BLD-Final | 11/16/2004 | 11/17/2004 | 11/17/2004 | A | PASS |
Jim Storey
|
|
|
peter Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 11/17/2004 | 11/17/2004 | 11/17/2004 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 11/17/2004 10:08:24 AM
|
Telephone call | | | 11/16/2004 | | DONE |
|
|
|
per George Slane cancel re-inspection fee
|
BLD-Final | 11/15/2004 | 11/15/2004 | 11/15/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/15/2004 at 6:07:36 AM. Contact: ###-####. Home ocupied before final occupancy approval. Unable to enter home without somebody to let me in to complete final inspection. Reinspection fee is required. 11/15/2004 1:45:17 PM
|
BLD-Final | 11/12/2004 | 11/12/2004 | 11/12/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/12/2004 at 7:21:00 AM. Contact: ###-####.ran out of time 11/12/2004 11:22:17 AM
|
BLD-Final | 11/12/2004 | 11/12/2004 | 11/12/2004 | P | NR |
Jim Storey
|
|
|
###-#### need mech permit for fire place insp. phone # listed not correct. 11/12/2004 3:26:41 PM
|
BLD-Conference | 10/4/2004 | 10/4/2004 | 10/4/2004 | P | DONE |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/4/2004 at 6:47:46 AM. Contact: ###-####. Pre final inspection 10/4/2004 2:13:40 PM
|
BLD-Energy code compliance | 6/1/2004 | 6/1/2004 | 6/1/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/1/2004 at 7:03:58 AM. Contact: ###-####. ok to cover 6/1/2004 2:27:00 PM
|
BLD-Energy code compliance | 5/28/2004 | 5/28/2004 | 5/28/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/28/2004 at 7:48:34 AM. Contact: ###-####. Need to remove insulation from b-vents and complete item 6 previous correction, positive connection at porch columns. 5/28/2004 4:05:07 PM
|
BLD-Framing/Rough-in | 5/24/2004 | 5/25/2004 | 5/25/2004 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/24/2004 at 9:18:11 PM. Contact: ###-####. C/N....Mainly Point loads 5/25/2004 12:34:59 PM
|
BLD-Foundation | 3/22/2004 | 3/22/2004 | 3/22/2004 | P | PART |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 3/19/2004 | 3/19/2004 | 3/19/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/19/2004 at 10:01:59 AM. Contact: ###-####.
|
BLD-Foundation | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | PART |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore basement walls 3/3/2004 9:39:46 AM
|
BLD-Footing | 2/27/2004 | 3/1/2004 | 3/1/2004 | P | PART |
Dave Hannah
|
|
|
###-#### Peter or pager ###-#### basement ftg ok to place 3/1/2004 3:41:33 PM
|
Issue PAID IN FULL permit | | | 2/27/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DJO) | 2/23/2004 | 2/23/2004 | 2/23/2004 | | DONE |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | 2/23/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 2/23/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/23/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/23/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2004 | | DONE |
|
|
|
spoke with Pete Sorensen -- permit is ready.
|
Pending Assignment by DJO | 2/13/2004 | | 2/23/2004 | | DONE |
Dan Overy
|
|
|
2/23/2004 09:48:39 DJO - activity updated through activity BLDA169 from case BLD04-00241.
|
Plans ACCEPTED BY PLAN CHECK | | | 2/23/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2004 | | DONE |
|
|
|
|
Application received | | | 2/13/2004 | | |
|
|
|
|
Routing - PLANNING | 2/13/2004 | | 2/13/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/13/2004 | | 2/13/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/13/2004 | | | | |
|
|
|
|