(F) Reprint permit | | | 12/29/2017 | | DONE |
|
|
|
|
BLD-Aging Inspection | 5/16/2005 | 5/16/2005 | 5/16/2005 | | PASS |
Jim Storey
|
|
|
t james passed
|
DOC - Permit Finaled | 5/16/2005 | 5/16/2005 | 5/16/2005 | A | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 11/5/2004 | 11/5/2004 | 11/5/2004 | | PASS |
Jim Storey
|
|
|
pending action from office to reiceve signd occ card. 11/5/2004 4:29:03 PM
|
BLD-Aging Inspection | 7/15/2004 | 7/15/2004 | 7/15/2004 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 5/4/2004 | 5/5/2004 | 5/5/2004 | A | PASS |
Troy James
|
|
|
Paul; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Final Inspection | 5/4/2004 | 5/5/2004 | 5/5/2004 | A | PASS |
Rick Jackson
|
|
|
PAUL; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 5/3/2004 | 5/4/2004 | 5/4/2004 | P | PASS |
Jim Storey
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes c/n made ok 5/4/2004 2:48:07 PM
|
BLD-Framing/Rough-in | 4/15/2004 | 4/16/2004 | 4/16/2004 | A | NR |
Jim Storey
|
|
|
paul shear wall; Phone #: ###-#### Internet Inspection Request from: Darla Downs complet fire walls to facia and soffit in attic. 4/16/2004 9:47:04 AM
|
BLD-Wall cover | 3/31/2004 | 4/1/2004 | 4/1/2004 | A | DONE |
Troy James
|
|
|
###-#### paul
ok to insulate. 4/1/2004 10:26:56 AM
|
BLD-Energy code compliance | 3/29/2004 | 3/29/2004 | 3/29/2004 | P | FAIL |
Troy James
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Plans call for 2 hr wall and contractor built 1 hr wall. Install 2 hr wall with requirements per the IBC or have architect redraw detail for 1 hour wall and resubmit plans for review. 3/29/2004 4:14:04 PM
|
BLD-Framing/Rough-in | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | PART |
Troy James
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Ok to sheetrock two hour walls at attic both sides and ok sheetrock 2 hour wall one side at living space. Checked windows for correct u-value ok to remove stickers per request from contractor. 3/19/2004 10:53:51 AM
|
Plan assigned to (M_P) | 2/24/2004 | | 3/10/2004 | | PASS |
Mike Phillips
|
|
|
3/10/2004 10:52:27 M_P - activity updated through activity BLDA022 from case BLD04-00293.
|
Routing - PLAN CHECK | 3/4/2004 | | 3/10/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/10/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/10/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/10/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/10/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/10/2004 | | DONE |
|
|
|
permit ready and fee due
|
Issue PAID IN FULL permit | | | 3/10/2004 | | DONE |
|
|
|
|
Routing - PLANNING | 2/26/2004 | | 3/3/2004 | | PASS |
|
|
|
Needs conditional use permit to restore grandfathered building which suffered burn damage in excess of 50% of its value.
This is a 4-plex in an R-2 zone for which no conditional use permit was ever issued.
UPDATE! New appraisal showed that cost to restore is LESS than 50% of cost of home.
|
Routing - PLAN CHECK | 2/24/2004 | | 2/26/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/24/2004 | | DONE |
|
|
|
No ESC submitted, should probably have a plan and permit. Involved parties sheet not signed. Took plans in per Mike P. kmm
|
Plan routing begun/TENANTS | | | 2/24/2004 | | DONE |
|
|
|
|
Application received | | | 2/23/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/23/2004 | | |
|
|
|
|
Fee Review-notes | 2/23/2004 | 2/23/2004 | | | |
|
|
|
|