Permit Information
Permit NumberBLD04-00422
StatusFinaled
Name JAVA ON MAIN
Site Address 223 N 6TH ST
Project NameEAGLES CENTER-1ST FLR
Customer Number 
ePlanReviewNo
Description
(JAVA ON MAIN - EAGLES CENTER - 1ST FLR) Fire sprinklers substitute for 1-hr fire-resistance-rated construction of the building. To convert an existing 1,575 square foot tenant space to a coffee shop and bakery. This space is located on the first story of a 4 story building. The 1994 UCBC and the 2000 IBC were used to regulate the conversion. Processes that produce grease laden vapors or smoke are NOT allowed in this tenant space. Work is to include interior nonbearing walls, a new concrete landing at the Idaho Street entrance, a Type II exhaust hood, interior finishes, and millwork all per the approved drawings and the plan review report on file. The occupant load of the dining area (63) shall be posted in a conspicuous place near the main exit. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/27/2005 DONE
Telephone call  10/12/2005 DONE
Called Sonja (debest) and asked for contracts due to final value discrepancies///10/12/05 BAS
Third Notice BLD5/20/20055/20/20056/17/2005 DONE
Second Notice has not been responded to.
Telephone call  6/17/2005 DONE
Left message for Michael Nigh (GC) for contracts due to difference in values///6/17/05 3:05pm BAS
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 7/12/20044/26/2005 DONE
Permanent Occupancy 7/12/20047/12/2004 DONE
Details
Permanent occupancy UNPAID FEE  7/12/2004 DONE
Perm. Occ. Cert. # 10223 issued 7-12-04 to Java On Main.
FIRE-Final Inspection7/8/20047/9/20047/9/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 7/8/2004 at 6:45:23 PM. Contact: ###-####.
BLD-Final7/8/20047/9/20047/9/2004PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/8/2004 at 6:47:01 PM. Contact: ###-####.ok for perm occ 7/9/2004 4:02:57 PM
BLD-Final7/8/20047/8/20047/8/2004PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/7/2004 at 1:10:08 PM. Contact: ###-####.
BLD-Final7/7/20047/8/20047/8/2004ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/7/2004 at 1:10:08 PM. Contact: ###-####.
FIRE-Final Inspection7/7/20047/7/20047/7/2004PFAIL
DetailsRick Jackson
Occupant load sign; rated access door for dampers in shaft on third floor; extinguisher; skirting around top of refer unit; sprinkler obstruction in north corner by storage too close to head 7/7/2004 4:24:00 PM
BLD-Wall cover7/7/20047/7/20047/7/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/7/2004 at 8:43:08 AM. Contact: ###-####. 1hr and 2 hr shafts ok to cover 7/7/2004 4:06:19 PM
BLD-Wall cover7/5/20047/6/20047/6/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/5/2004 at 4:52:54 PM. Contact: ###-####. ok to cover two hr shaft 3rd and 4th floors only problem with joist and beams in ceiling and roof 7/6/2004 10:27:15 AM
BLD-Conference7/1/20047/2/20047/2/2004ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/1/2004 at 6:13:41 PM. Contact: ###-####.
BLD-Wall cover6/1/20046/2/20046/2/2004ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/1/2004 at 1:57:42 PM. Contact: ###-####.
BLD-Wall cover6/2/20046/2/20046/2/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/1/2004 at 1:57:42 PM. Contact: ###-####. ok to start covering walls 6/2/2004 3:41:23 PM
BLD-Wall cover5/28/20046/1/20046/1/2004AFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 5/28/2004 at 4:31:51 PM. Contact: ###-####. No plans on site. 6/1/2004 11:21:03 AM
Issue PAID IN FULL permit  5/5/2004 DONE
Permit Ready to Issue  4/19/2004  
Inspection Record Card- Bld  4/19/2004  
Print Occupancy Form  4/19/2004 DONE
Telephone call  4/19/2004  
left mess that permit is ready for michael nigh(contractor) & jim murray(applicant)
Routing - Erosion and Sediment4/15/2004 4/16/2004 PASS
ESC waiver approved with conditions attached to plans.
Routing - PLAN CHECK4/16/2004 4/16/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/16/2004 DONE
Plan assigned to (CJW)3/17/2004 4/16/2004 PASS
DetailsCarl Westfall
4/16/2004 12:19:46 CJW - activity updated through activity BLDA022 from case BLD04-00422.
Routing - PLAN CHECK4/13/2004 4/15/2004  
Plan resubmittals received  4/15/2004 DONE
Received response letter to Jim Rogers with ESC application, copy of check stub and transmittal letter taken to Carl W.
Routing - Erosion and Sediment4/12/2004 4/13/2004 FAIL
Require a ESC permit and a waiver request letter. Contacted James Murray, CSHQA.
Routing - PLAN CHECK4/12/2004 4/12/2004 PASS
Drawings approved, with clarifications, after resubmittal review.
Plan resubmittals received  4/9/2004 DONE
Received letter of transmittal, response letter, two copies of structural calculations taken to Carl W.
Routing - PLUMBING4/7/2004 4/9/2004 PASS
per ,plans and 2000 upc, if routing is not per plans provide as builts at the end of the job ot archive.
Routing - Erosion and Sediment4/8/2004 4/8/2004 FAIL
No esc permit application or waiver letter attached to plans. Informed contact on plans.
Routing - PLAN CHECK4/2/2004 4/7/2004  
Failed 2nd IBC plan review.
Plan resubmittals received  4/2/2004 DONE
Received response letter, two structural design calculations, two sets of sheets A0.2,A2.1,M0.1,M2.1,P0.1,P2.1,E1.0 taken to Carl W.
Routing - FIRE3/30/2004 4/1/2004 PASS
Routing - PLAN CHECK3/24/2004 3/30/2004  
Failed 1st IBC plan review. The IBC plan review was started March 25, 2004 and was finished March 30, 2004. Resubmitted drawings were required. See the plan review report. A copy was E-mailed to the architect.
Routing - PLUMBING3/23/2004 3/24/2004  
Failed 1st UPC plan review. note 10 provide vents per upc901, if an automatic soap dispensor is installed at the mop sink provide a water supply for it, provide thermol expantion protection properly sized at the water heater, additional cross connection protection may be required, waste system is undersized, provide drainage for hand sink required by cdhd at coffee area.
Routing - PUBLIC WORKS3/17/2004 3/23/2004 PASS
Plans ACCEPTED BY PLAN TECH  3/12/2004 DONE
Application received  3/11/2004  
Recd Pcfee & Taken To Pln CK  3/11/2004  
Fee Review-notes3/11/20043/11/2004