FIRE-Final Inspection | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 11/7/2005 | 11/7/2005 | 11/7/2005 | A | DONE |
Mike Jordan
|
|
|
doug -; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie - ok for perm.
|
Letter of compliance | | | 11/7/2005 | | DONE |
|
|
|
Letter of Compliance issued 11-7-05.
|
BLD-Conference | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PEND |
Mike Jordan
|
|
|
On site with George Slain regarding handrail issues for temp. occ. As per George Slain, ok to build temp. returns on on side of stairway and make one side of railing continous with a sign noting to use compliant side only.
|
BLD-Conference | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 7/20/2005 | 7/20/2005 | 7/20/2005 | P | PART |
Mike Jordan
|
|
|
ok for temp occ.
|
BLD-Final | 7/19/2005 | 7/19/2005 | 7/19/2005 | P | NR |
Tom Arcoraci
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa hand rail issues need to be resolved for temp occ
|
FIRE-Alarm Testing | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm permit finaled
|
FIRE-Final Inspection | 7/19/2005 | 7/19/2005 | 7/19/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Renn Ross's permission until all door hardware has been installed and approved and the one hour room for the fire sprinkler riser is complete. Dead bolts need to be removed from the three storage rooms and indicators need to be installed on the balcony doors.
|
BLD-Framing/Rough-in | 7/15/2005 | 7/18/2005 | 7/18/2005 | A | NR |
Mike Jordan
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | CANC |
Troy Cobbley
|
|
|
Request for temp; ###-####
|
FIRE-Final Inspection | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | PASS |
Troy Cobbley
|
|
|
Paint curbs per sheet C-2, final fire alarm permit, provide one hour fire rated room per plans.
|
BLD-Conference | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | DONE |
Mike Jordan
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Code Occupancy Approval | | | 7/14/2005 | | PASS |
|
|
|
ALL IN AS REQUIRED FINAL SIGNED OFF.
|
FIRE-Final Inspection | 7/13/2005 | 7/13/2005 | 7/13/2005 | P | FAIL |
Troy Cobbley
|
|
|
Need to provide for fire dept access as discussed, shell drawings don't match what has been built, sprinkler riser room is supposed to be 1 hour rated and is not, provide address on Swordfish side of building, final fire alarm permit, need to test emergency lighting and exit signs and verify door hardware and extinguishers.
|
Code Occupancy Approval | | | 7/11/2005 | | FAIL |
|
|
|
NO HANDICAPPED SIGNS, MISSING SOME LANDSCAPE AND TREES ALONG EMERALD. ISSUED CORRECTION NOTICE
|
BLD-Framing/Rough-in | 6/17/2005 | 6/17/2005 | 6/17/2005 | P | PASS |
Mike Jordan
|
|
|
ceiling grid///doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. 2nd floor ok
|
PubWorks Occupancy Approval | 5/12/2005 | 5/12/2005 | 5/12/2005 | | DONE |
|
|
|
Drainage project found complete 5/15/05. R.Rokovitz
|
BLD-Conference | 5/3/2005 | 5/4/2005 | 5/4/2005 | A | PART |
Jim Sly
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Talked to Doug... Owners want to open W/O interior doors installed (carpet to be installed 1st) This is on T/I permit...... Need OK from Fire inspector before approving. 5/4/2005 9:54:44 AM 5/4/2005 10:03:18 AM
|
CHANGE STATUS TO (ISS) | | | 1/31/2005 | | DONE |
|
|
|
permit paid in full.
|
Plan assigned to (JCM) | 10/20/2004 | | 11/3/2004 | | PASS |
|
|
|
11/3/2004 08:57:33 JCM - activity updated through activity BLDA022 from case BLD04-00300.
|
Plan Reviewer's activity | | | 11/3/2004 | | PASS |
|
|
|
Reviewed and approved plan modification to revise central stair configuration and associated second floor modifications. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/21/2004 | | DONE |
|
|
|
Received for the plan mod. four sheets of A-10 and eight sets of sheets S-2,S-3,S-4,S-7, taken to John M.
|
Plan Modification Accepted | | | 10/19/2004 | | DONE |
|
|
|
Plan mod. acceped for bld04-00300 for the redesign of the entry stair on sheets A-1,A-2,A-3,A-4,M-1.1,M-1.2,M-2.0,P-1.1,P-1.2,P-2.0,E-0,E-1,E-2,E-3,E-4,E-5 taken to John M.
|
CHANGE STATUS TO (REV) | | | 10/19/2004 | | DONE |
|
|
|
Plan mod. for the change of the stairs and some significate changes to the plans.
