BLD-Final | 5/27/2004 | 5/27/2004 | 5/27/2004 | P | PASS |
Tony Young
|
|
|
charlie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 5/27/2004 | 5/27/2004 | 5/27/2004 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 5/27/2004 4:10:59 PM
|
BLD-Energy code compliance | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | PASS |
Tom Arcoraci
|
|
|
charlie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 4/5/2004 | 4/6/2004 | 4/6/2004 | P | NR |
Russ Owen
|
|
|
charlie; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Posted a c/n to recall. 4/5/2004 10:34:53 PM
|
BLD-Framing/Rough-in | 3/30/2004 | 4/1/2004 | 4/1/2004 | A | PASS |
Tom Arcoraci
|
|
|
###-#### charlie
|
Inspection Record Card- Bld | | | 2/25/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/25/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/25/2004 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 2/24/2004 | 2/24/2004 | 2/24/2004 | | DONE |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | 2/24/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 2/24/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2004 | | |
|
|
|
|
Pending Assignment by DJO | 2/11/2004 | | 2/24/2004 | | DONE |
Dan Overy
|
|
|
2/24/2004 13:30:37 DJO - activity updated through activity BLDA169 from case BLD04-00229.
|
Plans ACCEPTED BY PLAN CHECK | | | 2/24/2004 | | |
|
|
|
|
Routing - PLANNING | 2/13/2004 | | 2/13/2004 | | PASS |
|
|
|
Paved driveway required. AKT
|
Routing - PUBLIC WORKS | 2/13/2004 | | 2/13/2004 | | PASS |
|
|
|
BENCH SEWER DISTRICT
|
Routing - PLANNING Land Div | 2/11/2004 | | 2/11/2004 | | PASS |
|
|
|
Repair to existing residence. Parcels on both sides have been developed with residences.
|
Application received | | | 2/11/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 2/18/2004 | | | | |
|
|
|
|