Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00384
StatusFinaled
Name STEIN DISTRIBUTING COMPANY INC
Site Address 601 N PHILLIPPI ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(STEIN DISTRIBUTING) To install a 10 foot wide connecting enclosed accessway between two existing warehouse buildings which are 5 feet apart per approved plans on file. The property line was removed under Record of Survey #6431. The warehouse on the west side is not fire sprinklered. The warehouse/office on the east side is fire sprinklered. The opening will be protected with a fire door, this wall will be considered a two hour fire separation wall for purpose of separating and maintaining two separate buildings. Planning approval granted with signature on plans by Sarah Schafer. Any alterations to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (PC#114-04) Rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/20/20055/20/20056/17/2005 DONE
Second Notice has not been responded to. Received final cert of value.rad
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice Sent 10/11/20044/26/2005 DONE
DOC - Permit Finaled10/11/200410/11/200410/11/2004APASS
DetailsTom Arcoraci
Finaled by inspector at 10/11/2004 11:25:08 AM
FIRE-Final Inspection10/11/200410/11/200410/11/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled 10/11/2004 11:03:27 AM
BLD-Final10/11/200410/11/200410/11/2004APASS
DetailsTom Arcoraci
FIRE-Final Inspection10/5/200410/6/200410/6/2004AFAIL
DetailsTroy Cobbley
Need sprinkler protection in corridor and the building plans show a 1 1/2 hour fire door which is not installed 10/6/2004 12:08:30 PM
BLD-Final10/5/200410/6/200410/6/2004ANR
DetailsTom Arcoraci
gary--pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--call 1st before insp 1 hr ???
BLD-Final10/6/200410/6/200410/6/2004PCANC
DetailsTom Arcoraci
BLD-Aging Inspection9/6/20049/6/20049/6/2004 NR
DetailsTom Arcoraci
BLD-Framing/Rough-in7/6/20047/6/20047/6/2004PPASS
DetailsTom Arcoraci
gary; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing4/8/20044/9/20044/9/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/8/2004 at 11:44:23 AM. Contact: ###-####.
BLD-Footing4/7/20044/8/20044/8/2004APASS
DetailsTom Arcoraci
Dave; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes spec insp 4/8/2004 9:07:01 AM
Issue PAID IN FULL permit  4/2/2004 DONE
Routing - PLAN CHECK3/29/2004 3/30/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/30/2004 DONE
Inspection Record Card- Bld  3/30/2004 DONE
Permit Ready to Issue  3/30/2004 DONE
Telephone call  3/30/2004 DONE
spoke with Tom -- permit is ready.
Plan assigned to (R_H)3/17/2004 3/30/2004 PASS
Details
3/30/2004 09:37:17 RMH - activity updated through activity BLDA022 from case BLD04-00384.
Plan Review Completed(1st rev)  3/29/2004  
Routing - FIRE3/25/2004 3/29/2004 PASS
DetailsBill Alexander
Case Summary (BLD)  3/25/2004 DONE
Routing - PLAN CHECK3/19/2004 3/25/2004 PEND
No corrections requried by buildng department review, plans routed to fire department on 3/25/04, Permit pending fire departments approval
Routing - Erosion and Sediment3/17/2004 3/18/2004 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS3/17/2004 3/17/2004 PASS
Plan resubmittals received  3/9/2004 DONE
Received ESC application with two sets of esc plans and narrative with two structural calculations put with plans.
Plans ACCEPTED BY PLAN TECH  3/8/2004 FAIL
Requires struct. clacs. and ESC permit and plan. kmm
Application received  3/5/2004  
Recd Pcfee & Taken To Pln CK  3/5/2004  
Fee Review-notes3/5/20043/5/2004