Telephone call | | | 11/28/2005 | | DONE |
|
|
|
Left voice message for Randy (TML) to ask why no permit pulled for exhaust bath fans???11/28/05 @4:00pm BAS
|
Telephone call | | | 11/3/2005 | | DONE |
|
|
|
Left message for Randy (TML) to call me to pull a MEC permit on this as one was not done per Matt for $6,185 for the exhaust bath fans///11/3/05 BAS
|
Telephone call | | | 10/31/2005 | | DONE |
|
|
|
Left message for Matt Smith (Person who signed the Cert of Value) that there is no MEC permit///10/31/05 BAS
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/2/2005 | 4/26/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/17/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/2/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10435 issued 2-2-05 to the Downtown Storage Center.
|
BLD-Final | 1/28/2005 | 1/31/2005 | 1/31/2005 | A | DONE |
Dave Hannah
|
|
|
Darrin-call before you go; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Final | 1/28/2005 | 1/31/2005 | 1/31/2005 | A | PASS |
Dave Hannah
|
|
|
Darrin-call before you go; Phone #: ###-#### Internet Inspection Request from: Jan Rice all c/n items completed ok for perm occ 1/31/2005 12:50:45 PM
|
Permanent Occupancy | | 1/31/2005 | 1/31/2005 | | DONE |
|
|
|
|
BLD-Final | 1/27/2005 | 1/28/2005 | 1/28/2005 | P | FAIL |
Troy James
|
|
|
Darrin; Phone #: ###-#### Internet Inspection Request from: Jan Rice need handicap signage to restrooms and lower towel dispenser to 48" max high 1/28/2005 2:55:57 PM
|
FIRE-Final Inspection | 1/24/2005 | 1/26/2005 | 1/26/2005 | A | NR |
Rick Jackson
|
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need to complete sprinkler/alarm permits 1/26/2005 11:32:38 AM
|
FIRE-Final Inspection | 1/26/2005 | 1/26/2005 | 1/26/2005 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 1/19/2005 | 1/21/2005 | 1/21/2005 | P | PART |
Dave Hannah
|
|
|
Darren-screw patern inspection; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to tape demisings wall 1/21/2005 1:17:55 PM
|
BLD-Framing/Rough-in | 1/13/2005 | 1/14/2005 | 1/14/2005 | A | PART |
Dave Hannah
|
|
|
darin Note: screw pattern inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to tape and texture second half of project 1/14/2005 9:36:43 AM
|
FIRE-Conference | 1/11/2005 | 1/12/2005 | 1/12/2005 | A | PART |
Rick Jackson
|
|
|
darren ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Reviewed placement of fire extinguishers; eict signs/emergency lights are not installed; will schedule testing of alarms/life safety at one time 1/12/2005 9:16:55 AM
|
FIRE-Final Inspection | 1/11/2005 | 1/11/2005 | 1/11/2005 | P | CANC |
Rick Jackson
|
|
|
Wrong permit added by inspector 1/11/2005 1:48:07 PM
|
BLD-Framing/Rough-in | 1/4/2005 | 1/4/2005 | 1/4/2005 | P | PART |
Dave Hannah
|
|
|
darin Note: screw pattern on sheet rock; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie east half ok to tape 1/4/2005 1:24:17 PM
|
BLD-Framing/Rough-in | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | PART |
Troy James
|
|
|
Darrin; Phone #: ###-#### Internet Inspection Request from: Jan Rice
Need to check sheetrock nailing for shear 12/7/2004 10:17:24 AM
|
BLD-Framing/Rough-in | 11/23/2004 | 11/23/2004 | 11/23/2004 | P | PART |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell ok to cover one side of walls 11/23/2004 2:23:24 PM
|
Plan Reviewer's activity | | | 10/21/2004 | | PASS |
|
|
|
Two accessible restrooms will be provided to satisfy the obligation to upgrade under the "20% rule". Modified drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/21/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/21/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/21/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/21/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 10/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/21/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Override - Parcel Holds | | | 10/21/2004 | | |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 10/21/2004 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/21/2004 | | DONE |
|
|
|
paid hourly fee for modification changed to issued status
|
Plan resubmittals received | | | 10/20/2004 | | |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets A-1,A-2 Taken to Carl Westfall...
|
Plan Reviewer's activity | | | 10/19/2004 | | |
|
|
|
Failed 1st review. The modified drawings could NOT be approved. The architect had proposed upgrading a restroom to be accessible to the disabled instead of installing the elevator. Insufficient funds are proposed for the restroom upgrades. At least $16,000 is required to be spent. Waiting for drawings showing where the money will be spent to full fill the obligation to upgrade under the "20% rule".
|
CHANGE STATUS TO (REV) | | | 10/12/2004 | | DONE |
|
|
|
Received drawings for plan modification.
|
Issue PAID IN FULL permit | | | 8/23/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/3/2004 | | 8/3/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/3/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/3/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/3/2004 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2004 | | DONE |
|
|
|
left a message for Cornel -- permit is ready.
|
Plan assigned to (CJW) | 3/17/2004 | | 8/3/2004 | | PASS |
Carl Westfall
|
|
|
8/3/2004 10:58:32 CJW - activity updated through activity BLDA022 from case BLD04-00421.
|
Routing - FIRE | 7/29/2004 | | 8/2/2004 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 7/30/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Sets of A-3,A-4 ... Taken to Carl Westfall....
|
Routing - PLAN CHECK | 7/28/2004 | | 7/29/2004 | | DONE |
|
|
|
|
Routing - FIRE | 7/26/2004 | | 7/28/2004 | | |
|
|
|
Failed 2nd IFC plan review. Resubmittal did not address any of the Fire review comments. Revised comments to address an elevator which has been added to the Scope. Faxed review to architect.
|
Routing - PLAN CHECK | 3/31/2004 | | 7/26/2004 | | PASS |
|
|
|
The drawings were approved, with clarifications, after the resubmittal review.
|
Plan resubmittals received | | | 7/13/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Sets of 0, A-1, A-2, A-3, Taken to Carl Westfall
|
Routing - PLANNING | 3/30/2004 | | 3/31/2004 | | PASS |
|
|
|
Ok per discussion with Scott Spjute. There is no need for a legal non-conforming use expansion. There are no exterior changes therefore no DR required.
|
Plan Review Completed(1st rev) | | | 3/29/2004 | | FAIL |
|
|
|
failed Planning and Fire
|
Routing - FIRE | 3/25/2004 | | 3/29/2004 | | |
Bill Alexander
|
|
|
Failed 1st IFC plan review. Need more information relating to rack storage issues and existing fire protection system to verify the IFC.
|
Routing - PLAN CHECK | 3/22/2004 | | 3/25/2004 | | |
|
|
|
Failed first IBC plan review. The IBC plan review was started March 22, 2004 and was finished March 25, 2004. Resubmitted drawings were required. See the plan review report.
|
Routing - PLANNING | 3/18/2004 | | 3/19/2004 | | |
|
|
|
Failed 1st Planning review. Scott Spjute.
This application will require a Conditional Use Permit modification, because a non-conforming use is expanding. There does not appear to be any Design Review related issues (exterior work). If the applicant is adding an exit stair, Design Review Staff would be willing to sign off on that in the routed plans without a zoning certificate.
|
Routing - PUBLIC WORKS | 3/17/2004 | | 3/18/2004 | | PASS |
|
|
|
|
Application received | | | 3/11/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/11/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/11/2004 | | DONE |
|
|
|
Carl W.
|
Fee Review-notes | 3/11/2004 | 3/11/2004 | | | |
|
|
|
|