/25/2004 | 8/25/2004 | P | CANC |
Tony Young
|
|
|
bRAD;PHONE# ###-####
|
BLD-Grading Inspection | 8/20/2004 | 8/20/2004 | 8/20/2004 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 6/3/2004 | 6/7/2004 | 6/7/2004 | A | PART |
Tony Young
|
|
|
Brad; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
need int. shear later,,, ok to cover 6/7/2004 11:49:36 AM
|
BLD-Framing/Rough-in | 6/2/2004 | 6/2/2004 | 6/2/2004 | P | PART |
Tony Young
|
|
|
brad; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to insulate,,, will need int. shear later,,, also brace trusses per engineering,,, protect b-vent w/ shield?,, strap plates. ,etc 6/2/2004 3:44:52 PM
|
FIRE-Sprinkler Rough-in | 6/2/2004 | 6/2/2004 | 6/2/2004 | A | PASS |
Rick Jackson
|
|
|
okay to cover
|
BLD-Framing/Rough-in | 5/26/2004 | 5/28/2004 | 5/28/2004 | A | NR |
Tom Arcoraci
|
|
|
Brad; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs ok from fire 5/28/2004 11:39:05 AM
|
BLD-Framing/Rough-in | 4/16/2004 | 4/20/2004 | 4/20/2004 | A | PART |
Tony Young
|
|
|
brad shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs
ext. shear ok 4/20/2004 10:22:17 AM
|
BLD-Foundation | 3/10/2004 | 3/10/2004 | 3/10/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/10/2004 at 5:50:27 AM. Contact: ###-####.
wip 3/10/2004 2:10:18 PM
|
BLD-Footing | 3/8/2004 | 3/9/2004 | 3/9/2004 | A | PART |
Tony Young
|
|
|
LOGAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Grading Inspection | 3/9/2004 | 3/9/2004 | 3/9/2004 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 3/3/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DJO) | 2/13/2004 | 2/13/2004 | 2/20/2004 | | PASS |
Dan Overy
|
|
|
2/20/2004 10:47:47 DJO - activity updated through activity BLDA022 from case BLD04-00171.
|
Plan Reviewer's activity | | | 2/20/2004 | | DONE |
|
|
|
Tim Phillips left phone message about re-inforcing at isolated footing pads. Have red-lined plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/20/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2004 | | DONE |
|
|
|
left mess for brad that permit is ready but his esc permit has expired
|
Plan Reviewer's activity | | | 2/13/2004 | | |
|
|
|
have contacted both designer and builder about engineered re-inforcing specifications on footing pads 4 & 21. entry footing pad also need to be addressed.
|
Case Summary (BLD) | | | 2/13/2004 | | |
|
|
|
|
Plan Review Report | | | 2/13/2004 | | |
|
|
|
|
Pending Assignment by DJO | 2/3/2004 | | 2/13/2004 | | DONE |
Dan Overy
|
|
|
2/13/2004 14:15:20 DJO - activity updated through activity BLDA169 from case BLD04-00171.
|
Plans ACCEPTED BY PLAN CHECK | | | 2/13/2004 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/9/2004 | | 2/9/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - FIRE | 2/9/2004 | | 2/9/2004 | | DONE |
|
|
|
This house requires a 13D automatic fire sprinkler system, modified to include installation of a single row of dry sidewall sprinklers along the wall common between the attached garage and the living space.
|
Routing - PLANNING | 2/4/2004 | | 2/9/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/4/2004 | | 2/4/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 2/3/2004 | | 2/4/2004 | | PASS |
Rita DeYoung
|
|
|
APPROVED AS CATEGORY 3
|
Application received | | | 2/3/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 2/10/2004 | | | | |
|
|
|
|