Permit Information
Permit NumberBLD04-00429
StatusFinaled
Name GINO'S PIZZARIA & GELATO CAFE
Site Address 150 N 8TH ST Unit: 217
Project NameCAPITAL TERRACE
Customer Number 
ePlanReviewNo
Description
(GINO'S PIZZARIA & GELATO CAFE - GREASE HOOD INSTALLATION - CAPITAL TERRACE - 2ND FLR) (6-1-04) A PLAN MODIFICATION WAS APPROVED TO CONSTRUCT COUNTERS AND WALLS AT THE KITCHEN. This building is fire sprinklered to comply with high-rise provisions of the building code. To install a grease hood over a new fryer, charbroiler, and two ranges within an existing kitchen serving an existing restaurant located on the 2nd floor of the Capitol Terrace building. This restaurant was created under permit BLD01-02724 with a Certificate of Occupancy (#9038) issued on February 22, 2002. The type of food being prepared and served is changing. This tenant space shall be maintained in compliance with the drawings and the plan review report approved under permit BLD01-02724. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/15/20049/15/20049/15/2004PPASS
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection9/15/20049/15/20049/15/2004APASS
DetailsRick Jackson
Letter of compliance  9/15/2004 DONE
Letter of Compliance issued 9-15-04.
BLD-Final9/9/20049/9/20049/9/2004PNR
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs fire sp and alm sign off 9/9/2004 3:39:02 PM
BLD-Aging Inspection9/2/20049/2/20049/2/2004 PASS
DetailsDave Hannah
wip 9/2/2004 8:17:32 AM
BLD-Framing/Rough-in6/9/20046/9/20046/9/2004PPASS
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Plan Reviewer's activity  6/1/2004 PASS
Plan modification was approved. No additional sewer fees required.
Inspection Record Card- Bld  6/1/2004 DONE
(F) Reprint permit  6/1/2004 DONE
BLD-Conference5/20/20045/21/20045/21/2004AFAIL
DetailsDave Hannah
Dave; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 5/21/2004 9:43:50 AM using wood construction in a type1fr bldg with no plans for this change submit plans 5/21/2004 9:45:18 AM
Issue PAID IN FULL permit  4/9/2004 DONE
Routing - PLAN CHECK4/5/2004 4/5/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/5/2004 DONE
Print Occupancy Form  4/5/2004 DONE
Permit Ready to Issue  4/5/2004 DONE
Telephone call  4/5/2004 DONE
permit ready and fee due
Plan assigned to (CJW)3/17/2004 4/5/2004 PASS
DetailsCarl Westfall
4/5/2004 13:55:58 CJW - activity updated through activity BLDA022 from case BLD04-00429.
Routing - FIRE4/1/2004 4/2/2004 PASS
Routing - PLAN CHECK3/24/2004 4/1/2004 PASS
IBC plan review started March 30, 2004 and was finished April 1, 2004. The drawings were approved with clarifications. See the plan review report.
Routing - PLUMBING3/18/2004 3/24/2004 PASS
add a hand sink in scullery indirect to floor sink, per plans and 2000 upc
Routing - PUBLIC WORKS3/17/2004 3/18/2004 PASS
Plans ACCEPTED BY PLAN TECH  3/15/2004 DONE
CDHD noted on the plans that they needed to add a sink, may require a plumbing plan.
Application received  3/11/2004  
Recd Pcfee & Taken To Pln CK  3/11/2004 DONE
Fee Review-notes3/11/20043/11/2004