Telephone call | | | 4/30/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with a gentelman named Wayne. Let him know I checked with the Building department about his crawl space flooding problem. Let him know this issue is a civil matter between the property owner and the original contractor. I gave him some drainage contractors names out of the telephone book and suggested he contact one of them to investigate the cause of the water in his crawl space.
|
Case Summary (BLD) | | | 4/26/2012 | | DONE |
Sam Zahorka
|
|
|
|
Meeting | | | 4/26/2012 | | DONE |
Sam Zahorka
|
|
|
Meeting with three gentleman about water in their crawl space. Gave them copies of the 2000 IRC for drainage. Suggested they contact the builder, United Water, or a contractor to identify reasons. They stated water is not coming from the ground surface through foundation vents. They described water penetrating through the foundation stem wall footing joint.
|
BLD-Framing/Rough-in | 5/24/2004 | 5/25/2004 | 5/25/2004 | P | PASS |
Jim Sly
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 5/25/2004 | 5/25/2004 | 5/25/2004 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 5/25/2004 | 5/25/2004 | 5/25/2004 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 5/25/2004 2:49:21 PM
|
BLD-Conference | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 4/27/2004 | 4/28/2004 | 4/28/2004 | P | PASS |
Troy James
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 4/27/2004 | 4/27/2004 | 4/27/2004 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/27/2004 at 7:03:38 AM. C/N posted. 4/27/2004 1:50:27 PM
|
BLD-Foundation | 4/7/2004 | 4/8/2004 | 4/8/2004 | A | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/7/2004 at 5:40:24 AM. Contact: ###-####.
|
BLD-Footing | 4/7/2004 | 4/7/2004 | 4/7/2004 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/7/2004 at 5:39:59 AM. Contact: ###-####. work in progress, unable to determine front set back at garage due to no wall in place and dirt mound. 4/6/2004 6:15:05 PM
|
Issue PAID IN FULL permit | | | 4/1/2004 | | DONE |
|
|
|
|
Pending Assignment by DJO | 3/15/2004 | | 3/25/2004 | | DONE |
Dan Overy
|
|
|
3/25/2004 09:23:01 PEP - activity updated through activity BLDA176 from case BLD04-00442.
|
Plan assigned to (PEP) | 3/25/2004 | | 3/25/2004 | | PASS |
Perry Paine
|
|
|
3/25/2004 13:31:11 PEP - activity updated through activity BLDA022 from case BLD04-00442.
|
Case Summary (BLD) | | | 3/25/2004 | | |
|
|
|
|
Plan Review Report | | | 3/25/2004 | | |
|
|
|
|
Plan Review Report | | | 3/25/2004 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/25/2004 | | DONE |
|
|
|
called ###-#### left message with recept. that REScheck is required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/25/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/25/2004 | | DONE |
|
|
|
|
Telephone call | | | 3/25/2004 | | DONE |
|
|
|
permit ready and fee due
|
Routing - PUBLIC WORKS | 3/17/2004 | | 3/18/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 3/15/2004 | | 3/17/2004 | | PASS |
|
|
|
|
Application received | | | 3/15/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 3/18/2004 | | | | |
|
|
|
|