BLD-Final | 3/22/2005 | 3/23/2005 | 3/23/2005 | A | CANC |
Tony Young
|
|
|
TODD; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | PASS |
Tony Young
|
|
|
TODD; Phone #: ###-#### Internet Inspection Request from: Cathy Chile
|
DOC - Permit Finaled | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 3/23/2005 4:10:00 PM
|
BLD-Final | 11/26/2004 | 11/29/2004 | 11/29/2004 | P | NR |
Tony Young
|
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Jan Rice
need to finish fireplace, deck rail, etc.. 11/29/2004 3:33:24 PM
|
BLD-Grading Inspection | 11/29/2004 | 11/29/2004 | 11/29/2004 | | DONE |
|
|
|
Final grading and drainage has been conditionally approved. A $1,375.00 bond has been submitted to remove a portion of the driveway that is within 3 feet of the property line, repair non-functional roof drain system and remove uncontrolled fill in the rear yard.
|
BLD-Conference | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | PART |
Tony Young
|
|
|
todd- ###-####
conf. on final 11/18/2004 3:34:24 PM
|
BLD-Energy code compliance | 7/7/2004 | 7/8/2004 | 7/8/2004 | A | NR |
Tony Young
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 7/8/2004 | 7/8/2004 | 7/8/2004 | P | PASS |
Tony Young
|
|
|
Todd; phone# ###-####
|
BLD-Final | 7/1/2004 | 7/2/2004 | 7/2/2004 | A | NR |
Tony Young
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 7/2/2004 | 7/2/2004 | 7/2/2004 | P | PART |
Tony Young
|
|
|
ok to insulate,, c/n posted 7/2/2004 2:02:06 PM
|
BLD-Framing/Rough-in | 6/28/2004 | 6/29/2004 | 6/29/2004 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/28/2004 at 3:08:10 PM. Contact: ###-####.
need to get mech. rough and seal package,, conf. on f/blocks 6/29/2004 10:56:41 AM
|
BLD-Framing/Rough-in | 6/7/2004 | 6/7/2004 | 6/7/2004 | P | PART |
Tony Young
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ext. shear ok to cover 6/7/2004 3:40:18 PM
|
BLD-Framing/Rough-in | 6/1/2004 | 6/2/2004 | 6/2/2004 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/1/2004 at 2:43:34 PM. Contact: ###-####.
conf. only,,, need trades 1st,,, also need hold downs complete prior to shear inspection,,, need to have structural eng. go to site and give letter to as built 6/2/2004 3:16:26 PM
|
BLD-Conference | 5/12/2004 | 5/13/2004 | 5/13/2004 | A | PART |
Tony Young
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
frame issues,,, ok to cover drag strut 5/13/2004 11:54:16 AM
|
BLD-Foundation | 3/22/2004 | 3/22/2004 | 3/22/2004 | P | PART |
Tony Young
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 3/18/2004 | 3/18/2004 | 3/18/2004 | P | PART |
Tony Young
|
|
|
adam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Grading Inspection | 3/18/2004 | 3/18/2004 | 3/18/2004 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 3/9/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/5/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DJO) | 3/2/2004 | 3/2/2004 | 3/4/2004 | | DONE |
Dan Overy
|
|
|
|
Plan Reviewer's activity | | | 3/4/2004 | | DONE |
|
|
|
received lateral and overheight engineering. beam calcs included. ok to issue
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/4/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/4/2004 | | |
|
|
|
|
Print Occupancy Form | | | 3/4/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/4/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/3/2004 | | |
|
|
|
roof framing for area above stair core received on 3/3/04.
|
Plan Review Report | | | 3/2/2004 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/2/2004 | | |
|
|
|
missing lateral, overheight wall and beam engineering. roof framining by Western Truss will be faxed in before plan review is complete.
|
Case Summary (BLD) | | | 3/2/2004 | | |
|
|
|
|
Pending Assignment by DJO | 2/12/2004 | | 3/2/2004 | | DONE |
Dan Overy
|
|
|
3/2/2004 15:05:28 DJO - activity updated through activity BLDA169 from case BLD04-00236.
|
Plans ACCEPTED BY PLAN CHECK | | | 3/2/2004 | | PEND |
|
|
|
|
Routing - Erosion and Sediment | 2/24/2004 | | 2/25/2004 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - FIRE | 2/25/2004 | | 2/25/2004 | | DONE |
|
|
|
No fire sprinklers required - Arrowhead Ridge #1.
|
Routing - PLANNING | 2/20/2004 | | 2/24/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/20/2004 | | 2/20/2004 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 2/12/2004 | | 2/20/2004 | | FAIL |
Rita DeYoung
|
|
|
Grading plan must be modified to better indicate how retaining wall will be built. No soils report submitted.
|
Routing - PUBLIC WORKS GRADING | 2/20/2004 | | 2/20/2004 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3
|
Application received | | | 2/12/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 2/25/2004 | | | | |
|
|
|
|