|
BLD-Other | 7/30/2004 | 8/2/2004 | 8/2/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 7:52:05 AM. Contact: ###-####. mti on site 8/2/2004 8:58:50 AM
|
BLD-Footing | 6/2/2004 | 6/3/2004 | 6/3/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/2/2004 at 5:17:19 PM. Contact: ###-####. 6/3/2004 1:59:14 PM Tilt walls.... MTI special inspection. 6/3/2004 2:02:27 PM
|
BLD-Footing | 5/20/2004 | 5/21/2004 | 5/21/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 2:52:04 PM. Contact: ###-####. Footings for South and West walls pending MTI special inspections, reports and approvals. 5/21/2004 3:45:51 PM
|
BLD-Footing | 4/29/2004 | 4/30/2004 | 4/30/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/29/2004 at 3:08:23 PM. Contact: ###-####. Met with Stan (job super) and discussed special insp Req Etc.....MTI is the special insp agency.....Soils report OK......Pouring center footing pads and footings for stair towers......OK pending special inspection reports and approvals from MTI. 4/30/2004 11:11:11 AM
|
(F) Reprint permit | | | 4/26/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 4/12/2004 | | 4/23/2004 | | |
|
|
|
|
Routing - PLANNING Land Div | 4/23/2004 | | 4/23/2004 | | PASS |
|
|
|
Approved as Parcel "A" on ROS 6454 recorded March 29, 2004.
|
Routing - PLAN CHECK | 4/23/2004 | | 4/23/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/23/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/23/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/23/2004 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 2/26/2004 | | 4/23/2004 | | PASS |
John Menard
|
|
|
4/23/2004 16:22:26 JCM - activity updated through activity BLDA022 from case BLD04-00300.
|
Routing - PUBLIC WORKS | 4/5/2004 | | 4/12/2004 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/5/2004 | | 4/9/2004 | | PASS |
|
|
|
Contacted PDQ to take resubmitted plans of 4/2/04 to outside engineering. Received fax from consulting structural engineer approving resubmitted structural documents. JCM
|
Plan Reviewer's activity | | | 4/5/2004 | | PASS |
|
|
|
Reviewed and approved resubmittals. JCM
|
Routing - PLANNING Land Div | 4/5/2004 | | 4/5/2004 | | FAIL |
|
|
|
Need to sign Notice of Buildable Parcel. Document needs to be recorded and copy submitted to Development Services Staff along with recorded deed and new Tax Parcel Number. Called Nicole at Tealey's on April 5, 2004.
|
Routing - PLAN CHECK | 3/31/2004 | | 4/5/2004 | | |
|
|
|
|
Plan resubmittals received | | | 4/2/2004 | | DONE |
|
|
|
Received response letter, letter of transmittal, three copies of structural calculation, two copies of sheets A-6,A-10, three sets of sheets S-3,S-4,S-5,S-6,S-8,S-9,S-10,S-11,S-12,S-13,S-14, taken to John M.
|
Routing - FIRE | 3/29/2004 | | 3/30/2004 | | PASS |
|
|
|
REsubmittal acceptable.
|
Plan resubmittals requested | | | 3/29/2004 | | |
|
|
|
Faxed the architect a request for additional revisions. JCM
|
Routing - PLAN CHECK | 3/16/2004 | | 3/29/2004 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 3/25/2004 | | DONE |
|
|
|
Received one copy of response letter and two copies of revised sheets A-6, A-10, A-13, M-4.0. Routed to John M. kmm
|
Plan resubmittals requested | | | 3/24/2004 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Plan Review Completed(1st rev) | | | 3/15/2004 | | FAIL |
|
|
|
Failed all departments except Plumbing & ESC.
|
Routing - PLANNING | 3/11/2004 | | 3/12/2004 | | PASS |
|
|
|
Approved per DRH03-167 and Mod. #1.
|
Plan resubmittals requested | | | 3/11/2004 | | |
|
|
|
Mailed the architect a copy of the cover letter and plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 3/5/2004 | | 3/11/2004 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 3/9/2004 | | DONE |
|
|
|
Received five copies of revised sheets SP-1 & L-1. Routed to Jason B. kmm
|
Routing - PLUMBING | 3/4/2005 | | 3/4/2004 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PLANNING | 3/4/2004 | | 3/4/2004 | | FAIL |
|
|
|
Sarah Schafer DRH03-00167 Mod #1
Does not meet the setback requirements along Golden Trout or the conditions of approval for the landscaping. Spoke with Donna from Cornel Larson's office about these items.
|
Routing - Erosion and Sediment | 3/2/2004 | | 3/3/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 2/26/2004 | | 3/2/2004 | | FAIL |
|
|
|
3:1 side slopes per Brian M. kmm
|
Routing - PLANNING Land Div | 2/26/2004 | | 2/26/2004 | | FAIL |
|
|
|
Need to complete ROS04-00005, submitted on February 23, 2004.
|
Plans ACCEPTED BY PLAN TECH | | | 2/26/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/26/2004 | | DONE |
|
|
|
|
Application received | | | 2/24/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/24/2004 | | DONE |
|
|
|
|
Routing - FIRE | 3/12/2004 | | 3/15/2003 | | FAIL |
|
|
|
Hydrant and AS valving issues. Review comments faxed to architect.
|
Fee Review-notes | 2/24/2004 | 2/24/2004 | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/26/2004 | | | | |
|
|
|
Contacted PDQ for outside engineering.
|
Routing - PLAN CHECK | 10/19/2004 | | | | |
|
|
|
Plan Mod.
|